| 1 | Dismantling of Structures Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specifications Clause 202 for Rural Roads of MORD. (I) By Manual Means b) Cement Concrete |
| 2 | Dismantling Brick/Tile Work Dismantling of existing structures like culverts, bridges, retaining walls and other structures comprising of brick masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specifications Clause 202 for Rural Roads of MORD. (b) Cement mortar |
| 3 | Removing all types of Hume pipes and stacking within a lead of 1000 m including Earthwork and Dismantling of Masonry Works as per Technical Specification Clause 202 for Rural Roads of MORD. (b) Above 600 mm to 900 mm dia Hume pipe Note :-The excavation of earth, dismantling of stone masonry work in head walls and protection works is not included which is to be measured and paid separately.Credit for retrieved stone from masonry work may be taken as per actual availability. |
| 4 | Excavation for StructuresEarthwork in excavation for foundation of structures upto 3 m depth as per drawing and technical specification Clause 1104 for Rural Roads of MORD including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. |
| 5 | Sand filling in foundation trenches and at the back of abutments, wing-walls etc. with good local sand free from earth in layers not exceeding 15 cm. including inundating each layer by profuse water and poking and ramming layer by layer complete including supply of sand. Quality of sand is to be approved by the Engineer-in-charge. |
| 6 | Supplying and laying Polythene Sheet (150gm / sq.m.) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches. |
| 7 | Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes a) Pakur Variety |
| 8 | Plain / Reinforced Cement Concrete in Substructure with coarse aggregates of appropriate nominal size and grading, fine aggregate (sand) conforming to proper grading zone, both of approved quality, cement and water reducing admixtures, as necessary, including labour, cost and carriage of all materials and including preparation of design mix, approval of the same by the Engineer-in-Charge and cost for quality control, sampling, testing etc. all complete as per drawing and technical specification including the cost of necessary form work and staging complete as per drawing and technical specifications. |
| 9 | Painting the vertical end faces of posts, wheel guards or railing or parapet with alternate bands of different colours as directed by the Engineer-in-charge with approved synthetic enamel paint. b) Two Coats |
| 10 | Supplying, dressing and stacking at site bamboo pins above 5 cm. diameter and upto 7.5 cm. diameter. (Dia. to be measured at mid length). |
| 11 | Driving bamboo pins in standing or flowing water including scaffoldingand driving appliances.(a) Where boats are not necessary. |
| 12 | Supplying, fitting and fixing with iron nails half split bamboo wailingpieces (av. dia. of bamboo not less than 5.0 cm.) |
| 13 | Supplying to site empty cement polythene bage ( capaceity 50 kg) in good condition including stacking , incedental charges etc. all complete ( capacity 50 kg ). |
| 14 | Lobour charges for filling empty cement gunny bag / polythene bag ( capacity 50 kg ) with all kind of earth ( wet or dry ), sand or agreegates ( stone /brick) and sewing as done in case of cement bags , ( tying with a not after filling will not be accepted ) , and stacking within a lead of 30 metre as per direction of Engineer-in-charge (cost is excluding the cost of any types of filling materials ) Note : Volume of earth /sand filled bats should not be less than 0.028 cum./ bag . |
| 15 | Dumping in position earth /sand filled gunny / poly bags (capacity 50 kg ) within a lead of 30 metre inclusive of all lifts . |
| 16 | Disposal / carriage of excavated earth / materials outside Government land by truck or by any other conveyance over kancha / pucca road including making access for plying the truck or any other conveyance beyond 300 m from the excavated point including cost of stacking, loading, unloading, transporting, arrangement of land, if required by agency, spreading and levelling as necessary etc. complete. Measurement : By stacks at loading point after deducting voids as per rule. |
| 17 | Hire and labour charges for Shuttering with or without staging upto 4.0 m height using approved stout props with wooden planks/ply wood/steel sheet plate with required bracing for any kind of plain or reinforced concrete works in all sorts of minor structure including culvert, box culvert, cross drain etc. The rate is inclu -sive of fitting, fixing and striking out after completion of work as per specification and direction. (a) Where staging is not required. |
