| 1 | Erection Part of HT Line |
| 2 | Erection of new Steel Tubular Pole 9 mtr. Long Digging of Pit,fixing of insulator, disc and drilling of holes in X-Arm , Bracing Set, Top Clamp, erection of pole, fixing of barbed wire and danger plate, filling of Pit, Alluminium Paint and ramming & painting of poles complete in all respect. |
| 3 | Erection of S.T Double Pole 9 Mtr. Long for Tapping and Dead end Structure :- Digging of Pit fixing of insulator, disc and drilling of holes in X-Arm , Bracing Set, Top Clamp, erection of pole, fixing of barbed wire and danger plate, filling of Pit, Alluminium Paint and ramming & painting of poles complete in all respect. |
| 4 | Erection of Earthing Set.:- Fixing of earthing pipe of pit for coal earthing, fixing of G.I wire to system filling of pit and remaning work complete in all respect. |
| 5 | Erection of Stay Set HT:- Digging of Pit fixing of Stay Rod, filling of Pit, Nozeiling & Tightning complete in all respect. |
| 6 | Stringing and Sagging conductor:-:- Laying of conductor, striging, sagging and biding with insulator with Conductor 7/3.81 (80 mm2) Conductor of 11 KV HT line complete in all respect. |
| 7 | G.I Wire:- Laying of GI wire stringing and sagging and biding with hock etc. complete in all respect. |
| 8 | Erection of GO switch Complete in all Respect. |
| 9 | Erection of D.O. fuse unit Complete in all Respect. |
| 10 | Electrical Inspection Fees for HT Line Complete in all Respect. |
| 11 | Supply Part of HT Line |
| 12 | Prov. Conductor 7/3.81 (80 mm2) {Includes 3 conductor lengths for 3Φ and Additional 1% (Sag, Jumpering and wastage} |
| 13 | Prov. Steel Tubular Poles (9 m, Working Load > 227 kgf/m²) (with Ruling Span 90 m, 8 No. Run thro' and 3 No. Double Pole Dead End Structures) |
| 14 | Prov. RCC Muffs with concerete filling |
| 15 | Prov. Cross Arm: [Channel Iron (100x50x6 mm), Length (1270) mm i/c tolerance of 100 mm either sider) x 8 structure. |
| 16 | Prov. Angle Iron (50x50x6 mm), Length (750 mm x 2 x 8 structures |
| 17 | Prov. Pole Top Bracket [MSCI: 100x50x6 mm 100 mm) |
| 18 | Prov. 11 kV Pin Insulators (Porcelain, 12 kV, 10 KN): 3 No per pole structure |
| 19 | Prov. Belt Set - MS Angle Iron: 50x50x6, Length 1800 mm x 2 No. |
| 20 | Prov. X-Bracing Set - MS Angle Iron: 50x50x6, Length 2125 mm x 2 No. |
| 21 | Prov. X-Arm (Horizontal) - MS Channel Iron: 100X50x5, Length 2340x2 mm x 2 No. formation. |
| 22 | Prov. Insulator 11kV Disc(Polymeric,BS, 90 KN) CD-320 complete in all respect. |
| 23 | DEAD END CLAMPS 7/ 4.26 MM AAAC COND, BALL CLEAVES EYE SOCKET 11/22 KV 7500GMS, Bend Stapples etc. (30 Set Supply by HPSEBL) |
| 24 | Prov. 11 kV Pin Insulators (Porcelain, 12 kV, 10 kN): 3 No per double pole structure |
| 25 | Prov. Stay set complete in all respect (1No. / Single Pole , 4 No. / Double Pole Structures) |
| 26 | Prov. Stay Wire (7/3.15 mm) (9.0 kg Per Stay Set) |
| 27 | Prov. HT Earthing set complete (REC constr. Stand J-1) |
| 28 | Prov. Single Continous Earth wire (GI, 8 SWG) {alongwith 2 wire lengths for avg. one road crossing @ 20 m and Additional 1% (Sag and wastage)} @ 0.102 kg/m (82.65 Kg Supply by HPSEBL) |
| 29 | Prov. Eye Hook for earth wire |
| 30 | Prov. Earth Reel |
| 31 | Prov. Half Clamp [on double pole dead end str. 4 Nos.on run through str. 2 Nos.] |
| 32 | Prov. Full Clamp (on double pole dead end str. 4 Nos.) single pole on run through str. 2 Nos. |
| 33 | Prov. Danger Plate (250X200X1.6 mm) (13 No Supply by HPSEBL) |
| 34 | Prov. Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ or more (with flat and spring washers)] |
| 35 | Prov. Barbed Wire |
| 36 | Prov. Red Oxide |
| 37 | Prov. Aluminium Paint |
| 38 | Prov. X-Arm: [Channel Iron (75x40x4.8 mm), Length : (2800 mm X 4 Nos] for supporting DO fuse unit & GO switch |
| 39 | Prov. Switch Handle Supporting: [Channel Iron (75x40x4.8 mm), Length : 460 mm |
| 40 | Prov. GO AB Switch Unit (11kV, 400A, 25 KA ) Tripple pole O/D type |
| 41 | Prov. D.O Fuse Unit |
| 42 | Transportation and Loading of materials HT lines materials on truck at Divisional Store and same material unloading at road to site of work with manual carriage. |
| 43 | Prov. Luminous Inverter & Battery Combo for Home, Shop & Office – Optimus 2300 Pure Sine Wave 2000VA/24V Inverter + 2X RC25000 200Ah Tall Tubular Batteries 36M Warranty on Inverter & Battery complete in all respect. Please Enable Macros to View BoQ information |