| 1 | Erection Part of HT Line |
| 2 | Erection of new Steel Tubular Pole 9 mtr. Long Digging of Pit,fixing of insulator, disc and drilling of holes in X-Arm , Bracing Set, Top Clamp, erection of pole, fixing of barbed wire and danger plate, filling of Pit, Alluminium Paint and ramming & painting of poles complete in all respect. |
| 3 | Erection of Tilted Steel Tubular Double Pole 9 mtr. Long Digging of Pit,fixing of insulator, disc and erection of pole, filling of Pit, and ramming complete in all respect. |
| 4 | Re-Erection of Tilted Steel Tubular Double Pole 9 mtr. Long Digging of Pit,fixing of insulator, disc and erection of pole, filling of Pit, and ramming complete in all respect. |
| 5 | Re-Erection of Tilted Steel Tubular Single Pole 9 mtr. Long Digging of Pit,fixing of insulator, disc and erection of pole, filling of Pit, and ramming complete in all respect. |
| 6 | Erection of Earthing Set.:- Fixing of earthing pipe of pit for coal earthing, fixing of G.I wire to system filling of pit and remaning work complete in all respect. |
| 7 | Erection of Stay Set HT:- Digging of Pit fixing of Stay Rod, filling of Pit, Nozeiling & Tightning complete in all respect. |
| 8 | De-stringing & dismentalling of existing HT conductor i.e. Removal of Conductor & G I Wire From Insulator, De -Stringing complete in all respect |
| 9 | Re-Stringing and Re-sagging conductor:-:- Laying of conductor, striging, sagging and biding with insulator with ACSR wolf condcutor (150 Sq mm) of 11 KV HT line complete in all respect. |
| 10 | Dismentalling of existing HT conductor i.e. Removal of Conductor & GI Wire From Insulator, De -Stringing complete in all respect |
| 11 | G.I Wire:- Laying of GI wire stringing and sagging and biding with hock etc. complete in all respect. |
| 12 | Erection Part of 3-Phase LT Line |
| 13 | Erection of LT line:-Digging of pit of stay, Erection pcc/steel Pole 8/9 mtr Long, fixing of stay rod, noziling and tightening and filling of pit ramming etc.complete in all respect. |
| 14 | Re-Erection of Tilted LT line Pole:-Digging of pit of stay, Erection of STP/PCC Pole 8/9 mtr Long, fixing of stay rod, noziling and tightening and filling of pit ramming etc.complete in all respect. |
| 15 | Erection of stay Set.:- Digging of pit of stay, fixing of stay rod, noziling and tightening and filling of pit ramming etc.complete in all respect. |
| 16 | Earthing:- Digging of pit, fixing of G.I wire to the earthing system and filling of pit and ramming etc.complete in all respect. |
| 17 | Stringing and sagging conductor:- Laying of conductor AAAC 7/3.15 (55mm2) stringing and sagging, binding with insulator complete in all respect (3-Phase L.T Line). |
| 18 | Stringing and sagging conductor:- Laying of conductor AAAC 7/3.15 (55mm2) stringing and sagging, binding with insulator complete in all respect (1-Phase L.T Line) |
| 19 | Dismentalling of existing L.T conductor i.e. Removal of Conductor & GI Wire From Insulator, De -Stringing complete in all respect |
| 20 | G.I Wire:- Laying of GI wire stringing and sagging and biding with hock etc. complete in all respect. |
| 21 | Supply Part of 11 KV HT Line |
| 22 | Prov. Steel Tubular Poles 9 Mtr Long along with base plate complete in all respect(SUPPLY BY HPSEBL6each) |
| 23 | Prov. RCC Muff with concrete filling |
| 24 | Prov. 11 kV Pin Insulators (Porcelain, 12 kV, 10 kN): 3 No per double pole structure |
| 25 | Prov.Nuts and Bolts of Various Sizes |
| 26 | Prov.MS Half Clamp |
| 27 | Prov.MS Full Clamp/stay |
| 28 | Prov.Barbed Wire |
| 29 | Prov.Eye/Earth Hook |
| 30 | Prov.11kv Stay set complete in all respect |
| 31 | Prov. Stay Wire HT (10 kg. per Stay Set) |
| 32 | Prov.11kv Earthing set complete in all respect. |
| 33 | Prov. Earth wire (GI, 8 SWG) {Additional 1% (Sag and wastage)} @ 0.102 kg/m |
| 34 | Prov. Aluminium Paint. |
| 35 | Prov. Red Oxide |
| 36 | Supply Part of 3-Phase LT Line |
| 37 | Prov.pcc/ Steel Pole 8/9 mtr.long complete in all respect. SUPPLY BY HPSEBL 4each) |
| 38 | Prov. Channel Iron (75x40x4.8) [Length- 1.50 Mtr + 0.2 Mtr]( 2 Nos for Height Piece) |
| 39 | Prov. Shackle Insulator (16 Kn) |
| 40 | Prov. D-Iron (U-Clamps) |
| 41 | Prov. Earth Knob |
| 42 | Prov. LT Stay Set (i/c Stay clamp) |
| 43 | Prov. Stay Wire (7/3.15 mm) (6.0 kg Per Stay Set |
| 44 | Prov. Full Clamps [ 2 No for A.I + 1 No for Stay Set] |
| 45 | Prov. Earthing Set complete |
| 46 | Prov. Earth wire (GI, 8 SWG) {Additional 1% (Sag and wastage)} @ 0.102 kg/m |
| 47 | Prov. Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ or more (with flat and spring washers)] |
| 48 | Prov. Spiral PVC Spacer Please Enable Macros to View BoQ information |