| 1 | Erection Part of HT Line |
| 2 | Erection of new Steel Tubular Pole 11 mtr. Long Digging of Pit,fixing of insulator, disc and drilling of holes in X-Arm , Bracing Set, Top Clamp, erection of pole, fixing of barbed wire and danger plate, filling of Pit, Alluminium Paint and ramming & painting of poles complete in all respect. |
| 3 | Re-Erection of Tilted Steel Tubular Double Pole 11 mtr. Long Digging of Pit,fixing of insulator, disc and erection of pole, filling of Pit, and ramming complete in all respect. |
| 4 | Erection of Earthing Set.:- Fixing of earthing pipe of pit for coal earthing, fixing of G.I wire to system filling of pit and remaning work complete in all respect. |
| 5 | Erection of Stay Set HT:- Digging of Pit fixing of Stay Rod, filling of Pit, Nozeiling & Tightning complete in all respect. |
| 6 | De-stringing & dismentalling of existing HT conductor i.e. Removal of Conductor & G I Wire From Insulator, De -Stringing complete in all respect |
| 7 | Re-Stringing and Re-sagging conductor:-:- Laying of conductor, striging, sagging and biding with insulator with ACSR wolf condcutor (150 Sq mm) of 11 KV HT line complete in all respect. |
| 8 | Dismentalling of existing HT conductor i.e. Removal of Conductor & GI Wire From Insulator, De -Stringing complete in all respect |
| 9 | G.I Wire:- Laying of GI wire stringing and sagging and biding with hock etc. complete in all respect. |
| 10 | Erection of 11 Kv G.O. switch complete in all respect |
| 11 | Supply Part of 11 KV HT Line |
| 12 | Prov. Steel Tubular Poles 11 Mtr Long along with base plate complete in all respect(SUPPLY BY HPSEBL 1each) |
| 13 | Prov. RCC Muff with concrete filling |
| 14 | Prov. 11 kV Pin Insulators (Porcelain, 12 kV, 10 kN): 3 No per double pole structure |
| 15 | Prov.Nuts and Bolts of Various Sizes |
| 16 | Prov.MS Half Clamp |
| 17 | Prov.MS Full Clamp/stay |
| 18 | Prov.Barbed Wire |
| 19 | Prov.Eye/Earth Hook |
| 20 | Prov.11kv Stay set complete in all respect |
| 21 | Prov. Stay Wire HT (10 kg. per Stay Set) |
| 22 | Prov.11kv Earthing set complete in all respect. |
| 23 | Prov. Earth wire (GI, 8 SWG) {Additional 1% (Sag and wastage)} @ 0.102 kg/m |
| 24 | Providing 11 KV G.O. switch complete in all respect |
| 25 | Prov.11kv Danger Plate (250x200x1.6 mm) |
| 26 | Prov. Aluminium Paint. |
| 27 | Prov. Red Oxide Please Enable Macros to View BoQ information |