| 1 | Disamantling existing Cement concrete including all labour chrages for removal and clearing away debrish from work site including all labour charges etcc ompletesd as per standard specification |
| 2 | Disamantling existing B.T Roads (or)Macadam Road including all labour chrages for removal and clearing away debrish from work site including all labour charges etcc ompletesd as per standard specification |
| 3 | Earth work excavation for pipe line work and depositing on bank with initial lead of 10m and of 2m in narrow trenches having bed width 1.25m and below for laying of pipes for watter supply sand ,silt or other loose soil ,wet sand or silt not under water light black cotton soil ,sandy loam and ordinary soli SS20B,Hard stiff clay,Stiff black cotton ,hard red earth and earth mixed with small size boulders and gravely soil |
| 4 | Supply and delivery of DUCTILE IRON SOCKET/SPIGOT PIPES FOR CLASS K9 AS PER IS 8329/2000 including all the cost and conveyance of materilas to work site etc complete |
| 5 | 200mm dia DUCTILE IRON SOCKET/SPIGOT PIPES |
| 6 | Supply and delivery of DUCTILE IRON CLASS PN 10FLANGED PIPES AS PER IS 8329/2000 including all the cost and conveyance of materilas to work site etc complete 200mm dia DUCTILE IRON CLASS PN 10 FLANGED PIPES |
| 7 | UP TO oht 3.00M Length of pipes |
| 8 | UP TO oht 2.00M Length of pipes |
| 9 | UP TO oht 1.50M Length of pipes |
| 10 | Supply and delivery of DUCTILE IRON SPECILAS AS PER IS 9523/2000 incluuduing all the Cost and conveyance of materials to work site etc complete |
| 11 | All Socket 100mm -200mm dia |
| 12 | All Flange 100mm -200mm dia |
| 13 | Supply and delivery of CI D/F SLUICE Valve with cap/Wheel as per IS 14846/2000 in 1.0 with ISI Marking including cost and conveyance of materials to work site |
| 14 | 200mm dia CI D/F SLUICE Valve |
| 15 | Supply and delivery of CI Single Air Valve as per ISI 14845/2000 including cost and conveyance of materials to work site |
| 16 | 50mm dia CI Single Air Valve |
| 17 | Supply and delivery of Mechanical Joint Collars including cost and conveyance of materials to work site |
| 18 | 200mm dia MJ Collar |
| 19 | Lowering of C.1 Pipes and specials in the trenches and laying to proper grade and alignment and as directed by the TCMC Officers including all labour charges |
| 20 | 200mm dia DUCTILE IRON SOCKET/SPIGOT PIPES |
| 21 | Jointing C.1/ D.1-S/S pipes and specials with rubber gaskets (tyton joint) including cost of lubricants. (including cost of jointing materials)including all the cost of labour charges 200mm dia D.I S/S pipes and specials |
| 22 | Jointing the C.I/ D.I-S/S pipes and specials with neat cement or cement mortar and spun yarn including caulking the joints, curing. (including cost of jointing materials) ,200mm dia D.I S/S pipes and specials |
| 23 | Jointing of mechanical joint collar, nuts, gasket and fixing in position as directed by departmental officers excluding cost and conveyance of materials to work site and including cost of labour charges200mm dia Mechanical Joint |
| 24 | Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and including curing etc. complete complying with standard specification and as directed by the departmental officers -Mixing by mechanical means |
| 25 | Providing and laying, spreading and compacting graded stone aggregate to Wet mix macadam (WMM) specification including premixing the material with water at OMC in mechanical mix plant carriage to mixed material by tipper to site laying in uniform layers with paver in sub base / base course on well prepared surface and compacting with vibratory roller to achive the desired density complete as per clasue 406 of MORTH specifications. |
| 26 | Plain Cement Concrete 1:2:4 (one cement, two Crushed Stone Sand (M- Sand) and four coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification |
| 27 | Refilling excaveted earth available at site including all the cost of labour chrages for refilling etc complete Please Enable Macros to View BoQ information |