Cleaning of main drain, connecting drain (All type drain) taking out slush waste material etc., including disposal / muck through tolly or own arrangement to a specified place outside of Mine premises with all tools & tackles etc., all complete as per Instruction of Engineer-In-Charge.(Two times)
3
Clearing vegetation, grass, all type plants/trees upto height of 1.5m above ground level and removal of rubbish upto a distance of 50m outside the perophery of the area cleared.
4
Total impact of GST for the purpose of CTC Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.