Name of Work:- Construction of Internal Drain at Suisa SMY under Purulia Zilla Regulated Market Committee, Dist. Purulia.
Sl. No.
Item Description
1
Civil Work
2
Earthwork in excavation of foundation trenches or pits in all sorts of soil (including mixed soil but excluding laterite/sandstone) including removing, spreading or stacking the spoils within a lead of 75M as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete.
3
(A) Filling in foundation or plinth by fine sand/ fine sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity)
4
Single brick flat soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with powdered earth or local sand.
5
(I) Cement concrete with graded stone ballast (40 mm size excluding shuttering)
6
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (c) Steel shuttering or 9 to 12 mm thick approved quality ply board shuttering in any concrete work (upto roof of ground floor)
7
Brick work with 1st class bricks in cement mortar (1:6)
8
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor). (2) With 1:4 Cement morter (a) 15 mm thick plaster ( External)i) Ground floor
9
Neat cement punning about 1.5 mm. thick in wall dado, window, sills, floor, drain, etc.
10
Artificial stone in floor, dado, staircase etc. with cement concrete (1:2:4) with stone chips, laid in panels as directed with topping made with ordinary or white cement (as necessary) & marbel dust in proportion (1:2) including smooth finished & rounding off surface & application of cement slurry before flooring works using cement @1.75 kg/sq.m. all complete including all materials & labour 35 mm thk
11
Add GST @ 18 %
12
Add Labour Welfare Cess 1 % Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.