| 1 | LAYING INTERLOCKING ANDPROVIDING PLANTS |
| 2 | CIVIL WORKS |
| 3 | OD52990/2025-2026Engaging labour for levelling the site and thrown the debris away from the site etccomplete |
| 4 | 2.28.1Surface dressing of the ground including removing vegetation and in-equalities notexceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5m.All kinds of soil |
| 5 | 16.68Providing and laying 60 mm thick factory made cement concrete interlocking paverblock of M - 30 grade made by block making machine with strong vibratorycompaction, of approved size, design & shape, laid in required colour andpattern over and including 50 mm thick compacted bed of coarse sand, filling thejoints with fine sand etc. all complete as per the direction of Engineer-in-charge |
| 6 | 4.4.1Providing and laying cement concrete in kerbs, steps and the like at or near groundlevel excluding the cost of centering, shuttering and finishing.1:1.5:3 (1 cement : 1.5coarse sand (Zone III) : 3 graded stone aggregate 20 mm nominal size) |
| 7 | 50.6.1.7Solid block masonry using pre cast solid blocks ( Factory made) of size 40x20x15cmor nearest available size confirming to IS 2185 part I of 1979 for foundation andplinth with thickness 15 cm in : CM 1:6 ( 1 cement : 6 coarse sand ) etc complete |
| 8 | 16.6.1Supplying, stacking and spreading 6 mm thick red bajri, watering and rollingcomplete including preparation of the surface and rolling.With road roller / hand roller |
| 9 | 30.2.30\Supplying and stacking sludge at site including royalty and carriage upto 5 k.m. leadcomplete (sludge measured in stacks will be reduced by 8% for payment). |
| 10 | 30.2.8Spreading of sludge, dump manure and/or good earth in required thickness as perdirection of officer-in-charge (cost of sludge, dump manure and/ or good earth to bepaid separately). |
| 11 | 30.2.9Mixing earth and sludge or manure in the required proportion specified or directed bythe Officer-in-charge |
| 12 | OD53294/2025-2026Supply and stacking of Bougainvillea (Variety Butiana, Lady MaryBaring,Mahara,Mohan,Scarlet Queen, Varigata, Glabra Formosa, Peruviana Odissi,Partha,Subhra,Thimma, Spectabilis L.N Birla,Refulgens) plant of height 30 cm. to 45cm. with 2-3 branches in 20 cm size of Earthen pots / Plasticpots & as per direction of the officer-incharge |
| 13 | OD53348/2025-2026Supply and stacking of plant golden leather fern(Acrostichum aurum)variegated ofheight 120 cm., multi branched in earthen pots of size 25 cm as per direction of theofficer-in-charge. |
| 14 | OD53365/2025-2026Supply and stacking of plant Tabernaemontana divaricata (Chandni double) of height90-105 cm., bushy in big size HDPE bag as per direction of the officer-in-charge |
| 15 | ROAD TARRING |
| 16 | CIVIL WORKS |
| 17 | 16.1Preparation and consolidation of sub grade with power road roller of 8 to 12 tonnecapacity after excavating earth to an average of 22.5 cm depth, dressing to camberand consolidating with road roller including making good the undulations etc. and rerollingthe sub grade and disposal of surplus earth with lead upto 50 metres. |
| 18 | 16.3.1Supplying and stacking at site.90 mm to 45 mm size stone aggregate |
| 19 | 16.3.2Supplying and stacking at site.63 mm to 45 mm size stone aggregate |
| 20 | 16.3.3Supplying and stacking at site.53 mm to 22.4 mm size stone aggregate |
| 21 | 16.3.9Supplying and stacking at site.Good earth |
| 22 | 16.4Laying, spreading and compacting stone aggregate of specified sizes to WBMspecifications in uniform thickness, hand picking, rolling with 3 wheeled road/vibratory roller 8-10 tonne capacity in stages to proper grade and camber, applyingand brooming requisite type of screening / binding material to fill up interstices ofcoarse aggregate, watering and compacting to the required density. |
| 23 | 16.5.1Laying water bound macadam sub- base with brick aggregate and blinding material,earth etc. including screening, sorting and spreading to template and consolidation with light power road-roller etc. complete. (payment for brick aggregate and moorumetc. to be made separately).Over burnt (Jhama) brick aggregate 120 mm to 40 mm |
| 24 | 16.3.7Supplying and stacking at site.Stone screening 11.2 mm nominal size (Type B) |
| 25 | OD53549/2025-2026Supplying and stacking 6mm blue granite metal for tarring works |
