|
| 1 | Checking the hydraulic thruster brake assembly of motors |
| 2 | OD1956/2025-2026:Dismantling the hydraulic unit of hydraulic thruster brake for Cleaning the cylinder, Cleaning the drum and brake pad and adjusting the brake etc, filling hydraulic oil and refitting the hydraulic unit and checking the brake as directed by the departmental officer at site. |
| 3 | Proper greasing of hoisting mechanism, Chain and filling gear oil |
| 4 | OD1959/2025-2026:Proper greasing of the hoisting unit, plummer blocks, sprocket gear and all other movable parts for smooth functioning of the shutter and oil changing of gear unit including material charge, labour, conveyance etc complete. |
| 5 | OD1961/2025-2026:Applying grease to the chain including material, labour, etc complete |
| 6 | OD1960/2025-2026:Supplying and refilling Grade SAE140 gear oil for Worm reducer |
| 7 | Greasing the boggie wheel units |
| 8 | OD1955/2025-2026:Greasing the boggie wheel units of the shuter with pneumatic machine including cost of all materials, labour, hire charge of machinery etc complete |
| 9 | Alignment correcting of shutters |
| 10 | OD1958/2025-2026:Checking alignment and correcting the shutter incluiding all lead, lift, labour and hire charge of machinery etc complete as per the direction of the department officer at site |
| 11 | Trail run |
| 12 | OD1957/2025-2026:Conducting trial run of the shutter after correcting the alignment of the chain and other periodical maintenance of the shutter including, labour etc |
| 13 | Checking the rubber seals, lock of chain, rollers, bolt and nut of hoisting mechanism base and covers and supply of bolt and nuts |
| 14 | OD1963/2025-2026:Checking the bolt and nut of the rubber seals (Horizontal and vertical) and tightening the loosened bolt and nut and replacement of damaged SS bolt and nut already supplied as per the Deptl officers at site including cost of conveyance labour charges etc complete |
| 15 | OD1967/2025-2026:Supply of SS Bolt & Nuts |
| 16 | OD1964/2025-2026:Checking the rolling of boggie wheels and contact of roller track by correcting the eccentricity of the wheels and tightening the lock plate and replacement of damaged bolt and nuts of lock plate which are already supplied as per the Deptl officers at site including cost of conveyance labour charges etc complete |
| 17 | OD1966/2025-2026:Checking the bolt and nut, keys of the hoisting mechanism gears, couplings, drive shafts plummer blocks etc all other bolted componets of hoisting mechanism etc complete |
| 18 | OD1965/2025-2026:Cost of MS Bolt& Nuts Please Enable Macros to View BoQ information |