| 1 | Unit # 3 Service Charges/overhead charges for deployment of unskilled workers including supply of tools & tackles, PPEs etc. |
| 2 | Unit # 5 Service Charges/overhead charges for deployment of unskilled workers including supply of tools & tackles, PPEs etc. |
| 3 | Unit # 4 Service Charges/overhead charges for deployment of unskilled/semi-skilled workers including supply of tools & tackles, PPEs etc. |
| 4 | Unit # 3 |
| 5 | Supply of fine sand at site including transportation & unloading at destination point, fuel, labour & all other incidental charges complete. |
| 6 | Engagemennt of minimum 5HP capacity pumps in suffiecient nos (minimum 10 nos) including fuel, pump operator for dewatering & desilting / desludging from CT cold basin as per directon of EIC.Electric Pumps may be used on emergency basis as per requirment at site. |
| 7 | Supply of empty cement bags in good condition. |
| 8 | Filling empty Cement bags with dry earth or sand, stitching the bag (cost of thread included) and carrying and placing them in position and all incidental charges complete but excluding cost of sand and gunny bags as per direction of EIC. |
| 9 | Miscellaneous items like hire charges of material for scaffolding, cost of rope for scaffolding, polythene sheet for closing gate, wire brush, wooden planks, safety net, broom jharu etc. required for cleaning works. |
| 10 | Engagement of tractor trailer for disposal of sludge ash, garbages etc from Boiler & Chimney hopper bottom area, surrounding drain, ESP side area, Nuva feeder area etc during overhauling of Unit#3, as per direction of EIC. |
| 11 | Hire & labour charges for erection of special steel scaffolding in conformity with the safety norms under factory act to facilitate safety of workers and use of PPEs like safety belts, net, helmet etc. for job performed as per direction of EIC. |
| 12 | Unit # 5 |
| 13 | Supply of fine sand at site including transportation & unloading at destination point, fuel, labour & all other incidental charges complete. |
| 14 | Engagemennt of minimum 5HP capacity pumps in suffiecient nos (minimum 10 nos) including fuel, pump operator for dewatering & desilting / desludging from CT cold basin as per directo of EIC. |
| 15 | Supply of empty cement bags in good condition. |
| 16 | Filling empty Cement bags with dry earth or sand, stitching the bag (cost of thread included) and carrying and placing them in position and all incidental charges complete but excluding cost of sand and gunny bags as per direction of EIC. |
| 17 | Miscellaneous items like hire charges of material for scaffolding, cost of rope for scaffolding, polythene sheet for closing gate, wire brush, wooden planks, safety net, broom jharu etc. required for cleaning works. |
| 18 | Engagement of tractor trailer for disposal of sludge ash, garbages etc from Boiler & Chimney hopper bottom area, surrounding drain, ESP side area, Nuva feeder area etc during overhauling of Unit#3, as per direction of EIC. |
| 19 | Hire & labour charges for erection of special steel scaffolding in conformity with the safety norms under factory act to facilitate safety of workers and use of PPEs like safety belts, net, helmet etc. for job performed as per direction of EIC. Please Enable Macros to View BoQ information |