| 1 | Detail of Work |
| 2 | Safe cartage of PCC/ ST poles (up to13 Mtr.) from ESC, SRE/JE store to site of work including loading & unloading at both ends. |
| 3 | Safely cartage of other complete line material 11 KV XLPE cable / LT ABC cable (Except PCC /ST Poles) from ESC, SRE/ JE store to site of work including loading, unloading at both ends. |
| 4 | Safe cartage of 25/63/ 100 KVA T/F from ESC,SRE, to the site of work including loading & unloading at both ends. |
| 5 | Safe cartage of 11 KV CT/PT Unit from ESC,SRE, to the site of work including loading & unloading at both ends. |
| 6 | Safe cartage of 11 KV Fuse set/TPMO set from ESC,SRE, to the site of work including loading & unloading at both ends. |
| 7 | Safe cartage of 11 KV Metering cubical from ESC,SRE, to the site of work including loading & unloading at both ends. |
| 8 | Safely carriage of 11 KV Outgoing VCB 300/150/5A from ESC SRE to the site of work including loading & unloading at both ends. |
| 9 | Safely carriage of 250/400 KVA T/F from ESC, SRE to site of work including loading & unloading at both ends.. |
| 10 | Constriction of plinth for installation of 250/400 KVA T/F of size 1.5x1.5x1.5 mtr made of 9”inch thick wall in all four sides with 6”inch thick RCC Top duly filled with sand and plastered 12mm thick in ratio 1:4 with cement and sand on outer surface of brick wall. |
| 11 | Safely installation of New 250/400 KVA T/F on the plinth by private crain with proper alignment and Complete fitting including making HT connection and commissioning |
| 12 | Providing & Making of Wiremesh fencing size 2.5x2.5x2.5 mtr with grouting making frame of MS angle 35x35x4 mm and fixing four no MS strip size 25x4 mm at equal distance in between the frame and fixing square mesh of 50 mm squre in each frame the fencing should cover all side of T/F with providing 1 no door size 6'x3' with sitakni & dandala with green paints (British/Asian/enamel paints) |
| 13 | Earthing of 250/400 KVA T/F (1 No body & 1 No. neutral earthing) by boring & fixing of G.I pipe 1½ Dia (Jindal Class B) and connecting with G.I. Strip of size 40x5 mm and G.I wire at bottom of G.I pipe to the T/F providing of required charcoal & salt in the pipe. |
| 14 | Erection of single support on PCC/ ST poles (up to 13 Mtr.) Long with complete fitting of all accessories of 11 KV/LT line. complete. |
| 15 | Erection of double Pole on PCC/ ST poles (up to 13 Mtr.) Long with complete fitting with all accessories of 11 KV/LT line. complete. |
| 16 | Providing and fixing of stone ped 300x300x75 |
| 17 | Providing of HDPE Pipe 160 mm dia. |
| 18 | Driling of earth under Road crossing 1.5 mtr. Deep and laying of 02 No. Parreral HDPE pipe 160 mm dia on 0.5 meter distance by drill machine/JCB machine/labour |
| 19 | Laying of 11/33 KV XLPE cable size up to 3x300 sq mm in the 02 No. HDPE pipe 160 mm dia on 0.5 meter distance |
| 20 | Providing and fixing of Number plate with clamp on the each pole. |
| 21 | Providing and Fixing 33 KV/11 KV Danger board with clamp nuts & bolts. for ST Poles made of 3mm thick foam sheet (8\\" X 6\\") with |
| 22 | Providing and fixing of GI barbed wire on the each pole. |
| 23 | Providing of Red oxide Paints (British/Asian/enamel paint) |
| 24 | Providing of Alluminium Paint (British/Asian/enamel paint) |
| 25 | Painting of ST poles 11 Mtr, SP-55 with 2 coats of synthetic enamel paint after one coat of ready mix primer as well as rubbing/cleaning of surface as required for proper completion of work. and remaining by Aluminium paint including all channels/clamps etc |
| 26 | Laying, lifting, Stringing, proper sagging 11 KV AB cable of size 3x95+1x70+/ 3 3x120+1x95 sq.mm. including fixing of all accessories. |
