| 1 | Providing and fixing of Kota stone slab flooring over 20 mm (average) thick base laid over and jointed with grey cement slurry mixed with pigment to match the shade of the slab, including rubbing and polishing complete with base of cement mortar 1 : 4 ( 1 cement: 4 coarse sand) : and as per specified location in scope of civil work |
| 2 | Providing and fixing of Kota stone slabs 20 mm thick in risers of steps, skirting, dado and pillars laid on 12 mm (average) thick cement mortar 1:3 (1 cement: 3 coarse sand) and jointed with grey cement slurry mixed with pigment to match the shade of the slabs, including rubbing and polishing complete |
| 3 | Providing and fixing of Kota stone slab flooring over 20 mm (average) thick base laid over and jointed with grey cement slurry mixed with pigment to match the shade of the slab, including rubbing and polishing complete with base of cement mortar 1 : 4 ( 1 cement : 4 coarse sand) :Staircase Flooring, Landings and treads |
| 4 | Providing and fixing of Kota stone slabs 20 mm thick in risers of steps,skirting, dado and pillars laid on 12 mm (average) thick cement mortar 1:3 (1 cement: 3 coarse sand) and jointed with grey cement slurry mixed with pigment to match the shade of the slabs, including rubbing and polishing complete. And Stair Riser |
| 5 | #### Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement-All workup to plinth level:### |
| 6 | 1 : 1.5: 3 ( 1 cement : 1.5 coarse sand (zone-Ill): 3graded stone aggregate 20 mm nominal size) Flooring |
| 7 | Providing and laying of 40 mm thick marble chips flooring, rubbed and polished to granolithic finish, under layer 28 mm thick cement concrete 1 :2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 12.5 mm nominal size) and top layer 12 mm thick with white, black, chocolate, grey yellow or green marble chips of sizes from 7 mm to 10 mm nominal size, laid in cementmarble powder mix 3: 1 (3 cement : 1 marble powder) by weight in proportion of 2:3 (2 cement marble powder mix : 3 marble chips) by volume, including cement slurry etc. complete:, Light shade pigment with white cement in flooring work |
| 8 | Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect above plinth level.Note:- Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the ratesfor reinforcement. Thermo-Mechanically Treated bars of grade Fe-500D ormore. In flooring work Roads |
| 9 | Scope of work – Providing and laying M25 grade cement concrete including surface preparation, formwork , mixing, laying, compacting, finishing, earth filling, and curing complete as per specifications, Kerb stones on both sides and directions of the Engineer-in-charge. |
| 10 | Scope of work – Providing and laying M25 grade cement concrete as the final layer over the remaining 60% incomplete portion of the existing road, including surface preparation, formwork (if required), mixing, laying, compacting, finishing, and curing complete as per specifications, Kerb stones on both sides and directions of the Engineer-in-charge. |
| 11 | The M25 grade cement concrete road work has already been completed.Scope of Work:Providing and laying kerb stones on both sides of the completed cement concrete road, as per the drawings, specifications, and directions of the Engineer-in-Charge. |
| 12 | Compound wall with suitable gates as per requirement for MD Bunglow and HOD residences (approx. as per actual at site). Scope Of Work-1.5 Meter Height with both side plaster and paint as per the drawings, specifications, and directions of the Engineer-in-Charge. |
| 13 | Storm Water and external water drains rain water harvesting as per CPCB norms |
| 14 | Culverts (For Surface Water Collection) Scope of Work- Culverts as per site requirement as per CPCB Norms as per the drawings/ specifications, and directions of the Engineer-in-Charge. |
| 15 | Precast drain cover Scope of Work- Precast RCC drain cover as required on site |
| 16 | Rain Water Harvesting #### |
| 17 | Borewell & Brick masonry Completed as site. Scope of Work- Remaining work of Existing Rain water harvesting pit- Repair Work of Pit, Waterproofing, Waterproof Plaster, & all layers of Coarse sand, sand & Aggregates as per CPCB Norms as per the drawings/ specifications, and directions of the Engineer-in-Charge. |
| 18 | Borewell & Brick masonry Completed as site.Scope of Work- Cleaning of Existing Rain Water Harvesting Pit. Reconstruction of Brick Masonry work of Existing Rain water harvesting pit, Waterproofing, Waterproof Plaster, & all layers of Coarse sand, sand & Aggregates as per CPCB Norms as per the drawings/ specifications, and directions of the Engineer-in-Charge. |
