| 1 | Conducting physical survey for identification of suitable location for borewell including the loading, unloading and transporting charges for machineries etc., complete as per standard spedifications. |
| 2 | Drilling of 150mm dia Vertical bore in hard rock area using DTH RIG including labour charges for inserting casing pipe assembly in the drilled hole including the transporting charges for the rig and supporting vehicles etc complete |
| 3 | Supply of 150mm dia PVC casing pipe with including cost and conveyance of pipes to work site and all handling charges etc complete TWAd SOR P.14D |
| 4 | Supply of 200mm dia PVC casing pipe with including cost and conveyance of pipes to work site and all handling charges etc complete TWAd SOR P.14D |
| 5 | Supply and delivery of 32 mm HDPE Pipeclass PN 8 with including cost and conveyance to work site and including handling charges etc complete |
| 6 | Rate for flushing of borewell of 6” dia requiring less than 4 hours operation using drill rods/ hose with required size of pipes for various capacity compressor ncluding transportation, labour, and fuel charges for compressors as directed by the TWAD Officerand conducting yield test by ‘V’ notch method if required. |
| 7 | Supply and delivery of Single Phase 2.00 HP Submersible pump 20x150 lpm/m set with including cost and conveyance to work site and handling charges etc complete TWAD SOR P.87 |
| 8 | Supply and delivery of single phase pannel board suitable for 2.00 HP Submersible pump set with including cost and conveyance to work site and handling charges etc complete TWAD SOR P.101 |
| 9 | Supply and delivery of PVC insulated and sheathed 3 core 2.50 sqmm flat type copper cable confirming To IS 694/1990 etc complete TWAD SOR P.107 |
| 10 | Errection charges for 1.50 HP submersible pumpset pannel board and pipes in the bore well work with including all labour charges etc complete TWAd SOR P.252 17C |
| 11 | Supply and delivery of GI specials and other jointing materials and including cost and conveyance to work site and handling labour charges etc complete 32/40 mm MS clamp set |
| 12 | 32mm GM Gate Valve |
| 13 | 32 mm GM Non return valve |
| 14 | Nylon Rope 12 mm dia |
| 15 | 32 mm GI coupler |
| 16 | 50mm SS Collar |
| 17 | 8\\" Bore cap |
| 18 | 25mm PVc Pipe |
| 19 | 25mm dia PVC Tee |
| 20 | 25mm PVC Coupler |
| 21 | 25mm PVC Lbow |
| 22 | Supply and fixing of TNEB meter board suitable for 32 A single phase service connection with 32 A fuse unit (500 V) 32 A neutral link and earth link (1\\"x1/8\\") on TW plank of size 375x300x19mm with supporting TW repers of 1\\" thick an either side with painting with suitable bolt and nuts for fixing the TW plank on wall or board with earth connection and inter connection with 7/20 PVC insulated copper wire from EB meter to fuse unit as per SD 125 |
| 23 | Supply and fixing of Single Pole & Neutral 6A to 32A, 10KA of switch including base TW base plate etc complete |
| 24 | Supply and run off 2 of 4 sqmm (56/0.3) PVC insulated SC unsheathed Cu,Conductor of 1100 V on 7/20 GI bearer wire for service connection mains as per SD 65 |
| 25 | Supply and fixing of HDPE tank with approved quality and approved firm with including cost and conveyance and handling charrges and providing 3 nos of 20mm tap connection with check net washer nipple arrangement and 1 Nos of 25mm scour and 32 mm for over flow pipe etc compelte. TWAD SOR 2000 Ltr Capacity |
| 26 | Construction of brick work pedastal platform for HDPE tank with including earth work ecavation founation concrete Brick work in C.M 1:5 for pedastal, plastering fixing tank pipe connection with accessories, colour washing fixing the HDPE tank writing name board and pipeline conceections etc complete with including cost and conveyance of all materials and including all labour charges etc complete |
| 27 | Earth work excavation for foundation in all sub soils and to full depth as may be directed except hard rock requiring blasting inclusive of shorting . Stutting and bailing out water wherever necessary and refilling the sides of foundation with excavated earth in layer of 15cm thick well rammed and consolidated earth deposting the surplus earth in layers with the compound in place shown by the departmental officers with the compound in place shown by the departmental officers with initial leads and lifts and clearing and leveling the site including refilling excavated earth etc.., complete as per standard specification |
| 28 | Twards cost and supply of Varies size of 6 Kgs / Cm2 PVC O.D. Pipe including cost and conveyance of all meterials and labour charges for loading and Unloading charges etc Complete….as per srandard specification. 90mm Dia PVC pipe |
| 29 | Twards cost and supply of Varies size of 6 Kgs / Cm2 PVC Specials including cost and conveyance of all meterials and labour charges for loading and Unloading charges etc Complete….as per srandard specification. A.90 mm Bend |
| 30 | 90 mm Tee |
| 31 | 150 mm Valve P.no 68 |
| 32 | Lowering PVC rigid pipes and specials to trench and laying to proper grade and alignment,jointing with PVC couplers with cement paste |
| 33 | Refilling with excavated soil (other than sand) complying with the standard specification for filling in foundation and basement and pipe line works as per standard specification etc…complete Please Enable Macros to View BoQ information |