| 1 | CARWSS to Kalloorkad, Kumaramangalam & Kadavoor - State plan 2024-25 - Incomer panel works in WTP & Raw water -Electrical work |
| 2 | OD274251/2025-2026:Dismantling the existing 2 x 3.5 x 185 sq.mm cable from MSB & shifting to convenient place as per the direction of departmental officers. |
| 3 | OD274261/2025-2026:Supply and installation of 2 x 3.5 x 400 sq.mm cable-(90 m) as per the direction of departmental officers. |
| 4 | OD274252/2025-2026:Dismantling the 800A ACB , installation of 630A , 4 pole MCCB , 70 KA bushbar modifications with inbuilt earth fault protection. |
| 5 | OD274249/2025-2026:MSB bush bar replacement main bush bar and sub bush bar replacement35X8 to 50X10 ,30X8 to 40X10 |
| 6 | OD274259/2025-2026:Supply and installation of 250 A MCCB/SFU out going feeders with sub bars 40X10 mm aluminium with bushbar support , insulators and FRP shrouds |
| 7 | OD274262/2025-2026:Supply and installation of CAG 14 instantaneous earth fault relay, shunt tripling circuits, shunt release N-CT 3x1.5 mm2 - 36 m UGB armoured copper cable . |
| 8 | OD274243/2025-2026:Supply and installation of RYB indicators protection relays ,metering instrument for voltage and 3 line current measurement including control MCB current transformer etc. |
| 9 | OD274260/2025-2026:Supply and installation of 100 KVAR automatic power factor correction panel including 6 stage APP capacitors fully compartmentailzed with auto and manual options cabling and earthing. |
| 10 | OD274258/2025-2026:Supply and installation of 3X150 sqmm service wire , 1X150 sqmm service cable from transformer to CT meter panel - each 45 m |
| 11 | OD274245/2025-2026:supply and installation of fully compartmentalized CT meter panel ,4 Nos CT for KSEB meter ,out door types with 250 A HRC fuses and 250 A SFU for consume isolation . |
| 12 | OD274248/2025-2026:Supply and installation of main switch board with 250 A MCCB as incomer, 200 A , 4 pole COS and 200 A MCCB ,36 KA ,2 nos in the COS outlet as out going feeders including meter panel to main switch board XLPE cable ,3 1/2X150 Sqmm Aluminium conductor. |
| 13 | OD274247/2025-2026:Supply and installation of 20X3 copper strip earthing (28m),2 run -MSB and meter panel |
| 14 | OD274246/2025-2026:Supply and installation of CI Plate earthing electrode 600x600x6 mm with 40 mm GI watering pipe & 2 run 25x3 copper strip , chemical earthing /charcol 2.5 m depth pith earth continuity enhancement including all civil works connecting to existing earth pit |
| 15 | OD274242/2025-2026:Dismantling the existing cables to 30 HP motor and connecting to new MSB with necessary PVC conduits |
| 16 | OD274253/2025-2026:Dismantling the cables from 50 HP Pump change over panel and connecting to new MSB including cable glands and termination |
| 17 | OD274238/2025-2026:Supply and installation of new Star Delta starter to replace old and frequently damaging Oil type auto trasformer starter, For 12.5 HP 2 nos, For 25 HP-2 nos, for 45 HP-1 no, 60 HP-2 nos |
| 18 | OD274239/2025-2026:Supply of XLPE copper wire for connecting the new starters, 6 sq mm-30 mm, 16 sq mm-30 m, 35 sqmm-30 m Please Enable Macros to View BoQ information |