|
| 1 | PART-I :- SABULIA RAILWAY GATE - DP Mounted 11/0.4 KV 25KVA S/S with Boundry - Pole WPB GI160x160 11 Mtr |
| 2 | Pressure Channel 100x50x6mm, 2.8 Mtr 2 Nos with Galvanisation charges |
| 3 | DP Bracing Channel (100x50x6)mm (9.2 Kg/Mtr) Rs.10.00 added for Galvanistaion |
| 4 | AB Switch & HG Fuse mounting channel 75x40x6mm 2.8 Mts Long 4 Nos (6.8Kg/Mtr) with Galvanisation charges |
| 5 | Cantilever channel for supporting HG fuse 75X40X6mm MS Angle 1 mtr. Long 2 Nos. (6.8Kg/mtr) with Galvanisation charges |
| 6 | Cantilever channel for supporting HG fuse 50X50X6mm MS Angle 1 mtr. Long 2 Nos. (4.5Kg/mtr) with Galvanisation charges |
| 7 | Angle for cantilever arrengement for AB Switch & HG Fuse 50x50x6mm 2 Mts Long each, 2 Nos (4.5Kg/Mtr) with Galvanisation charges |
| 8 | DP Bracing Channel (50x50x6)mm 7Mtrs.(4.5 Kg/Mtr) Rs.10.00 added for Galvanistaion |
| 9 | Angle for mounting of LT distribution box 50X50X6mm 3mtr long each (4.5Kg/Mtr) with Galvanisation charges |
| 10 | Disc Insulator(T&C) 45 KN Polymer |
| 11 | H.W fitting(T&C) 45KN |
| 12 | 11KV AB Switch 3 Pole, 200A |
| 13 | 11KV HG Fuse 3 Pole, 200A |
| 14 | 11KV Lighting arrester 9kva,10KA |
| 15 | LT Distribution Box with MCCB, Alluminium Busbar for single Bay with Kit kat fuse for 25KVA S/S |
| 16 | H.T Stay set (Complete) REC Contructed standard |
| 17 | HT Stay Insulator Type-C |
| 18 | HT Stay Clamp (1.9 Kg/Pair) |
| 19 | 7/10 G.I Stay wire |
| 20 | 55mm2AAA for Jumpering |
| 21 | PG Clamp for 55mm2AAA |
| 22 | Fish plate 50X8 mm, 0.28mtr long (0.97Kg/Mtr.) |
| 23 | G.I Pipe Earthing 40mm Dia medium gauge 03mtr long for Earthing device |
| 24 | Earthing Of Support Coil Type |
| 25 | G.I Flat(25x6mm) for Neutral & body Eathing of DTR |
| 26 | GI Nut, Bolt & washer |
| 27 | LT 3.5 Core, 50 sqmm PVC Cable (Unarmored) |
| 28 | Anticlimbing Device (G.I Barbed Wire 3 Kg per support) |
| 29 | Back Clamp for anticlimbing device 25x3mm.flat, 0.59Kg/Mtr, Flat of 0.510mtr length 4 Nos= (8x0.59x0.510) |
| 30 | Danger Board |
| 31 | Back Clamp for danger plate 25x3mm.flat, 0.59Kg/Mtr, Flat of 0.510mtr length 2 Nos= (2x0.59x0.510) |
| 32 | Sundries |
| 33 | Material for masonary ork for earth pit, Charcoal, Salt etc |
| 34 | Concreting of support CC 1:1.5:3,0.45 CUM@6400/- (L) |
| 35 | Couping with CC 1:1.5:3,0.1125 CUM @6400 (M) |
| 36 | Cement concreting for stay anchor plate with CC 1:2:4,0.2 [email protected] (N) |
| 37 | Construction of brick wall boundary wall with civil &MS metal & sand spreading and metal spreading to the new DSS (P) |
| 38 | Survey & Digitization of new DSS & its internals including its attributes (Q) |
| 39 | Survey & Digitization of MCCB/LTDB & its internals including its attributes (Q) |
| 40 | Plinth Mounted 11/0.4 KV 100KVA S/S with Boundry - Pole WPB GI160x160 11 Mtr |
| 41 | Pressure Channel 100x50x6mm, 2.8 Mtr 2 Nos with Galvanisation charges |
| 42 | DP Bracing Channel (100x50x6)mm (9.2 Kg/Mtr) Rs.10.00 added for Galvanistaion |
| 43 | AB Switch & HG Fuse mounting channel 75x40x6mm 2.8 Mts Long 4 Nos (6.8Kg/Mtr) with Galvanisation charges |
| 44 | Cantilever channel for supporting HG fuse 75X40X6mm MS Angle 1 mtr. Long 2 Nos. (6.8Kg/mtr) with Galvanisation charges |