| 19 | Rain Water Harvesting Scope of Work- Rain water harvesting at low lying area as per CPCB Norms as per the drawings/ specifications, and directions of the Engineer-in-Charge. |
| 20 | ###Borewell Room Size 3.66*3.66 mtr## |
| 21 | Civil work - As per mentioned specification (attached in tender documents) |
| 22 | Electrical Work (10% of Civil Work )As per mentioned specification (attached in tender documents) |
| 23 | Public Health Work (12% of Civil Work )As per mentioned specification (attached in tender documents) |
| 24 | #Molasses Room Size 3.66*3.66 mtr# |
| 25 | Civil work - As per mentioned specification (attached in tender documents) |
| 26 | Electrical Work (10% of Civil Work ) As per mentioned specification (attached in tender documents) |
| 27 | Public Health Work (12% of Civil Work ) As per mentioned specification (attached in tender documents) |
| 28 | ##Administrative Building## |
| 29 | Civil work – Scope Of Work:i. Flooring- Remaining Tile in rooms, toilet & Kota Stone. (As per mentioned specifications attached herewith tender documents ).ii. Doors- double pattam wooden chaukhats fixed at site. Remaining work of wooden Door panel/Shutter work pending.iii. Windows- window with double pattam wooden chaukhats fixed at site. Remaining work of teak wood window shutters, glass fixing with grill work pending.iv. Painting Work – Internal and External Paint work of total building block including Paint work on Railing, Grill & Door/ window (As per mentioned specifications attached herewith tender documents )v. Staircase- Kota stone Flooring with M.S. Railing (as per attached specification)vi. Brick Koba- Repairing Work on terrace level as per site. |
| 30 | Electrical Work (10% of Civil Work)As per mentioned specification (attached in tender documents) |
| 31 | Public Health Work (12% of Civil Work )As per mentioned specification (attached in tender documents) |
| 32 | Landscaping Work 1% of Building Cost |
| 33 | 11. MD Banglow (500SqM) & Guest House (500SqM)## |
| 34 | Civil work – Upto Plaster work completed with door and window frames fixed, remaining work mentioned below:Scope Of Work:i. Flooring- Total building block internal and external works pending. (As per mentioned specifications attached herewith tender documents ).ii. Doors- double pattam wooden chaukhats fixed at site. Remaining work of wooden Door panel/Shutter work pending.iii. Windows- window with double pattam wooden chaukhats fixed at site. Remaining work of teak wood window shutters, glass fixing with grill work pending.iv. Painting Work – Internal and External Paint work of total building block including Paint work on Railing, Grill & Door/ window (As per mentioned specifications attached herewith tender documents )v. Toilets- Remaining total tile work on walls and floors(As per mentioned specifications attached herewith tender documents).vi. Kitchen- Granite Stone work, storage work pending of Kitchen slab (As per mentioned specifications attached herewith tender documents).vii. Staircase- Kota stone Flooring with M.S. Railing (as per attached specification)viii. Brick Koba- Repairing Work on terrace level as per site. |
| 35 | Electrical Work , (10% of Civil Work )internal conduits and junction boxes has been provided into the walls. Remaining work need to completed As per mentioned specification (attached in tender documents) |
| 36 | Public Health Work (12% of Civil Work )internal water supply and sanitation pipe provided into the walls Remaining work need to completed As per mentioned specification (attached in tender documents) |
| 37 | Landscaping Work 1% of Building Cost Total site work need to completed As per mentioned specification (attached in tender documents) |
| 38 | ###Guest House### |
| 39 | Civil work – As per mentioned specification (attached in tender documents)Scope Of Work:i. Brick Koba- Remaining Work on terrace level as per site.ii. Painting Work – Remaining Work, Door and Windows as per site. (As per mentioned specifications attached herewith tender documents ) |
| 40 | Electrical Work , (8% of Civil Work )Internal conduits and junction boxes has been provided into the walls. Remaining work need to completed As per mentioned specification (attached in tender documents) |
| 41 | Public Health Work (20% of Civil Work )Internal water supply and sanitation pipe provided into the walls Remaining work need to completed As per mentioned specification (attached in tender documents) |
| 42 | Landscaping Work 1% of Building Cost Total site work need to completed As per mentioned specification (attached in tender documents) |
| 43 | # Department Head Residences 04 nos., 100 Sqmt*4 # |
