| 1 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete.(a) Depth of excavation not exceeding 1.5 mRef. Page -1, Item -2 a), PWD SOR Vol-I w. e. f. 1.11.2017 |
| 2 | Supplying and laying Polythene Sheet (150gm / Sq.M) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches. Ref. Page -47, Item -3, PWD SOR Vol-I w. e. f. 1.11.2017 |
| 3 | Cement concrete with graded jhama khoa (30 mm size) excluding shuttering In ground floor and foundation.(a) 1:3:6 proportionRef. Page -23, Item -1), PWD SOR Vol-I w. e. f. 1.12.2017 |
| 4 | Brick work with 1st class bricks in cement mortar (1:6)(a) In foundation and plinthRef. Page -15, Item -8 a), PWD SOR Vol-I w. e. f. 1.12.2017 |
| 5 | Brick work with 1st class bricks in cement mortar (1:6)(b) In Superstructure, Ground floorRef. Page -15, Item -8 b), PWD SOR Vol-I w. e. f. 1.12.2017 |
| 6 | Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete.(a) With earth obtained from excavation of foundationRef. Page - 1, Item 03,a; PWD SOR VOL-I w.e.f. 1.11.2017 |
| 7 | (A) Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity)Ref. Page -2, Item -4,a), PWD SOR Vol-I w. e. f. 1.12.2017 |
| 8 | Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course,scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface]Ref. Page -189, Item -1, ii, PWD SOR Vol-I w. e. f. 1.12.2017 |
| 9 | Neat cement punning about 1.5mm thick in wall, dado, windowsill, floor etc.NOTE:Cement 0.152 cu.m per100 sq.m.Ref. Page -192, Item -15 ), PWD SOR Vol-I w. e. f. 1.12.2017 |
| 10 | Artificial stone in floor, dado, staircase etc with cement concrete (1:2:4) with stone chips, laid in panels as directed with topping made with ordinary or white cement (as necessary) and marble dust in proportion (1:2) including smooth finishing and rounding off corners including raking out joints or roughening of concrete surface and application of cement slurry before flooring works using cement @ 1.75 kg/Sq.M all complete including all materials and labour. In ground floor. 3 mm. thick topping (High polishing grinding on this item is not permitted with ordinary cement). Using grey cement(iii) 35 mm. thickRef. Page -48, Item -6 ii), PWD SOR Vol-I w. e. f. 1.11.2017 |
| 11 | (b) Priming one coat on timber or plastered surface with synthetic oilbound primer of approved quality including smoothening surfaces by sand papering etc.Ref. Page -200, Item -1(b), PWD SOR Vol-I w. e. f. 1.12.2015 |
| 12 | Protective and Decorative Acrylic exterior emulsion paint of approved quality, as per manufacturer's specification and as per direction of Engineer-in-Charge to be applied over acrylic primer as required. The rate includes cost of material, labour, scaffolding and all incidental charges but excluding the cost of primer. In Ground floor (Two Coat)a) Normal Acrylic EmulsionRef. Page - 197, Item 17,a; PWD SOR VOL-I w.e.f. 1.11.2017 |
| 13 | Add 18% GST |
| 14 | Add 1% Cess Please Enable Macros to View BoQ information |