| 1 | Page No-235, Item No-2.14 Dismantling of flexible pavements and disposal of dismantled materials upto a lead of 100 m, stacking serviceable and unserviceable materials separately asper Technical Specifications Clause 202 for Rural Roads of MORD. (II) By Mechanical Means Bituminous Courses |
| 2 | Page No-247, Item No-4.09, iv Construction of Sub Base using Local Materials:Construction of Sub Base using Local Materials, spreading in uniform layers with Motor grader on prepared surface, including screening the metal as necessary, mixing by mix in place method with Rotavator at OMC, and compacting with vibratory roller to achieve the desired density, lighting, guarding and barricading including cost and carriage of all materials and making necessary earthen bundh of one metre wide on each side to protect the edges complete as per Clause 401 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (iv) For Construction of Sub Base by compacting river bed materials. |
| 3 | Page No-248, Item No-4.11/III) A Water Bound Macadam Base Course Supplying & laying as per IRC-SP:063-2004 paver unit of any shade of approved quality as per relevant IS code, laid in pattern as directed in pavement, footpath, driveway (paver block only), etc including necessary underlay complete in all respect with all labour and material.[Border concrete if necessary to be paid separately].Note: Sub-grade CBR should not be less than 5(c) 60 mm thick interlocking designer concrete paver block M35 grade for light-traffic zone, commercial & office complex, tourist resort as per IS: 15658-2006 (over 20-40 mm medium sand bed on 250mm thk WBM/ WMM base course & 250 mm thk bound gnaular /granular sub-base course including cost of sand for sand bed but excluding cost of base ,sub-base course & subgrade preparation.)ii) Coloured Decorative |
| 4 | Ref.:- PWD schedule (building ) ITEM NO.-02 (a), PAGE-01. Earth work in excavation of foundation trenches or drains in all sorts of soil (including mixed soil but excluding laterite or sand stone ) including removing spreading or stacking the spillswithin a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches . Leveling dressing and ramming the bottom. Bailing out water as required complete . a) Depth of excavation not excedding 1500mm. |
| 5 | PWD schedule (building ) of page - 1, ITEM NO.- 3 Providing and Earthwork in filling in foundation trenches with good earth in layers not exceeding 15cm. including watering and ramming layer by layer complete with earth obtained from excavation of foundation or from fresh excavation of land arranged by Department within a lead of 150 m. |
| 6 | PWD Roads Schedule Page No-332, Item No-18.07(a) Rate Analysis Attached Providing and laying Design Mix concrete for plain/ reinforced concrete work in any part of bridge (excluding bottom plugging) with coarse aggregates of appropriate nominal size and grading, fine aggregate (sand) conforming to proper grading zone,both of approved quality and cement, as necessary, including labour , cost and carriage of all materials and including preparation of design mix, approval of the same by the Engineer-in-Charge and cost for quality control, sampling , testing etc. all complete but excluding cost of labour and materials for formwork & reinforcement works. M-15 Grade PCC (Using Concrete mixture) |
| 7 | PWD Roads Schedule Page No-332, Item No-18.05 Rate Analysis Attached Hire and labour charges for Shuttering with or without staging upto 4.0 m height using approved stout props with wooden planks/ply wood/steel sheet plate with required bracing for any kind of plain or reinforced concrete works in all sorts of minor structure including culvert, box culvert, cross-drain etc. The rate is inclusive of fitting, fixing and striking out after completion of work as per specification and direction. (b) Where staging is not required. |
| 8 | Providing & fixing Concrete Sign Board as per IRC specification of size 900 x 750 x 37 mm. thick made with RCC 1:1½:3 with pakur variety stone chips reinforced with double layer IRC febric (75 x 75 mm. mesh) and fixed with necessary nuts & bolts on two RC precast posts 100 mm. x 150 mm. of height 2.65 m. of which top 750 mm. is of section 100 x 13 mm. and 1.90 metre above GL & 0.75 metre below GL including digging hole, repacking the same with cement concrete 1:3:6 with jhama khoa or with local stone chips etc. complete including painting two coats on both faces lettering sign marks etc. as per direction of the Engineer-in-Charge. (The rate is inclusive of cost of reinforcement, concrete, shuttering, nuts & bolts, washer etc. complete.) |
| 9 | Add:- GST @ 18% |
| 10 | Add:- Labour Welfare Cess @ 1% Please Enable Macros to View BoQ information |