| 44 | Civil work – Scope Of Work:i. Flooring- Remaining Tile in rooms, toilet & Kota Stone. (As per mentioned specifications attached herewith tender documents ).ii. Kitchen- Granite Stone work, storage work pending of Kitchen slab (As per mentioned specifications attached herewith tender documents).iii. Toilets- Remaining tile work on walls and floor(As per mentioned specifications attached herewith tender documents).iv. Doors- double pattam wooden chaukhats fixed at site. Remaining work of wooden Door panel/Shutter work pending.v. Windows- window with double pattam wooden chaukhats fixed at site. Remaining window glass pending Remaining grill work as per site.vi. Painting Work – Rework of Internal and External Paint work of total building block including Paint work on Railing, Grill & Door/ window (As per mentioned specifications attached herewith tender documents )vii. Staircase- Kota stone Flooring with M.S. Railing (as per attached specification)viii. Brick Koba- Repairing Work as per site. |
| 45 | Electrical Work (10% of Civil Work )As per mentioned specification (attached in tender documents) |
| 46 | Public Health Work (15% of Civil Work )As per mentioned specification (attached in tender documents) |
| 47 | Landscaping Work 1% of Building Cost |
| 48 | Workers Quarter Triple Storey = 50 Sqm x 12 (Ground & First & 2nd Floor) ## |
| 49 | Civil work – Foundation completed of total building block. Structure Work (Brick Work & RCC slab & Columns work)completed of Ground & first Floor. Total Brick Work pending & Only RCC slab work completed with columns on 2nd floor.Scope Of Work:i. Plaster- Internal and external plaster work pending of total building block.ii. Flooring- Tile in rooms, toilet & Kota Stone pending in total building block. (As per mentioned specifications attached herewith tender documents ).iii. Doors & Windows- Total work needs to be complete as per mentioned specifications herewith in tender documents.iv. Painting Work – Total Internal and External Paint work of building block including Paint work on Railing, Grill & Door/ window (As per mentioned specifications attached herewith tender documents )v. Staircase- Kota stone Flooring with M.S. Railing (as per attached specification)vi. Brick Masonry Work- Remaining Brick masonry on 2nd floor level need to complete as per mentioned specifications herewith in tender documents.vii. Brick Koba & Parapet Wall- Total work needs to be complete as per mentioned specifications herewith in tender documents. |
| 50 | Electrical Work (10% of Civil Work )As per mentioned specification (attached in tender documents) |
| 51 | Public Health Work (15% of Civil Work )As per mentioned specification (attached in tender documents) |
| 52 | Landscaping Work 1% of Building Cost |
| 53 | ## Workers Quarter Triple Storey = 50 Sqm x 36 (Ground & First & 2nd Floor) ## |
| 54 | Civil work – Upto Plaster level work , tiles in toilet/ kitchen completed , door /window frames with shutters/ Panels fixed with remaining work mentioned below:Scope Of Work:i. Flooring- Total building block internal and external works pending. (As per mentioned specifications attached herewith tender documents ).ii. Doors- double pattam wooden chaukhats fixed with main door shutters and toilet door work completed at site. Remaining work of internal wooden Door panel/Shutter work pending at site.iii. Painting Work – Internal and External Paint work of total building block including Paint work on Railing, Grill & Door/ window (As per mentioned specifications attached herewith tender documents )iv. Staircase- Kota stone Flooring (as per attached specification)v. Brick Koba- Remaining Work on terrace level as per site. |
| 55 | Electrical Work (10% of Civil Work )As per mentioned specification (attached in tender documents) |
| 56 | Public Health Work (15% of Civil Work )As per mentioned specification (attached in tender documents) |
| 57 | Landscaping Work 1% of Building Cost |
| 58 | ## Supervisory Staff Quarter Double Storey Sq.M =80 Sqm x 12. ## |
| 59 | Civil work – Foundation completed of total building block. Structure Work completed (Brick Work & RCC slab & Columns work) of Ground & first Floor.Scope Of Work:i. Plaster- Internal and external plaster work pending of total building block.ii. Flooring- Tile in rooms, toilet & Kota Stone pending in total building block. (As per mentioned specifications attached herewith tender documents).iii. Doors & Windows- Total work needs to be complete as per mentioned specifications herewith in tender documents.iv. Painting Work – Total Internal and External Paint work of building block including Paint work on Railing, Grill & Door/ window (As per mentioned specifications attached herewith tender documents )v. Staircase- Kota stone Flooring with M.S. Railing (as per attached specification)i. Brick Koba & Parapet Wall- Total work needs to be complete as per mentioned specifications herewith in tender documents. |
