| 1 | Cleaning of Site |
| 2 | Diwatering of Drain from mechinical Device and Diversion of Drain. |
| 3 | Earth work in old drain silt,mud & refuse material |
| 4 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. as per analysis. |
| 5 | Supply & spreoding & consolidation of G.S.B etc all comp. as per analysis. |
| 6 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources as per analysis. |
| 7 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. excluding cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources as per analysis. |
| 8 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. excluding cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources as per analysis. |
| 9 | Centering and shuttering including strutting, propping etc. and removalof form for Foundations, footings, bases of columns, etc. for mass concrete PCC 5.9.1 |
| 10 | Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. 5.9.2 |
| 11 | Suspended floors, roofs, landings, balconies and access platform |
| 12 | TOR HYSD/ steel reinforced concrete or reinforced brick work (When not included in overall rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of steel its wastage. Bend hooks and authorized overlapping shall be measured upto floor two level as per analysis. Qty. Taken From Items No. 07 & 08 |
| 13 | Disposal of Excavated from site upto 5km in etc all comp. Qty. Taken From Items No. 03 & 04 |
| 14 | Display Boad. Please Enable Macros to View BoQ information |