| 1 | Restoration work |
| 2 | 3.6:Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m |
| 3 | 4.1.B.1:Construction of granular sub-base by providing graded material, spreading in uniform layers with a motor grader on a prepared surface, mixing by mix in-place method with rotavator at OMC, and compacting with a vibratory roller to achieve the desired density, complete as per clause 401. Grading-V - For sub-base cum drainage layer - Mix in Place Method |
| 4 | 55.23:Supplying and laying interlocking tile 80mm or nearest size thickness, minimum strength M30 including providing a layer of 6mm aggregate for 5cm thickness, then laying interlock cobbles in lines and levels as per the directions of the departmental officers at site inclusive of all cost & conveyance charges etc. complete. |
| 5 | 12.4:Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. |
| 6 | 12.8.B:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications PCC Grade M20 (Without formwork) |
| 7 | 12.8.1.C.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications <br> RCC Grade M20 - Using Concrete Mixer <br> |
| 8 | OD293509/2025-2026:Chequerred precast cement concrete tiles 22 mm thick in footpath & courtyard, jointed with neat cement slurry mixed with pigment to match the shade of tiles, including rubbing and cleaning etc. complete on 20 mm thick bed of cement mortar 1:4 ( 1 cement : 4 coarse sand).Light shade pigment using white cement |
| 9 | 12.40:Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications |
| 10 | 8.2.A:Construction of cement concrete kerb with channel with top and bottom width 115 and 165 mm respectively, 250 mm high in M 20 Grade PCC Using Concrete Mixer on M10 grade foundation 150 mm thick, kerb channel 300 mm wide, 50 mm thick in PCCM20 grade, sloped towards the kerb, kerb stone with channel laid with kerb laying machine, foundation concrete laid manually, all complete as per clause 409 |
| 11 | OD293842/2025-2026:Providing and fixing stainless steel (Grade 304) railing made of Hollow tubes, channels, plates etc., including welding, grinding, buffing, polishing and making curvature (wherever required) and fitting the same with necessary stainless steel nuts and bolts complete, i/c fixing the railing with necessary accessories & stainless steel dash fasteners, stainless steel bolts etc., of required size on the top of the floor or the side of waist slab with suitable arrangement as per approval of Engineer-in-charge, (for payment purpose only weight of stainless steel members shall be considered excluding fixing accessories such as nuts, bolts, fasteners etc.) |
| 12 | OD293309/2025-2026:Details of cost of 1 grating used for covering the drainage chambers. Materials used : 75x75x6 channel : 4 nos x 0.94 length = 3.76 m @ 6.8 kg/m = 25.568 50x 50 x 6 channel : 4 nos x 0.90 length = 3.6 m @ 4.5kg/m = 16.2 20mm dia TMT bar = 18nos x 0.9m length = 16.2 m @ 2.46kg/m = 39.852kg Total 81.62kg Please Enable Macros to View BoQ information |