| 45 | Cantilever channel for supporting HG fuse 50X50X6mm MS Angle 1 mtr. Long 2 Nos. (4.5Kg/mtr) with Galvanisation charges |
| 46 | Angle for cantilever arrengement for AB Switch & HG Fuse 50x50x6mm 2 Mts Long each, 2 Nos (4.5Kg/Mtr) with Galvanisation charges |
| 47 | DP Bracing Channel (50x50x6)mm 7Mtrs.(4.5 Kg/Mtr) Rs.10.00 added for Galvanistaion |
| 48 | Angle for mounting of LT distribution box 50X50X6mm 3mtr long each (4.5Kg/Mtr) with Galvanisation charges |
| 49 | Disc Insulator(T&C) 45 KN Polymer |
| 50 | H.W fitting(T&C) 45KN |
| 51 | 11KV AB Switch 3 Pole, 200A |
| 52 | 11KV HG Fuse 3 Pole, 200A |
| 53 | 11KV Lighting arrester 9kva,10KA |
| 54 | LT Distribution Box with MCCB, Alluminium Busbar for single Bay with Kit kat fuse for 100KVA S/S |
| 55 | H.T Stay set (Complete) REC Contructed standard |
| 56 | HT Stay Insulator Type-C |
| 57 | HT Stay Clamp (1.9 Kg/Pair) |
| 58 | 7/10 G.I Stay wire |
| 59 | 55mm2AAA for Jumpering |
| 60 | PG Clamp for 55mm2AAA |
| 61 | Fish plate 50X8 mm, 0.28mtr long (0.97Kg/Mtr.) |
| 62 | G.I Pipe Earthing 40mm Dia medium gauge 03mtr long for Earthing device |
| 63 | Earthing Of Support Coil Type |
| 64 | G.I Flat(25x6mm) for Neutral & body Eathing of DTR |
| 65 | GI Nut, Bolt & washer |
| 66 | LT 3.5 Core, 50 sqmm PVC Cable (Unarmored) |
| 67 | Anticlimbing Device (G.I Barbed Wire 3 Kg per support) |
| 68 | Back Clamp for anticlimbing device 25x3mm.flat, 0.59Kg/Mtr, Flat of 0.510mtr length 4 Nos= (8x0.59x0.510) |
| 69 | Danger Board |
| 70 | Back Clamp for danger plate 25x3mm.flat, 0.59Kg/Mtr, Flat of 0.510mtr length 2 Nos= (2x0.59x0.510) |
| 71 | Sundries |
| 72 | Material for masonary ork for earth pit, Charcoal, Salt etc |
| 73 | Concreting of support CC 1:1.5:3,0.45 CUM@6400/- (L) |
| 74 | Couping with CC 1:1.5:3,0.1125 CUM @6400 (M) |
| 75 | Cement concreting for stay anchor plate with CC 1:2:4,0.2 [email protected] (N) |
| 76 | Construction of Plinth for new Plinth mounted DSS(O) |
| 77 | Construction of brick wall boundary wall with civil &MS metal & sand spreading and metal spreading to the new DSS (P) |
| 78 | Survey & Digitization of new DSS & its internals including its attributes (Q) |
| 79 | Survey & Digitization of MCCB/LTDB & its internals including its attributes (Q) |
| 80 | 11KV Electrical Infra shifting - WPB 160x152 (34.6 KG/Mtr) 13Mtr-with base plate 300x300x12 |
| 81 | 11Kv V Cross arm (10.2Kg/each) |
| 82 | G.I Back Clamp for V cross arm (0.85Kg each) |
| 83 | 11KV F Clamp 2.9 Kg |
| 84 | Top Bracket 100x50mm MS Channel (0.2Kg Each) |
| 85 | Disc Insulator (T&C) 45KN |
| 86 | H.W fitting(T&C) 45KN |
| 87 | 11KV Pin Inulator Polymer |
| 88 | 100mm2 AAAC |
| 89 | PG Clamp for 100mm2AAAC |
| 90 | 11KV Lighting arrester (for 11KV XLPE Cable) |
| 91 | (75x40x6)MM MS Channel with Galavanistaion 1.2 Mtr long, 02Nos (@6.8Kg/Mtr) for road support of Las |
| 92 | Heat shrinkable Joiniting Kit for 3Cx35MM2 11KV XLPE Cable (Out door type) |
| 93 | 3Cx35MM2 11KV XLPE Cable (Armoured) A2XFY |
| 94 | 7/10 G.I Stay wire for support of XLPE Cable |
| 95 | 11KV XLPE Cable clamp to hold support wire |
| 96 | Pole clamp for Eye hook for XLPE Cable |
| 97 | Eye hook for XLPE Cable |
| 98 | Suspension clamp with eye hook for XLPE Cable |