| 60 | Electrical Work (10% of Civil Work )As per mentioned specification (attached in tender documents) |
| 61 | Public Health Work (15% of Civil Work )As per mentioned specification (attached in tender documents) |
| 62 | Landscaping Work 1% of Building Cost |
| 63 | External Water Supply and Sanitary Works For guest house, canteen , Admin Block, MD & HOD residences. ## |
| 64 | Scope Of Work: External Water Supply and Sanitary Works at site as per CPCB specifications and directions of the Engineer-in-charge. |
| 65 | Scope Of Work: STP With Sequencing Batch Reactors Technology (Civil Work + Electromechanical Work) as per CPCB specifications and directions of the Engineer-in-charge. |
| 66 | ## Electrification of Residential Colony## |
| 67 | External Electrical Supply with Electric Poles, Street Lights & Main Supply upto Building Block (Workers & Supervisor Quarters) as per decision or directions of the Engineer-in-charge. |
| 68 | ## Sanitation & Roads for Residential Colony (Worker +Staff) ## Cement Concrete Road with Kerb stones &Culvert (Worker+Staff) |
| 69 | Scope of work: Providing and laying M25 grade cement concrete including surface preparation, formwork , mixing, laying, compacting, finishing, earth filling, and curing complete as per specifications, Kerb stones on both sides and directions of the Engineer-in-charge. |
| 70 | Culverts (For Surface Water Collection) Scope of Work- Culverts as per site requirement as per CPCB Norms as per the drawings/ specifications, and directions of the Engineer-in-Charge. |
| 71 | External Water Supply and Sanitary Works (Worker+Staff) |
| 72 | Scope Of Work: External Water Supply and Sanitary Works at site as per CPCB specifications and directions of the Engineer-in-charge. |
| 73 | Scope Of Work: STP With Sequencing Batch Reactors Technology (Civil Work + Electromechanical Work) as per CPCB specifications and directions of the Engineer-in-charge. |
| 74 | ## Balance Misc. Work ## |
| 75 | DG. Set Foundation and Diesel storage Finishing work |
| 76 | Culverts (For Surface Water Collection) Scope of Work- Culverts as per site requirement as per CPCB Norms as per the drawings/ specifications, and directions of the Engineer-in-Charge. |
| 77 | ## External Water Supply and Sanitary Works (Worker+Staff) # |
| 78 | Scope Of Work: External Water Supply and Sanitary Works at site as per CPCB specifications and directions of the Engineer-in-charge. |
| 79 | Scope Of Work: STP With Sequencing Batch Reactors Technology (Civil Work + Electromechanical Work) as per CPCB specifications and directions of the Engineer-in-charge. |
| 80 | ### Balance Misc.Work (Scope of Work) ## |
| 81 | DG. Set Foundation and Diesel storage Finishing work at site as per directions of the Engineer-in-charge. |
| 82 | Cable Trenches Covering work at site as per directions of the Engineer-in-charge. |
| 83 | Transformer Foundation Finishing Work at site as per directions of the Engineer-in-charge. |
| 84 | PEB (Erection of Sheeting) at site as per directions of the Engineer-in-charge. |
| 85 | Mill House Painting Door, window at site as per directions of the Engineer-in-charge. |
| 86 | Pan/ Centrifugal Painting Door, window at site as per directions of the Engineer-in-charge. |
| 87 | Clarification House Painting Door, window at site as per directions of the Engineer-in-charge. |
| 88 | Sugar/Drier House Painting Door, window & Rolling Shutters at site as per directions of the Engineer-in-charge. |
| 89 | Workshop Building Painting Door, window & Rolling Shutters at site as per directions of the Engineer-in-charge. |
| 90 | Control Room for Boiling House Painting Door, window at site as per directions of the Engineer-in-charge.Control Room for Boiling House Painting Door, window at site as per directions of the Engineer-in-charge. |
| 91 | Control Room for Mill House (Cane Preparatory Unit) Painting Door, window at site as per directions of the Engineer-in-charge. |
| 92 | Gunny Bag Godown Painting Door, window & Rolling Shutters at site as per directions of the Engineer-in-charge. |
| 93 | Lime Sulphur and Chemical Godown Painting Door, window & Rolling Shutters at site as per directions of the Engineer-in-charge. |
| 94 | General Store Painting Door, window & Rolling Shutters at site as per directions of the Engineer-in-charge |
| 95 | Farmer Toilet Painting at site as per directions of the Engineer-in-charge |
| 96 | Site Grading in Plant Area Please Enable Macros to View BoQ information |