| 18 | Earthwork from borrow pits over existing embankment or for repairs to embankment, closing breaches etc. within an initial lead of 30 metre and lift of 1.50 metre including breaking clods and depositing the same in layers not exceeding 25 cm. and rough dressing etc. complete as per profile. |
| 19 | Supplying, fitting and fixing of Mild Steel Guide Channel with necessary Mild Steel lugs of required length and size by making hole into wall and fixing with necessary masonry work with maintaining proper line and level as directed by the Engineer-incharge. This item includes two coats of anti-corrossive bituminous paint over two coats of red lead primer. Payment will be made on actual length of Guide Channel. |
| 20 | Supplying, fitting, fixing Mild Steel draw shutter with Mild Steel plate of thickness as specified by the Engineer-in-charge and other necessary Mild Steel sections for sluice including fabricating the same (as per drawing and instruction given by the Engineerin-charge) excluding cost of Mild Steel guide channel, sill beam, gearing arrangement etc. but including painting with two coats of anticorrosive bituminous paint of approved make & brand over two coat of red lead primer and with necessary masonry work with all materials supply etc. complete at site. |
| 21 | Supplying / Replacing at site alloy steel bush for gearing arrangement of Mild Steel regulator shutter including fitting & fixing the same in Cast Iron wheel with bearing and necessary lubricant including cutting internal thread in the bush as necessary including cost of all materials, tools, labours and carriage to site complete of specified diameter as per direction of the Engineer - in - charge. (a) 50 mm. dia |
| 22 | Supplying, fitting & fixing Cast Iron wheel (after taking out existing one if necessary), rim made of 28 mm. to 36 mm. dia to fit any size of gear rod including carriage to site, painting with two coats of bituminous paint over two coats of red lead primer etc. complete as per direction of the Engineer-in-charge. (a) 45 cm dia. Cast Iron wheel. |
| 23 | Supplying, fitting and fixing top runner fabricated by ISMB / ISMC of required size, 2 nos. for each gate of required length and fitting, fixing with required nos. of anchors / lugs by Mild Steel flat bar of required size bifurcated at one end and welded with the other end with top runner and providing with required drilled holes of required dia.for baseplate and all other components asrequired including carriage of all materials to site complete including painting with two coats of anticorrosive bituminous paint of approved make and brand over two coats of red lead primer etc. all complete as per direction of the Engineer-in-charge. |
| 24 | Supplying / Replacing Gear rod by a new Mild Steel Gear rod, threaded length as required and fitting, fixing in position with screw gearing arrangement for operating the draw shutter including taking out old gear rod by cutting bolts etc. complete as per direction of the Engineer-in-charge. (The old materials to be returned to Departmental Godown.)(a) 50 mm. dia. |
| 25 | Supplying fitting & fixing Mild Steel base plate of required size with necessary drilled holes of required dia. and number for fixing with the top runner and one number hole at the center of required dia. for screw rod duly threaded with necessary grooving for easy roller grip arrangement by 13 mm dia. high carbon steel balls in both Gun Metal or other bushes & base plate etc & providing with required bolts and nuts (Mild Steel) 16 mm dia & 100 mm long and one suitable screw as key, complete including painting with two coat of red lead Primer. |
| 26 | Supplying, fitting & fixing in position rubber seal arrangements with musical note harmonic 'J' type for making water tight in both up and down stream of draw shutter as well as flap shutter including guide paths, additional M. S. flats, bolts and nuts for fixing the rubber seal in position including fabrication cost and carriage of all materials to site and complete as per direction of the Engineer-incharge. (a)Flat Type Rubber Seal (i) 59 mm x 6 mm |
| 27 | Supplying, fitting & fixing in position rubber seal arrangements with musical note harmonic 'J' type for making water tight in both up and down stream of draw shutter as well as flap shutter including guide paths, additional M. S. flats, bolts and nuts for fixing the rubber seal in position including fabrication cost and carriage of all materials to site and complete as per direction of the Engineer-incharge. (b) Musical Note, Harmonic Type (i) 59 mm x 6 mm |
| 28 | Taking out sluice gate draw shutter gearing arrangements & pedestal including refitting the same with new nuts & bolts where necessary.(a) Up to 4 sqm. (ii) Taking out only. |
