| 1 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete.(a) Depth of excavation not exceeding 1,500 mm.Ref. Page -1, Item -2 a), PWD SOR Vol-I w. e. f. 1.11.2017, Schedule of Rates : 2017) |
| 2 | (b) Depth of excavation for additional depth beyond 1,500 mm. and upto 3,000 mm. but not requiring shoring.Ref. Page -1, Item -2 b), PWD SOR Vol-I w. e. f. 1.11.2017 |
| 3 | Constructing Inspection pit of inside measurement 600mm X 600mm X upto 600mm (depth) with 250 mm thick 1st. class brick work in cement mortar (1:4) on all sides, bottom of the pit consisting of 100 mm thick cement concrete (1:3:6) with stone chips over a layer of jhama brick flat soling, 15 mm thick (1:4) cement plaster to inside walls and out-side walls upto G.L. and 20 mm.thick (1:4) plaster to bottom of the pit, providing necessary invert with cement concrete (1:3:6) with stone chips as per direction, neat cement finishing to entire internal surfaces, top of the pit covered with 100 mm thick R.C.C. slab (1:1.5:3) with stone chips and necessary reinforcements upto 1% and shuttering including 6 mm thick cement plaster (1:4) in all external surfaces of the slab and one 560 mm dia. R.C.C. manhole cover of approved make supplied, fitted and fixed in the slab with necessary fittings, necessary earthwork in excavation in all sorts of soil, filling sides of the pit with earth and removing spoils after work complete in all respect with all costs of labour and materials.2nd CORRIGENDA & ADDENDA, Dated: 04.06.2018, Page 1 of 14, PWD(WB), S.O.R. Volume - II : Sanitary & Plumbing Works w.e.f. 01/11/2017, Item No. - 1, Page No.- 87 |
| 4 | iii) Extra for each additional depth of 150 mm or part thereof beyond initial 600 mm depth. |
| 5 | Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work)Ref. Page -1, Item -3), PWD SOR Vol-II w. e. f. 1.11.2017, Schedule of Rates : 2017) |
| 6 | Supplying, fitting and fixing with cement jointing (3:1) salt glazed stoneware pipe including excavation of earth upto 1.50 metre depth in all sorts of soil both mixed or unmixed and refilling (but excluding concreting at bottom and sides).(ii) 225 mmRef. Page -67, Item -16, II) PWD SOR Vol-II With effect from 01.11.2017 (Sanitary & Plumbing) |
| 7 | Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. Ref. Page 14, Item -1, PWD SOR Vol-I w. e. f. 1.11.2017 and P-1 of 96, Item -1, 3rd CORRIGENDA & ADDENDA wef 04.06.2018 |
| 8 | Cement concrete with graded stone ballast (40 mm size excluding shuttering) In ground floor (A) [Pakur Variety](a) 1:3:6 proportionRef. Page -34, Item -22a), PWD SOR Vol-I w. e. f. 1.11.2017 and P-17 of 96, Item -45, 3rd CORRIGENDA & ADDENDA wef 04.06.2018 |
| 9 | Supplying, fitting and fixing in position reinforced cement polymer concrete manhole /gully pit cover with matching frame.As per I.S-12592(M.D)(iv) 15 MT load bearing capacity round manhole cover provided with two lifter hooks fitted with matching frame of sizeCover: 460 mm X 75 mmFrame: 620 mm X 150 mmopening: 360mmWeight: 100 kg (approx)100 mm dia.Ref. Page -91, Item -8, IV) PWD SOR Vol-II With effect from 01.11.2017 (Sanitary & Plumbing) |
| 10 | Add 18% GST |
| 11 | Add 1% Cess Please Enable Macros to View BoQ information |