| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres All kinds of soil |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level in 1:3:6 (1cement: 3 coarse sand: 6 graded stone aggregate 20mm nominal size using plums (size not over 160mm split nallah stone or quarry stone @ 30% of grass volume) crushed |
| 4 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) |
| 5 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in Cement mortar 1:6 ( 1 cement : 6 coarse sand) |
| 6 | Providing and laying damp-proof Course 50 mm thick with cement concrete 1:2:4 (1 cement:2 coarse sand: 4 graded stone aggregate 20 mm nominal size) and curing complete |
| 7 | Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) |
| 8 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level & above plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more. |
| 9 | Centring and Shuttering including strutting, propping etc and removal of form work for Foundations, footings, bases of columns etc. for mass concrete |
| 10 | Centring and Shuttering including strutting, propping etc and removal of form work for Columns, Pillars, Piers, Abutments, Posts and Struts |
| 11 | Centring and Shuttering including strutting, propping etc and removal of form work for Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. |
| 12 | 12 mm Cement plaster of mix:1 : 6 ( 1 cement : 6 fine sand) |
| 13 | 15mm Cement plaster on the rough side of single or half brick wall of mix:1 : 6 (1 cement : 6 fine sand) |
| 14 | Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works. |
| 15 | Painting with ready mixed synthetic enamel paint ofapproved brand and manufacture in all shades to give an even shade New steel work (two or more coats) |
| 16 | Finishing walls with water proofing cement paint of required shade New work (two or more coats) applied @3.84 kg/10sqm |
| 17 | Carriage of materials by mechanical transport including loading / unloading and stacking complete. Sand lead up to 100 kms avg. |
| 18 | Carriage of materials by mechanical transport including loading / unloading and stacking complete. Stone aggregate lead up to 30 kms avg. |
| 19 | Carriage of materials by mechanical transport including loading / unloading and stacking complete. Bricks lead up to 110 kms avg. |
| 20 | Carriage of materials by mechanical transport including loading/ unloading and stacking complete. Stone lead up to 30 kms avg. Please Enable Macros to View BoQ information |