| 99 | Conductor dead end Clamp suitable for bare massenger XLPE areial bunched cable (25-70mm) |
| 100 | (25x4) mm GI Flat for earthing of XLPE Cable |
| 101 | GI pipe earthing 40 mm dia medium gauge (3.25mm thick ness) 3 mtr long for XLPE Cable & Las |
| 102 | Earthing Of Support Coil Type |
| 103 | H.T Stay set (Complete) |
| 104 | HT Stay Insulator Type-C |
| 105 | HT Stay Clamp (1.9 Kg/Pair) |
| 106 | 7/10 G.I Stay wire |
| 107 | GI Nut, Bolt & washer |
| 108 | 100X50X6mm,MS Channel for straight cross arm (1.2mx10pcs) (9.2Kg/Mtr) + + (0.2mx0 pcs) (9.2Kg/Mtr) for tapping & cut point pole+ Galvanisation charges |
| 109 | 100X50X6mm,MS Channel for straight cross arm (1.8mx4pcs) for Guarding |
| 110 | No-6 G.I Wire (Dia 4.8mm) |
| 111 | EYE Hook for Guarding |
| 112 | GI pipe earthing 40 mm dia medium gauge 3 mtr long at both end of guarding |
| 113 | Anticlimbing Device (G.I Barbed Wire 3 Kg per support) |
| 114 | Back Clamp for danger plate 25x3mm.flat, 0.59Kg/Mtr, Flat of 0.510mtr length 4 Nos= (8x0.59x0.510) |
| 115 | Danger Board |
| 116 | Back Clamp for danger plate 25x3mm.flat, 0.59Kg/Mtr, Flat of 0.510mtr length 2 Nos= (2x0.59x0.510) |
| 117 | Sundries |
| 118 | Material for masonary ork for earth pit, Charcoal, Salt etc |
| 119 | Concreting of support CC 1:1.5:3,0.55 CUM@6400/- for 13Mtrs WPB Pole |
| 120 | Couping with CC 1:1.5:3,0.1125 CUM @6400 (M) |
| 121 | Cement concreting for stay anchor plate with CC 1:2:4,0.2 [email protected] (N) |
| 122 | Road Crossing of 11KV Underground cable 3Cx35 MMSQ 11kv XLPE Cable (armoured) A2XFY |
| 123 | Heat shrinkable Jointing Kit for 3CX35 MM2 11 KV XLPE cable (out door type) |
| 124 | Clamp for HDPE Pipe (cable raising) |
| 125 | Supply & Laying of PIPE HDPE 160 MM DIA PN4, PE 80 through HDD method. Scope of work also includes making Trenchless ducts with 160 mm Dia HDPE pipe casing using HDD machine including supply of HDPE pipe as per IS 4984, (Providing parabolic graph included in the scope) |
| 126 | Supply and installation of cable route marker including transportation from site/tent, excavation, refilling, disposing of malba, flooding with water, ramming/compacting of foundation as per standard specification and drawing. |
| 127 | Erection of 11KV DP with 2 Nos 13 Mtrs WPB Pole for cable raising=02 Nos - WPB 160x152 (34.6 KG/Mtr) 13Mtr-with base plate 300x300x12 |
| 128 | Earthing Of Support Coil Type |
| 129 | 100x50x6mm GI Channel (9.2Kg/Mtr) (2 Nos) |
| 130 | 75x40x6mm GI Channel DP belting (6.8Kg/Mtr) |
| 131 | 50x50x6mm GI Angle Cross Bracing (4.45Kg/Mtr) |
| 132 | GI pipe earthing 40 mm dia medium gauge 3 mtr long |
| 133 | Lighting arrester(12KV,10KA) Station Class |
| 134 | 25x6 mm G.I Flat |
| 135 | H.T Stay set (Complete) |
| 136 | HT Stay Insulator Type-C |
| 137 | HT Stay Clamp (1.9 Kg/Pair) |
| 138 | 7/10 G.I Stay wire |
| 139 | GI Nut, Bolt & washer |
| 140 | Anticlimbing Device (G.I Barbed Wire 3 Kg per support) |
| 141 | Back Clamp for danger plate 25x3mm.flat, 0.59Kg/Mtr, Flat of 0.510mtr length 4 Nos= (8x0.59x0.510) |
| 142 | Danger Board |
| 143 | Back Clamp for danger plate 25x3mm.flat, 0.59Kg/Mtr, Flat of 0.510mtr length 2 Nos= (2x0.59x0.510) |
| 144 | 11KV H.W fitting(B&S) 70KN, 3bolt |
| 145 | 11KV Disc Inulator Polymer(B&S) 70KN Polymer |