| 26 | 16.33.32.5 cm premix carpet surfacing with 2.25 cum and 1.12 cum of stone chippings of13.2 mm and 11.2 mm size respectively per 100 sqm and 52 kg and 56 kg of hotbitumen per cum of stone chippings of 13.2 mm and 11.2 mm size respectively,including a tack coat with hot straight run bitumen, including consolidation with roadroller of 6 to 9 tonne capacity etc. complete ( tack coat to be paid for separately):WithRefinery Modified Bitumen CRMB 55 conforming to IRC:SP:53 - 1999 |
| 27 | OD53601/2025-2026Providing and laying seal coat over prepared surface of road with bitumen heated inbitumen boilerfitted with the spray set spraying using 98 kg of bitumen of grade VG -10 and blinding surface with 0.90 cum of stone aggregate of 6.7 mm size (Passing11.2 mm sieve and retained on 2.36 mm sieve)per 100 sqm of road surface, includingrolling and finishing with power road roller all complete. |
| 28 | 2.28.1Surface dressing of the ground including removing vegetation and in-equalities notexceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5m.All kinds of soil |
| 29 | CONSTRUCTION OF COMPOUNDWALL AND PROVIDING GATE |
| 30 | CIVIL WORKS |
| 31 | 15.4Demolishing R.B. work manually / by mechanical means including stacking of steelbars and disposal of unserviceable material within 50 metres lead as per direction ofEngineer-in-Charge. |
| 32 | 15.7.4Demolishing brick work manually / by mechanical means including stacking ofserviceable material and disposal of unserviceable material within 50 metres lead asper direction of Engineer-in-Charge.In cement mortar |
| 33 | 2.31Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees andsaplings of girth up to 30 cm measured at a height of 1 m above ground level andremoval of rubbish up to a distance of 50 m outside the periphery of the area cleared |
| 34 | 2.6.1Earth work in excavation by mechanical means (Hydraulic excavator)/manual meansover areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan)including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposedearth to be levelled and neatly dressed.All kinds of soil |
| 35 | 7.1.1Random rubble masonry with hard stone in foundation and plinth including levellingup with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarsesand) |
| 36 | 50.6.1.8Solid block masonry using pre cast solid blocks (Factory made) of size 40x20x15cm or nearest available size confirming to IS 2185 part I of 1979 for super structure up tofloor two level with thickness 15cm in: CM 1:6 ( 1 cement : 6 coarse sand etccomplete |
| 37 | 5.9.6Centering and shuttering including strutting, etc. and removal of form for:Columns,Pillars, Piers, Abutments, Posts and Struts |
| 38 | 4.1.8Providing and laying in position cement concrete of specified grade excluding thecost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4coarse sand : 8 graded stone aggregate 40 nominal size) |
| 39 | 5.2.2Reinforced cement concrete work in walls (any thickness), including attachedpilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers,abutments, posts and struts etc. up tot floor five level excluding cost of centering,shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 gradedstone aggregate 20 mm nominal size) |
| 40 | 5.22.6Steel reinforcement for R.C.C work including straightening, cutting, bending, placingin position and binding all complete upto plinth levelThermo - Mechanically Treatedbars of grade Fe-500D or more |
| 41 | 13.7.212 mm cement plaster finished with a floating coat of neat cement of mix:1:4 ( 1cement : 4 fine sand) |
| 42 | 13.46.1Finishing walls with Acrylic Smooth exterior paint of required shade:New work (Twoor more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exteriorprimer applied @ 2.20 kg/10 sqm) |
| 43 | 10.1Structural steel work in single section, fixed with or without connecting plate,including cutting, hoisting, fixing in position and applying a priming coat of approvedsteel primer all complete. |
| 44 | 13.62.1 Painting with synthetic enamel paint of approved brand and manufacture of requiredcolour to give an even shade:Two or more coats on new work over an under coat ofsuitable shade with ordinary paint of approved brand and manufacture . Please Enable Macros to View BoQ information |