| 1 | Excavation in foundations,trenches etc., in earth work, lift upto 1.50 mts. Stacking the excavated soil not more than 3 mts. Clear from the edge of the excavation & then returning the stacked soil in 15 cms. Layers,when required into plinths sides of foundation etc.,consolidating each deposited layers by ramming & watering & then disposing of all surplus excavated earth as dierected within all leads & lifts as per entire satisfaction of Engineer in charge. |
| 2 | Providing & laying cement concrete 1:3:6 (1cement : 3 sand : 6 graded stone aggregate 40 mm nominal size) excluding the cost of centring & shuttering in Foundation & plinth. |
| 3 | Providing & laying cement concrete1:1.5:3 (1cement :1.5 sand : 3 graded stone aggregate 20 mm nominal size) & curing complete excluding the cost of form work & reinforcement for reinforced concrete work in :- |
| 4 | Foundation,footing,bases of columns and the like & mass concrete. |
| 5 | Wall (any thickness but not less than 0.10 mts.Thickness)attached pillasters,buttresses plinth,& string courses etc.from top of found.level upto floor two level |
| 6 | Prov.form work with steel plates 3.15 mm thick welded with angle iron in frame 30x30x5mm,so as to give a fair finish i/c centring shuttering,strutting & propping etc. with wooden battens & ballies,ht. of propping & centring below supporting floor to ceiling not exceeding 4.00 mts. & removal of the same for in situ-reinforced concrete & plain concrete work :- |
| 7 | Vertical surfaces such as wall (any thick.) partitions & the like i/c attached pillasters,buttresses,plinth & string courses & the like. |
| 8 | Prov.form work of ordinary timber plankings so as to give a rough finish i/c centring, shuttering,strutting & propping etc. ht.of propping & centring below supporting floor to ceiling not exceeding 4 mts. & removal of the same for insitu-reinforced concrete & plain concrete work in :- |
| 9 | Arches beyond 6.00 mts.span |
| 10 | Providing & laying cement concrete 1:1.5:3(1cement :1.5 sand : 3 graded stone aggregate 20 mm nominal size) & curing complete excluding the cost of form work & reinforcement for RCC work in :- |
| 11 | Arches upto floor two level. |
| 12 | Providing Tor steel reinforcement for RCC work i/c bending,binding & placing complete upto floor two level. |
| 13 | Steel work welded in built up sections,trusses & framed work i/c cutting,hoisting & fixing in position & applying a priming coatof red paint :- In grating, framed ,guards,bars, ladders,railing,brackets & similar works. |
| 14 | Providing & laying in trenches GMS/MS Tubes (L/M class) tube fitting (Earth work in trenches to be measured & paid for separately) |
| 15 | 80 mm |
| 16 | Providing and fixing Manhole cover of size 60x60 cm made of angle iron frame size 40x40x5mm thick covered with M.S. sheet 2.00mm thick and welded with angle iron frame 35x35x3mm thick including hings, handles, 8 Nos hold fast and locking arrangement along with lock and key of standred make primer two coat with redoxide paint complete and manhole cover fixed in storage tank/intake with cement concrete 1:1.5:3, nut & bolt and dismentalling of RCC work complete as per direction and to the entire satisfaction of Engineer-in-Charge. Please Enable Macros to View BoQ information |