| 146 | CONDUCTOR 100SQmm2 AAAC |
| 147 | PG Clamp for 100mm2AAAC |
| 148 | No-8 G.I Wire (Dia 4.8mm) 0.131Kg/mtr. |
| 149 | Pin Inulator 11KV 5KN |
| 150 | Black paint |
| 151 | Yellow ColourPaint for Back ground |
| 152 | Sundries for survey tree cutting, small size nut bolt, Allm. Binding wire/ tape & danger board etc. |
| 153 | Material for masonary ork for earth pit, Charcoal, Salt etc |
| 154 | Concreting of support CC 1:1.5:3,0.45 CUM@6400/- |
| 155 | Couping with CC 1:1.5:3,0.1125 CUM @6400 |
| 156 | Cement concreting for stay anchor plate with CC 1:2:4,0.2 [email protected] (N) |
| 157 | Shifting of LT Lines with 4x95+1x95+1x16mm2 XLPE AB Cable=0.39Km,3x50+1x35mm2 XLPE AB cable=0.33KM - WPB 160x152 (34.6 KG/Mtr) 9Mtr-with base plate 300x300x12 |
| 158 | XLPE AB Cable (4x95+1x95+1x16) mm2 |
| 159 | XLPE AB Cable (1x50+1x35)mm2 |
| 160 | Suspension clamp with eye hook |
| 161 | Eye hook for (XLPE Cable Areial bunched Cable) |
| 162 | Pole clamp for EYE Hook for (XLPE Cable Areial bunched Cable) |
| 163 | Conductor dead end Clamp suitable for bare messenger XLPE Cable Areial bunched Cable (25-70 sq.mm) |
| 164 | LT Stay set (Complete) |
| 165 | Stay Insulator |
| 166 | Stay Clamp |
| 167 | 7/10 G.I Stay wire |
| 168 | Piercing Connector |
| 169 | Neutral Connector |
| 170 | GI Nut, Bolt & washer |
| 171 | Earthing Of Support Coil Type |
| 172 | Anticlimbing Device (G.I Barbed Wire 3 Kg per support) |
| 173 | Back Clamp for anticlimbing device 25x3mm.flat, 0.59Kg/Mtr, Flat of 0.510mtr length 4 Nos= (8x0.59x0.510) |
| 174 | Danger Board |
| 175 | Back Clamp for danger plate 25x3mm.flat, 0.59Kg/Mtr, Flat of 0.510mtr length 2 Nos= (2x0.59x0.510) |
| 176 | Sundries |
| 177 | Cement concreting for stay anchor plate with CC 1:2:4,0.2 [email protected] (N) |
| 178 | Couping with CC 1:1.5:3,0.1125 CUM @6400 |
| 179 | Concreting of support CC 1:1.5:3,0.375 CUM@6400/- |
| 180 | Dismantling Charges for Old Materials - Dismantling Charges for HT Pole |
| 181 | Dismantling Charges for LT Pole |
| 182 | Dismantling Charges for LT Cable |
| 183 | Dismantling Charges for AAAC |
| 184 | Dismantling Charges for 25KVA DTR |
| 185 | Dismantling Charges for 100KVA DTR |
| 186 | PART-II :- NH-16 TO SABULIA RAILWAY GATE - 11KV Electrical Infra Shifting (M+6) M+6 Tower |
| 187 | WPB 160x152 (34.6 KG/Mtr) 13Mtr-with base plate 300x300x12 |
| 188 | Pole WPB GI160x160 11 Mtr |
| 189 | 11KV Pin Inulator Polymer for M+6 Tower |
| 190 | GI Nut, Bolt & washer of different sizes for M+6 Tower |
| 191 | Supply of Anticlimbing Device for M+6 Tower |
| 192 | Back Clamp for Barbed wire anticlimbing Devicee 25x3mm.flat length of 0.510mtr for M+6 Tower |
| 193 | Danger Plate, 1 No for M+6 Tower |
| 194 | Back Clamp for danger plate 25x3mm.flat length of 0.510mtr 1 no for M+6 Tower |
| 195 | GI earth plate for earthing 25x6mm for M+6 Tower |
| 196 | Supply of Phase plate for M+6 Tower |
| 197 | Supply of G.I Pipe Earthing 40mm Dia for M+6 Tower |
| 198 | 100X50X6mm,GI Channel for Guarding arrengements for M+6 Tower |
| 199 | Eye hook for M+6 Tower |
| 200 | No-10 GI Wire cross lacing(0.8Kg/mtr) for M+6 Tower |
| 201 | No-8 GI Wire (Dia 4.6) 0.131Kg/mtr 2mtr each pole connecting pole with Coil earthing |
