|
| 1 | Repair of 200 HP non-clog centrifugal pump set at Chakrateerth Sewage Pumping Station i/c following work. |
| 2 | Dismantling of 200 HP non clog centrifugal pump set complete repair & machining of pump shaft making bearing seat with fitting of pump after repair labour charges i/c providing fixing of following accessories. |
| 3 | Transportation loading, unloading, site to workshop & workshop to site. |
| 4 | Making of Impeller nut as per sample. |
| 5 | Providing & fixing tepper roller bearing size No. 32320 |
| 6 | Providing & fixing of roller bearing N.J. No. 222 |
| 7 | Providing & fixing Gland plate with fasteners. |
| 8 | Complete repair of 200 HP Siemens make motor 1440 RPM, 50 Cycle, 440 volt, 3 Phase induction motor including following work at Chakratirth sewage pumping station. |
| 9 | Complete opening fitting of motor with transportation loading and unloading. |
| 10 | Providing of H-class insulation copper winding wire app. 40 kg. each. |
| 11 | Providing of insulating material F-class insulating paper, fiber glass taproot, lead wire, impair cloth, soldering material etc as per required. |
| 12 | Labour charges for fully rewinding of motor as per above material. |
| 13 | Cleaning of stator winding removing moisture and varnishing of stator winding by Dr. back varnishing and drawing. |
| 14 | Providing and fixing of 6315 ball bearing Including required machining work. |
| 15 | Providing and fixing of NU316 Bearing Including required machining work. |
| 16 | Diametrically balancing rotor assembly |
| 17 | Providing and fixing, soldering and lugs crimping of lead wire. |
| 18 | Providing and fixing of couple pulley set as per 225/250 mm size.. |
| 19 | Providing and fixing of terminal plate. |
| 20 | Modification of terminal box for above motor Including providing of aluminium terminal box and fitting with suitable arrangement. Please Enable Macros to View BoQ information |