| 1 | Scraping old white or colour wash including disposal of refuse as directed by the Engineer-in-charge within a distance of 60 meter |
| 2 | Dismantling existing plaster including disposal of refuse as directed by the Engineer-in-charge within a distance of 60 meter |
| 3 | 12 mm Thick cement plaster with 1:4 (one cement four fine sand) morter including supply of all materials labour, T&P etc. required for proper completion of work. S.I. No. 13.11 |
| 4 | Finishing Walls with premium Acrylic smooth exterior paint with Silicon additives of required shade new work (two or more coats applied @ 1.43 Ltr. /10 sqm) over including base coat of water profing cement paint applied @ 2.20 kg/10sqm including cost of all materials, labour, T&P etc. required for proper completion of work. |
| 5 | Preparing base two coat with white Birla putty including cost of all materials, labour, T&P etc. required for proper completion of work |
| 6 | Wall painting (two coats) with plastic emulsion paint of first quality approved brand and manufacture on undecorated wall surface to give even shade including thorougly brushing the surface free from mortar dropping and other foreign matter and sand prepared smooth. |
| 7 | Painting or varnishing on previosly painted old wood or iron work two coat including cost of all material labour T&P etc. complete |
| 8 | Supply and fixing of P.V.C Nahani Trap approved quality & Brand I/C all charges complete. As per direction of E/I. |
| 9 | Supply and fixing of 15 mm dia G.I. Pipe with all necesaary fittings and including cost of all labour, materials T&P etc complete. |
| 10 | Supply and fixing of Orissa type W.C. pan with 10 ltr capacity P.V.C low level cistern including cost of all materials, labour T&P etc. complete as per direction of E/I. |
| 11 | Supply and fixing of Europen type W.C. pan with 10 ltr capacity P.V.C low level cisten including cost of all materials, labour T&P etc. complete as per direction of E/I. |
| 12 | Providing and fixing wash hand basin with C.I. brackets, 15 mm C.P. brass pillar taps, 32 mm C.P. brass waste of standard pattern, including painting of fittings and brackets, cutting and making good the walls wherever require. |
| 13 | Supply and fixing of Bib Cock of approved quality & Brand I/C all charges complete. As per direction of E/I. |
| 14 | Supply and fixing of C.P. Brass Stainless Steel Jali of approved quality & Brand I/C all charges complete. As per direction of E/I. |
| 15 | Supply and fixing of Stainless Steel Soap Dish of approved quality & Brand I/C all charges complete. As per direction of E/I. |
| 16 | Supply and fixing of Looking Mirror of approved quality & Brand I/C all charges complete. As per direction of E/I. |
| 17 | Dismantling cement convrete or brick or granolithic floor including base concrete and including stacking of dismantled materials as directed by the Engineer-in-charge within a distance of 60 meter (200feet) |
| 18 | Providing and laying rectified glazed ceremic floor tiles 300x300 mm, 300x450mm, 300x600mm size (thicknees to specified by approved make & colors) of first quality confirming to is 15622 of approved make in colors & shade laid on 20mm thick cement mortor 1:4 (I cemewnt 4 coarse sand) includnig grouthing the joints with white cement annd matching plament |
| 19 | Supply and fixing of towel ring including cost of all materials, labour T&P etc complete required for the proper completion of the work. As per direction of E/I. |
| 20 | Supply and fixing of towel rail including cost of all materials, labour T&P etc complete required for the proper completion of the work. As per direction of E/I. |
| 21 | Supply and fixing of C.P. Shower including cost of all materials, labour T&P etc complete required for the proper completion of the work. As per direction of E/I. |
| 22 | Supply and fixing of C.P. Wall mixer including cost of all materials, labour T&P etc complete required for the proper completion of the work. As per direction of E/I. |
| 23 | Supply and fixing of C.P. basin mixer including cost of all materials, labour T&P etc complete required for the proper completion of the work. As per direction of E/I. |
| 24 | Supply and fixing of Ceilling Fan including cost of all materials, labour T&P etc complete required for the proper completion of the work. As per direction of E/I. |
| 25 | Supply and fixing of A.C.(1.50 Ton) 5 KW A.C. Stablizaer including cost of all materials, labour T&P etc complete required for the proper completion of the work. As per direction of E/I. |
| 26 | Supply and fixing of Chair for dining table including cost of all materials, labour T&P etc complete required for the proper completion of the work. As per direction of E/I. Please Enable Macros to View BoQ information |