| 202 | Top Bracket 100x50mm MS Channel (0.2 Kg each) |
| 203 | Disc insulator(T&C) 45 KN Polymer |
| 204 | H.W fitting(T&C) 45KN |
| 205 | 11KV Pin Insulator polymer |
| 206 | 100MM2 AAAC |
| 207 | 11KV XLPE COVERED CONDUCTOR 100 SQMM, AAA |
| 208 | Tension Assembly Wedge Type with anchoring Clamp for 11KV Covered Conductor |
| 209 | IPC for covered Conductor 11 KV 100 Sqmm |
| 210 | Non metalic ties for 11KV Covered Conductor |
| 211 | Mechanical conductor with Heat shrink sleeve for 11 KV 100 Sqmm AAA Covered Conductor |
| 212 | PG Clamp for 100 Mm2 AAAC |
| 213 | MID SPAN JT FOR 100 SQMM INSL.AAAC-11KV |
| 214 | JT KIT END TERM for 11KV 100sqmm covered Conductor |
| 215 | TIE insulated helical f/11kv insl.. Cond. |
| 216 | Earthing Coil |
| 217 | H.T Stay set (Complete) |
| 218 | Stay Insulator |
| 219 | Stay Clamp or stud Clamp |
| 220 | 7/10 G.I Stay wire |
| 221 | GI Nut, Bolt & washer |
| 222 | 100X50X6mm,MS Channel for straight cross arm (1.2mx10pcs) (9.2Kg/Mtr) + + (0.2mx0 pcs) (9.2Kg/Mtr) for tapping & cut point pole+ Galvanisation charges |
| 223 | Anticlimbing Device (G.I Barbed Wire 3 Kg per support) |
| 224 | Back Clamp for danger plate 25x3mm.flat, 0.59Kg/Mtr, Flat of 0.510mtr length 4 Nos= (8x0.59x0.510) |
| 225 | Danger Board |
| 226 | Back Clamp for danger plate 25x3mm.flat, 0.59Kg/Mtr, Flat of 0.510mtr length 2 Nos= (2x0.59x0.510) |
| 227 | Sundries |
| 228 | Concreting of support CC 1:1.5:3,0.0.375 CUM@6400/- for 11 Mtrs WPB Pole (L) |
| 229 | Concreting of support CC 1:1.5:3,0.55 CUM@6400/-for 13 Mtrs WPB Pole (M) |
| 230 | Couping with CC 1:1.5:3,0.1125 CUM @6400.00 (N) |
| 231 | Earth work in excavation in all kinds of soil by mechanical means (Hydraulic excavator) / manual means including removing vegetation, dressing of sides and ramming of bottoms including dewatering (both forsub-soil water & rain water) wherever required by means of suiatable capacity of pump & pipe lines during excavation, concreting & also keeping the earth dry till the construction is overincluding backfilling with available earth etc. complete and disposal of surplus excavated Earth to the designated place by Local statutory Body as per direction of Engineer-in-charge and lift upto 1.5m, disposed earth to belevelled and neatly dressed. Disposal lead up to 100 meter. (O) |
| 232 | Earth work in excavation in all kinds of soil by mechanical means (Hydraulic excavator) / manual means including removing vegetation, dressing of sides and ramming of bottoms including dewatering (both forsub-soil water & rain water) wherever required by means of suiatable capacity of pump & pipe lines during excavation, concreting & also keeping the earth dry till the construction is overincluding backfilling with available earth etc. complete and disposal of surplus excavated Earth to the designated place by Local statutory Body as per direction of Engineer-in-charge and lift from 1.5m to 3.0M, disposed earth to belevelled and neatly dressed. Disposal lead up to 100 meter. (O) |
| 233 | Excavation above 3m (Q) |
| 234 | Providing and laying 225 or 300 mm thick dry rubble soiling with approved quality stones including filling gaps with small chips ramming with hand rammer etc. complete ® |
