| 1 | Comprehensive maintenance/ servicing and testing of RO plant including washing, cleaning of sedimentation filter, disinfection process, servicing of pressure pumping set and dosing unit complete at so as to supply qualitative water at permissible level of TDS.Note:- (a) Spares required for replacement will measured and paid separately under respective items of this schedule. (b) The rate quoted by the tenderer includes cost of maint/ servicing of above said plant once in a period of 90 days till the date of completion of work.(c) Servicing should be done by OEM/ authorized agency and not by any local mechanic.(d) Contractor shall be produce all purchase voucher and test certificate before submitted RAR.(e) Replacement of sedmentation filter in each visit is deemed to be included in the unit rate. |
| 2 | Supply and fixing in replacement RO membrane as existing for 50/60 Ltrs RO plant complete all as specified and directed. |
| 3 | Supply and fixing in replacement RO membrane Housing as existing 50/60 ltrs RO plant complete all as specified and directed. |
| 4 | Supply and fixing in replacement carbon filter for 50/60 LPH Ltrs RO plant complete all as specified and directed. |
| 5 | Supply and fixing in replacement spun/cartridge filter for 50/60 Ltrs RO plant all as specified and directed. |
| 6 | Supply and fixing in replacement 1/2 Pipe for 50/60 Ltrs RO plant complete all as specified and directed. |
| 7 | S&F in replacement booster pump 48 VDC/raw water pump/dosing pump suitable for 50/ 60 Ltrs RO plant complete all as specified and directed. |
| 8 | S&F in replacement of water controler sensor/control panel for 50/60 Ltrs RO plant. |
| 9 | Supply and fix in replacement solenoid valve for 50/60 Ltrs RO plant. |
| 10 | Supply and fixing in anti scalant chemical.all as directed by Engineer in charge complete all as specified and directed. |
| 11 | Supply and fixing in replacement low/ high pressure AC/DC switch of 50/60 Ltrs RO plant complete all as specified and directed. |
| 12 | Dismantling, cleaning and overhauling of 0.25/0.5 HP centrifugal mono block pump set/ pressure booster pump set of the following capacities including rewinding of motor with appropriate super enameled copper wire of existing gauge, replacement of bearing - 02 Nos, including all connection and testing complete for following unsv replacement of parts:-(i) Replacement of bush (gland). (ii) Replacement of pump shaft. (iii) Replacement of impeller. (iv) Replacement of shaft sleeve. Note: Except winding material, all unserviceable components of Pump-Motor will be replaced by the contractor and are inclusive rate in job) complete all as specified and as directed. |
| 13 | Dismantling, cleaning and overhauling of 01-03HP submersible pump set of the following capacities including rewinding of motor with appropriate super enameled copper wire of existing gauge, replacement of bearing - 02 Nos, including all connection and testing complete for following unsv replacement of parts:-(i) Replacement of bush (gland). (ii) Replacement of pump shaft.(iii) Replacement of impeller. (iv) Replacement of shaft sleeve. Note: Except winding material, all unserviceable components of Pump-Motor will be replaced by the contractor and are inclusive rate in job. |
| 14 | Removal of lowering & loweing pump Motor, Dismantling, cleaning and overhauling of 25 HP borewell submersible pump set of the following capacities including rewinding of motor with appropriate super enameled copper wire of existing gauge, replacement of bearing - 02 Nos, including all connection and testing complete for following unsv replacement of parts:-(i) Replacement of bush (gland) and clamps of borewell. (ii) Replacement of pump shaft and borewell cover. (iii) Replacement of impeller. (iv) Replacement of shaft sleeve. Note: Except winding material, all unserviceable components of Pump-Motor will be replaced by the contractor and are inclusive rate in job. |
| 15 | Material and labour for copper rewinding of damaged/burnt motor/submersible of capacity 0.25HP to 25 HP any type by using enamelled copper wire of superior quality of existing grade and same Nos. of turns including varnishing ‘F’ class insulation and drying in heat chamber / oven or through insulated winding copper wire including all other material / fittings and testing on completion, complete all as specified & directed. |
| 16 | Taking up or down steel tubing and connections, including cleaning for refixing or removal to store size of 25 mm bore scomplete all as specified and as directed. |
| 17 | Taking up or down steel tubing and connections, including cleaning for refixing or removal to store size of 40 mm bore scomplete all as specified and as directed. |
| 18 | Supplying and laying of CPVC pipes SDR 11 & Plain CPVC SDR 11 fittings in trenches complete all as specified as per site requirement complete of sizes of nominal dia 25/32 mm OD complete all as specified and as directed. |
| 19 | Supplying and laying of CPVC pipes SDR 11 & Plain CPVC SDR 11 fittings in trenches complete all as specified as per site requirement complete of sizes of nominal dia 40 mm OD complete all as specified and as directed. |
| 20 | Supply and fixing in replacement of CPVC Gate /ball valves as per requirement of the site size of 25/32 mm OD complete all as specified and as directed. |
| 21 | Supply and fixing in replacement of CPVC Gate /ball valves as per requirement of the site size of 40 mm OD complete all as specified and as directed. |
| 22 | Supply and fixing in replacement of Stop valves, cast copper alloy, 25mm inner dia, screwed down, high pressure, with crutch or butterfly handle, screwed both ends for iron pipe or for unions and fixed complete all as specified and directed. |
| 23 | Supply and fixing in replacement of Stop valves, cast copper alloy, 50mm inner dia, screwed down, high pressure, with crutch or butterfly handle, screwed both ends for iron pipe or for unions and fixed complete all as specified and directed. Please Enable Macros to View BoQ information |