|
| 1 | WATER COOLERS M&L for taking down defective sealed compressor from the unit and supply and fix factory reconditioned compressor obtained for the exchange of old compressor including cleaning the refrigeration circuit with appropriate cleaning agent flushing through with CO2/N2, brazing the line, pressure testing rectification of leakages, dehydrating, vacumising, charging of R 134A gas, replacement of copper pipe, copper strainer, topping up compressor oil including to and fro transportation of the unit to the workshop testing & commissioning of 40/80 Ltrs capacity water coolers. |
| 2 | M&L for cleaning including cleaning the system, flushing through with CO2/N2 removal of complete dirt, oil brazing the line, pressure testing, rectification of leakages, dehydrating, vacumising, charging of R-12/R-22 gas, replacement of copper pipe, copper strainer, topping up compressor oil, testing & commissioning the water coolers of capacity 40/80 Ltrs.Note: New spare parts shall be measured and paid separately. |
| 3 | S&F in repairs relay assembly suitable for water cooler of any capacity as per existing complete all as specified. |
| 4 | S&F in repairs thermostatic switch suitable for water cooler of any capacity as per existing complete all as specified. |
| 5 | S&F in repairs capacitor suitable for water cooler of any capacity as per existing complete all as specified. |
| 6 | S&F in repairs overload protector suitable for water cooler of any capacity as per existing complete all as specified. |
| 7 | S&F in repairs fan motor with fibre blade suitable for water cooler of any capacity complete all as specified. |
| 8 | S&F in repairs PVC float valve of 15mm bore (including ball) suitable for water cooler of any capacity as per existing complete all as specified. |
| 9 | S&F in repairs PVC float valve of 15mm bore (including ball) suitable for water cooler of any capacity as per existing complete all as specified. |
| 10 | S&F in repairs capillary tube including brazing for water cooler of any capacity complete all as specified. |
| 11 | S&F in repairs wiring kit for water cooler of any capacity complete all as specified. |
| 12 | S&F in repair chromium plated water tray basin for water cooler of any capacity matching to the existing complete all as specified and directed. |
| 13 | M&L for preparation of old painted surfaces of water cooler including repairing the dented surface by applying putty and removing old paint cleaning and applying by spraying two coats of synthetic enamel paint of approved colour, writting the SM /Ser No / unit name and date of repair of machine complete all as specified and directed. |
| 14 | REFRIGIRATORSM&L for taking down defective sealed compressor from the unit and supply and fix factory reconditioned compressor obtained for the exchange of old compressor including cleaning the refrigeration circuit with appropriate cleaning agent flushing through with CO2/N2, brazing the line, pressure testing rectification of leakages, dehydrating, vacumising, charging of R134A gas, replacement of copper pipe, copper strainer, topping up compressor oil including to and fro transportation of the unit to the workshop testing & commissioning of 165 ltrs capacity. |
| 15 | M&L for gas charging including cleaning the refrigeration system, flushing through with CO2/N2 removal of complete dirt, oil brazing the line, pressure testing, rectification of leakages, dehydrating, vacumising, charging of R134A gas, replacement of copper pipe, copper strainer, topping up compressor oil, including to and fro transportation of the unit to the work shop testing & commissioning the refrigerators of capacity 165 to 210 Ltrs. |
| 16 | S&F in repairs relay suitable for Refrigerator / deep freezer of any capacity as per existing model complete all as specified. |
| 17 | S&F in repairs overload protector suitable for refrigerator / deep freezer of any capacity as per existing model complete all as specified. |
| 18 | S&F in repairs thermostatic switch of auto de-frost suitable for refrigerator any type and capacity and any model complete all as specified. |
| 19 | SPLIT TYPE ACs M&L for taking down the AC unit of any capacity by disconnecting all electrical and piping connections and performing following maintenance tasks:-(a) Removal of dust from the outer body with the help of a blower.(b) Cleaning the condenser coils with water and cleaning agent/soap solution and decaling it.(c) Painting the base tray with one coat of black enameled paint.(d) Cleaning of air filter of with vacuum cleaner or washing the filter in lukewarm water with detergent.(e) Cleaning of anti allergy and triple filter and drying the filter in direct sunlight for 2 hrs.(f) Cleaning of plasma filterwith vacuum cleaner or washing the filter in lukewarm water with detergent and drying the filter in shade.(g) Cleaning of micro protection filter with vacuum cleaner only.(h) Cleaning of indoor unit with a soft, dry cotton cloth.(j) Checking all connections including functioning of relays, capacitors, overload protectors, thermostats, industrial socket (Metal clad) and circuit breaker. (k) Refixing all items and making it serviceable.Note: All new parts shall be measured and paid separately. |
| 20 | S&F copper pipe line heavy duty upto 5/8\\" dia with puff insulation and flair nuts from indoor to outdoor split type AC of 1.5/2 TR capacity all as specified and directed. |
| 21 | S&F in repairs of capacitor (conforming to IS:2993-1975) AC 230 Volts in plastic container 45/4.0 mfd all as specified and as directed. |
| 22 | S&F in repairs of capacitor (conforming to IS:2993-1975) AC 230 Volts in plastic container 55/6.0 mfd all as specified and as directed. |
| 23 | S&F in repairs condenser unit complete set suitable for 1.5/2.0 Ton split type AC unit including removing the existing unit complete all as specified. |
| 24 | S&F in repairs fan blade swing motor suitable for 1.5/2.0 Ton split AC all as specified and as directed. |
| 25 | S&F in repairs blower motor for 1.5/2.0 TR all as specified and as directed. |
| 26 | S&F in repairs remote with holder suitable for split type Acs 1.5/2.0 TR complete all as directed and as per manufacturer`s specifications. |
| 27 | S&F in repairs 3 core copper PVC insulated wire of size 70/.0076 complete all as specified and directed. |
| 28 | M&L for disconnecting and taking down burnt compressor of capacity 1.5 TR from split AC unit and supply and install the new compressor 1.5 TR capacity duly filled with gas as per existing model and size and testing also complete all as specified and directed. Note:- (1) Guarantee card with original purchase voucher of the original manufacturer shall be produced before payment. (2) Freon Gas measured and paid separately under the relevant item of sch 'A' all as specified and directed. |
| 29 | Description all as per item No. 80 herein before, but split type AC 2 TR capacity complete all as specified and directed . |
| 30 | S&F bracket suitable for 2/ 1.5 Ton split AC all as specified and as directed |
| 31 | S&F in repairs PCB Board suitable for 1.5/2.00 Ton split AC all as specified and as directed . |
| 32 | S&F in repairs remote sensor board suitable for 1.5 Ton split AC all as specified and as directed |
| 33 | S & F in repairs voltage stabilizer upto 4 KVA, 170-270V, suitable for 1.5 Ton complete all as specified and directed. |
| 34 | S & F in repairs voltage stabilizer 05 KVA, 170-270V, suitable for 2.0 Ton complete all as specified and directed. |
| 35 | Supply and charging of refrigerant gas R-22/ R134A/ R32 in cooling appliances after dehydration all as per standard practice testing for proper cooling effect and satisfactory performance complete all as specified and as directed. |
| 36 | S&F in repairs PCB Board suitable for 1.5/2 Ton split AC all as specified and as directed |
| 37 | Supply and charging of refrigerant gas R-22/ R134A/ R32 in cooling appliances after dehydration all as per standard practice testing for proper cooling effect and satisfactory performance complete all as specified and as directed. Please Enable Macros to View BoQ information |