| 235 | Providing and laying in position cement concrete of grade M-10 including the cost of centring and shuttering- all level :1:3:6 (1 cement:3 coarse sand (Zone-III) :6 graded stone aggregate 20mm normalsize).(S) |
| 236 | Foundation and plinth in:rafts,footing,column,pedestals,beams,walls,slabs,machine and equipment foundation,pile caps,pipe support foundation. (T) |
| 237 | Providing and placing to correct line and level, in position, machine mixed reinforced cment concrete RCC of grade M20 with required slump for Raft/footings/column/beam/slab etc at all levels up to ground floorslab including vibrating,curing,providing construction joints, leaving cut-outs/ pockets,placing of inserts/ embedments, dewatreing wherever necessary etc., complete all as per drawing, but excludingcost of providing from work for all shapes and the cost of providing reinforcement, inserts/ embedments, as directed by the Engineer (U) |
| 238 | Providing all the materials including binding wires, cleaning, bending, cuttin, hoisting, placing in position, lapping and binding with 16 SWG annealed soft iron or tack welding reinforcement steel for all types of RCC/ Precast work irrespective of location & levels all as per drawings including steel scaffolding, handling and transporting from site stores, complete as directed by using High yield strenthdeformed bars conforming to IS 1786-HYSD Bars (V) |
| 239 | Material for masonary Work for earth pit, Charcoal, Salt etc including construction of earthing chamber and RCC slab cover of M+6 Tower (W) |
| 240 | Shifting of LT Lines with 4x95+1x95+1x16mm2 XLPE AB Cable=0.22Km,4x50+1x50+1x16mm2 XLPE AB cable=0.43KM - Pole WPB GI160x160 11 Mtr |
| 241 | WPB 160x152 (30.44 KG/Mtr) 9 Mtr-with base plate 300x300x12 |
| 242 | XLPE AB Cable (4x95+1x95+1x16) mm2 |
| 243 | XLPE AB Cable (4x50+1x50+1x16) mm2 |
| 244 | Suspension clamp with eye hook |
| 245 | Eye hook for (XLPE Cable Areial bunched Cable) |
| 246 | Pole clamp for EYE Hook for (XLPE Cable Areial bunched Cable) |
| 247 | Conductor dead end Clamp suitable for bare messenger XLPE Cable Areial bunched Cable (25-70 sq.mm) |
| 248 | LT Stay set (Complete) |
| 249 | Stay Insulator |
| 250 | Stay Clamp |
| 251 | 7/10 G.I Stay wire |
| 252 | Piercing Connector |
| 253 | Neutral Connector |
| 254 | GI Nut, Bolt & washer |
| 255 | Earthing Of Support Coil Type |
| 256 | Anticlimbing Device (G.I Barbed Wire 3 Kg per support) |
| 257 | Back Clamp for anticlimbing device 25x3mm.flat, 0.59Kg/Mtr, Flat of 0.510mtr length 4 Nos= (8x0.59x0.510) |
| 258 | Danger Board |
| 259 | Back Clamp for danger plate 25x3mm.flat, 0.59Kg/Mtr, Flat of 0.510mtr length 2 Nos= (2x0.59x0.510) |
| 260 | Sundries |
| 261 | Cement concreting for stay anchor plate with CC 1:2:4,0.2 [email protected] (K) |
| 262 | Concreting of support CC 1:1.5:3,0.45 CUM@6400/- (L) |
| 263 | Concreting of support CC 1:1.5:3,0.375 CUM@6400/- for 09 Mtrs WPB Pole (M) |
| 264 | Concreting of support CC 1:1.5:3,0.375 CUM@6400/- for 11KV WPB Pole (N) |
| 265 | Dismantling Charges for Old Materials - Dismantling Charges for PSC Pole |
| 266 | Dismantling Charges for LT Cable |
| 267 | Dismantling Charges for AAAC |
| 268 | Dismantling Charges for M+6 tower Please Enable Macros to View BoQ information |