| 1 | E/W Excavation in Foundation in Ordinary Soil i/c 1.5m lift and 30m Lead i/e all Complete.S.I.No. 251 |
| 2 | Concrete with 4cm gauge approved Stone ballast, coarse sand and cement in proportion of 8:4:1 including supply of all materials labour and completion of the work .S I no 281 |
| 3 | R.C.C. work with cement C-sand and stone grit in 1:1.5:3 in lintels etc excluding s/o rainforcement and its binding but including fixing binding centering and shuttering including supply of all materials labourand T&P etc required for proper completion of the work as per S.I.No.-288 |
| 4 | M 150 Class Brick Work 1:4 Cement and approved Coarse sand of 2.25 fm in foundation and plinth including supply of all materials, labour Taxes and T&P etc required for proper completion of work S.I. No. 305 |
| 5 | Concrete with 2cm gauge approved Stone ballast, coarse sand and cement in proportion of 4:2:1 including supply of all materials labour and completion of the work .S I no 279a |
| 6 | Supply and fixing of vitrefied Tiles 600X600 mm size in flooring with 1:3 including supply of all material,labour and T&P etc.required for proper completion of work ch. 14 s.i. no new item no (4) |
| 7 | 12 MM thick Plaster with one part of cement and four part of approved Corse Sand Mortar including supply of all materials labour and completion of the work S.I.no 584. |
| 8 | M.S. or Iron work in plain work such as R.C.C. (1: 2 : 4 ) or R.B. work as per complete S.I.no.502(b) |
| 9 | Mild Steel or Iron work in Febrication of gate S.I NO.502C. |
| 10 | Providing Wall Putty on new surface with approvel quality material of berjer/j.k./birla etc make 2 coatesi/c all etc complete chapter no.15 New Item -11 |
| 11 | Finished wall with water proof weather coat of Apex super paint of app.make and quality on new work with two coat to given on surface and shade over one coat priming surface with water proof putty including supply of all material i/c aall complete .Chapter No. 15 new item no 8+9 |
| 12 | Applying primer coat over new wood work SI no New Item no 1(b) ch-15 |
| 13 | Painting of Door & Window Shutter Two Coats over one Coat of Primer.Ch 15 S.I.No.New Item 2 |
| 14 | P/F of Fencing barbed wire ncluding supply of all material i/c aall complete |
| 15 | P/Fof Sound System ncluding supply of all material i/c aall complete (M.R.) |
| 16 | Lettering and Writing ncluding supply of all material i/c aall complete L.S |
| 17 | S/f of water ,motor for spray ncluding supply of all material i/c aall complete L.S |
| 18 | E/W in cutting or in embankment in ordinary soil including ramming and dressing the surface to required levels and slopes.excavated earth carted from distance up to 5.0Km as per direction of Er. . S.I.No. |
| 19 | S/F Sine Board at site including material labour and T&P etc.as per direction of Engineer incharge. etc complete. |
| 20 | GST 18% Please Enable Macros to View BoQ information |