| 1 | Dismantling all types of plain cement concrete works, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m.In ground floor including roof.Ref. Page -10, Item -2, PWD SOR Vol-I w. e. f. 1.11.2017 |
| 2 | Dismantling R.C. floor, roof, beams etc. including cutting rods and removing rubbish as directedwithin a lead of 75 m. including stacking of steel bars.(a) In ground floor including roof.Ref. Page -10, Item -3, PWD SOR Vol-I w. e. f. 1.11.2017 |
| 3 | Supplying and laying Polythene Sheet (150gm / Sq.M) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches. Ref. Page -47, Item -3, PWD SOR Vol-I w. e. f. 1.11.2017 |
| 4 | Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor)(f) 25 mm to 30 mm thick wooden shuttering without stagingRef. Page - 42, Item 36,f; PWD SOR VOL-I w.e.f. 1.11.2017 |
| 5 | Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes.(a) Pakur VarietyRef. Page -15, Item -7a), PWD SOR Vol-I w. e. f. 1.11.2017 |
| 6 | Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes.(a) Pakur VarietyRef. Page -24, Item -4), PWD SOR Vol-I w. e. f. 1.11.2017 |
| 7 | Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction. (a) For works in foundation, basement and upto roof of ground floor/upto 4 mII. JSW/JSPL/ SHYAM/ SRMB/ BMASL/ ELECTROSTEEL/ SSLRef. Page - 44, Item 40,b,i; PWD SOR VOL-I w.e.f. 1.11.2017 |
| 8 | Brick work with 1st class bricks in cement mortar (1:6)Ground Floor(b) In superstructure, ground floorRef.Page -15, Item -8 a), PWD SOR Vol-I w. e. f. 1.11.2017 |
| 9 | Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding / staging where necessary (Ground floor).Ref. Page - 189, Item 1 PWD SOR VOL-I w.e.f. 1.11.2017 |
| 10 | Neat cement punning about 1.5 mm. thick in wall, dado, window, sills, floor, drain etc.NOTE : Cement 0.152 cu.m. per 100 sq.m.Ref. Page -192, Item -15, PWD SOR Vol-I w. e. f. 1.11.2017 |
| 11 | Removal of rubbish,earth etc. from the working site and disposal of the same beyond the compound, in conformity with the Municipal / Corporation Rules for such disposal, loading into truck and cleaning the site in all respect as perdirection of Engineer in chargeVide - Page -12, Item -13 Volume I : Building Works PWD(WB), Schedules of Rates :2017(Rate Based on rate analysis) |
| 12 | Add 18% GST |
| 13 | Add 1% Cess Please Enable Macros to View BoQ information |