| 1 | A. Temporary arrangements of pipeline |
| 2 | 100.98.211:Supply of PVC Pipe, 6kg/cm2, 63mm Dia. |
| 3 | 100.1.1:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil. |
| 4 | 50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete |
| 5 | 100.9.6:Laying uPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipeline to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipeline with water to the required test pressure (excluding cost of pipes and specials): 63 mm nominal outside diameter pipes. |
| 6 | 50.18.9.20.4:Providing and fixing PVC moulded fittings/ accessories for Rigid PVC pipes, including jointing with PVC solvent cement - 63 mm dia Bend |
| 7 | OD152931/2024-2025:Supplying and fixing bamboo poles across thodu at 1.5m intervals to fix and support thodu crossing PVC pipe including cost and conveyance of all materials and labour charges etc complete as per the direction of depatmental officers. |
| 8 | 100.98.1008:Engaging Coolie. |
| 9 | OD152948/2024-2025:Interconnecting existing 63mm PVC pipe and newly laid 63mm PVC pipe using 63mm PVc bend including cost and conveyance of all materials and labour charges etc. complete |
| 10 | B . Permanent Arrangements |
| 11 | 100.98.211:Supply of PVC Pipe, 6kg/cm2, 63mm Dia. |
| 12 | 100.98.154:Supply of HDPE Pipe PE 100 (IS 4984/1995), 10kg, 90mm Outer Dia. |
| 13 | 100.1.1:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil. |
| 14 | 50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete |
| 15 | 100.9.6:Laying uPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipeline to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipeline with water to the required test pressure (excluding cost of pipes and specials): 63 mm nominal outside diameter pipes. |
| 16 | 100.10.1:Laying HDPE pipes (IS : 4984) on land portion including conveying within initial lead and aligning the pipes, electro-fusion welding using automatic or semi-automatic electrofusion machines, testing the pipeline thus fabricated to suit the hydraulic working pressure and after testing, aligning the pipeline, lowering the pipe in position into the trenches already made, testing the line to suitable pressure with potable water before back filling and levelling the trenches including all labour charge, hire for appliances etc., complete but excluding cost of pipe and fittings: 90mm Nominal Outer Diameter pipes. |
| 17 | OD153116/2024-2025:Interconnecting existing 63mm PVC pipe and newly laid 63mm PVC pipe using 63mm PVC coupling including cost and conveyance of all materials and labour charges for fixing etc. complete. |
| 18 | OD153138/2024-2025:Supplying and fitting 60x60x6mm MS angle to support the pipe at culvert portion without causing any dislocation to the pipes laid including cost and conveyance of all materials and labour charges as per the direction of deptl officers. Please Enable Macros to View BoQ information |