| 27 | Fixing of 11 KV stay rods by digging of pits in block of 600X600X300 mm. & with new brick and nozzling of stay wire 7/10 SWG and fitting the same on the pole |
| 28 | Concreting of stay rod in ratio 1:4:8 with Ist class brick ballst with cement and sand |
| 29 | Earthing of poles by earthing rod. |
| 30 | Providing All Type MS Clamp for ST/PCC Poles with nuts bolts made of new MS flat 50x5 mm best quality. |
| 31 | Providing and fixing LT shekel insulator of size 100x115mm |
| 32 | Providing and fixing nuts & bolts off size. |
| 33 | Providing and fixing Dead end clamp with I-Hook |
| 34 | Providing and fixing Suspention clamp with I-Hook |
| 35 | Providing and fixing Piercing connector Diff.size |
| 36 | Providing and fixing PG Clamp Diff. size |
| 37 | Providing of of 1x16 sq mm Cable for connection of Distribution box. |
| 38 | Providing of 11 KV cable terminations Kit out door & indoor of size 3x35/3x70/3x120/3x185/3x300 sq mm. |
| 39 | Providing of G.I Pipe 100mm 4\\" dia Class B |
| 40 | Laying, lifting, Stringing, sagging jumpring & binding of ACSR Weasel Conductor for 11KV/LT Line complete properly |
| 41 | Laying, lifting, Stringing, sagging jumpring & binding of ACSR Rabbit Conductor for 11KV/LT Line complete properly |
| 42 | Laying, lifting, Stringing, sagging jumpring & binding of ACSR Dog Conductor for 11KV/LT Line complete properly |
| 43 | Removel of 25/63/100 KVA T/F from the existing D/P after opening HT & LT connection and shifting the T/F from the site to ESC, SRE. |
| 44 | Fixing of 11 KV Fuse set/TPMO set complete properly. |
| 45 | Safe installation of 25/63/100 KVA T/F on the double pole with complete fittings including making connections and commissioning properly. |
| 46 | Safe installation of 11 KV CT/PT Unit on the double pole with complete fittings including making connections and commissioning properly. |
| 47 | Safe installation of 11 KV Metering cubical in the room with complete fittings including making connections and commissioning properly. |
| 48 | Shifting, fixing and installation of 11 KV Outgoing VCB 300/150/5A properly. |
| 49 | Pipe Earthing for 11 KV Outgoing VCB 300/150/5A properly. |
| 50 | Chemical Earthing of Metering cubical/CT/PT Unit and connecting with G.I Stirp of size 35x4 mm to the Metering cubical/CT/PT Unit Complete Properly. |
| 51 | Laying, lifting, Stringing, proper sagging LTAB cable of size 3x50+1x35+1x16/ 3x95+1x70+1x16/ 3x120+1x95+1x16 sq.mm. including fixing of all accessories. |
| 52 | Laying, lifting, stringing proper sagging of 11 KV XLPE cable 3X35/3x70/ 3X120/3x185/3x300 sq mm completely. |
| 53 | Fixing making of 11 KV cable terminations Kit out door & indoor of size 3x35/3x70/3z120/3x185/3x300 sq mm. |
| 54 | Laying and making connections of LT PVC/AL.XLPE cable 4x16/4x25/4x35/3.5x70/3.5x50/3.5x150/ sq.mm. from T/F to double pole (approx to 20 Mtr). |
| 55 | Fabrication Charges of Angel & Channal. |
| 56 | Fixing of Distribution box with clamp 01 & 03 Phase Properly. |
| 57 | Fixing of G.I. Pipe 100 mm 4\\" dia 3.5 mtr. Long at the both side of double pole. |
| 58 | Concreting of ST Pole SP-55, (up to 13 Mtr.) with cement concreting in block of 600x600x1500 mm in ration 1:4:8 with cement sand and Brick ballast size 1x1.5 sq mm. |
| 59 | Removel of old ACSR weasel/ Rabbit condutor from the existing 11 KV/LT lines with making roll of condutor and shifting from the site to ESC, SRE/JE store including loading and unloading at both ends. |
| 60 | Dismantling of exiting PCC/ST Pole after opening of comlete accessories Safely carrige from site to ESC SRE including loading & unloading at both ends. Please Enable Macros to View BoQ information |