| 1 | Appendix 1 Kalarikandy vayanshala road |
| 2 | 3.5.2:Excavation in Soil with Dozer with lead upto 100 m <br> Excavation for roadway in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 m, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections. |
| 3 | OD505278/2025-2026:Filling with Quarry muck filling up low low laying and water logged areas with local materials / quarry muck spreading in layers , levelling the top at site and consolidation by ramming , etc. comp0lete for improving the CBR value of subgrade. |
| 4 | 75.8.1:Providing Plain cement concrete for road work CC 1:2:4 (1 cement: 2 fine aggregate: 4course aggregate) laid to required slope and camber in panels (@ 3 m c/c) as requiredincluding compaction, finishing and tamping etc .complete. Max. size of courseaggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification(i) Nominal mix (1:2:4) |
| 5 | appendix -2 Nedumkandam ambalam road |
| 6 | OD504998/2025-2026:Filling with Quarry muck filling up low low laying and water logged areas with local materials / quarry muck spreading in layers , levelling the top at site and consolidation by ramming , etc. comp0lete for improving the CBR value of subgrade. |
| 7 | 75.8.1:Providing Plain cement concrete for road work CC 1:2:4 (1 cement: 2 fine aggregate: 4course aggregate) laid to required slope and camber in panels (@ 3 m c/c) as requiredincluding compaction, finishing and tamping etc .complete. Max. size of courseaggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification(i) Nominal mix (1:2:4) |
| 8 | appendix -3 Thandalamparambath edavzhi |
| 9 | OD505000/2025-2026:Filling with Quarry muck filling up low low laying and water logged areas with local materials / quarry muck spreading in layers , levelling the top at site and consolidation by ramming , etc. comp0lete for improving the CBR value of subgrade. |
| 10 | 75.8.1:Providing Plain cement concrete for road work CC 1:2:4 (1 cement: 2 fine aggregate: 4course aggregate) laid to required slope and camber in panels (@ 3 m c/c) as requiredincluding compaction, finishing and tamping etc .complete. Max. size of courseaggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification(i) Nominal mix (1:2:4) |
| 11 | appendix -4 Thandora makuzhiyil edavazhi |
| 12 | OD505003/2025-2026:Filling with Quarry muck filling up low low laying and water logged areas with local materials / quarry muck spreading in layers , levelling the top at site and consolidation by ramming , etc. comp0lete for improving the CBR value of subgrade. |
| 13 | 75.8.1:Providing Plain cement concrete for road work CC 1:2:4 (1 cement: 2 fine aggregate: 4course aggregate) laid to required slope and camber in panels (@ 3 m c/c) as requiredincluding compaction, finishing and tamping etc .complete. Max. size of courseaggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification(i) Nominal mix (1:2:4) |
| 14 | 3.5.1:Excavation in Cutting in Soil by manual means with lead upto 50 m <br> Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3 |
| 15 | OD505170/2025-2026:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with goodquality blasted rubble including packing to compactness to lines and levels cost and conveyanceof all materials labour charges etc. complete as per direction of Departmental officers at site(modified 60.7.1) Please Enable Macros to View BoQ information |