| 29 | Taking out runner of any section including cutting bolts and nuts, dismantling existing concrete or brick work where necessary. |
| 30 | Earthwork in re-excavation / silt clearance of drainage channels in all kinds of soil including sludge and slush but excluding slush mixed with industrial wastes, sewage, municipal garbage, carcasses, etc anddepositing the same as per profile in proper place as directed by the Engineer-in-charge without causing hindrance to traffic and posing health hazard and making arrangement to maintain the site in workable condition including removal of polypacks, brickbats, stone ballasts & boulders, remnants of bullah & bamboo pins and all kinds of water hyacinth, solid / semi solid compact mass formed due to water hyacinth and burning them to ashes or removing outside Govt land where necessary and removal of thick & thorny jungles upto 30 cm girth including shoring and shuttering, if required, and including initial removal of sludge and slush etc by pan or bucket if required, and making arrangement for bailing out of any seepage water and removal of sand or soil blown from underneath, all complete. (Measurement : Pre-work and Post-work level section. Pre-work section to be taken after removal of water hyacinth and all other floating materials etc.) (a) By manual means within an initial lead of 30 M and an initial lift of 1.50 M |
| 31 | Surface Dressing of the ground in any kind of soil including removing vegetation inequalities not exceeding 15 cm depth and disposal of the rubbish within a lead upto 75 m as directed. |
| 32 | Brick work with 1st class bricks in cement mortar (1:4) (a) In foundation and plinth |
| 33 | Making filter with well graded 40 mm down ballasts and laying uniformly behind weep holes, below pitching on bed, side slopes including supply and carriage of all materials to site including preparing bed with earthwork up to 30 cm depth, where necessary and compacting with wooden malllet after laying to achieve designed section as per direction of the Engineer- in - Charge (measurements will be on finished work / in stack after deducting necessary void).) (a) Jhama ballast |
| 34 | Taking out old bamboo pins from piling and stacking the same within 150 metre from the site of work. (a) Where boats are not necessary. |
| 35 | Taking out bamboo wailing pieces after removing iron nails and stacking the same within 150 metre from the site of work.(a) Where boats are not necessary. |
| 36 | Removing earth/sand filled poly bags/gunny bags from the channel bed/slope and initially depositing the same near channel bank at a place as directed by the Engineer-in Charge for measurement of Bag. & then disposing off the same at a distance not less than 150 metre from the channel site. |
| 37 | Bailing out water by pump including all leads and lifts and including making all arrangements for disposal, where continuous flow or seepage of water is encountered and rating of pumps and hours of operation is specifically ascertained as per direction of the Engineer-in-charge. |
| 38 | Supplying, fitting and placing HYSD bar reinforcement in Sub-structure including initial straightening, straightening of coils bars, removal of loose rust (if any), cutting to requisite length bending, binding with annealed wire not less than 1 mm in size and conforming to IS 280 at every intersection hooked and bent to correct shape and placed on forms etc. including cost of black annealed wire and cost of loading, unloading, carriage of all steel materials complete as per drawing and technical specifications and direction of Engineer-in-charge. |
| 39 | Providing weep holes in Brick masonry / Plain / Reinforced concrete abutment, wing wall / return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V:20H towards drawing face. Complete as per drawing and Technical specifications |
| 40 | Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification. B) Sandy material |
| 41 | Supplying & laying as per IRC-SP:063-2004 paver unit of any shade of approved quality as per relevant IS code, laid in pattern as directed in pavement, footpath, driveway (paver block only), etc including necessary underlay complete in all respect with all labour and material. [Border concrete if necessary to be paid separately].Note: Sub-grade CBR should not be less than 5.(c) 60 mm thick interlocking designer concrete paver block M- 35 grade for light-traffic zone,commercial & officecomplex, tourist resort as per IS: 15658-2006 (over 20-40 mm medium sand bed on 250mm thk WBM/ WMM base course & 250 mm thk bound gnaular /granular sub-base course including cost of sand for sand bed but excluding cost of base, sub-base course & subgrade preparation.)(i) Grey Please Enable Macros to View BoQ information |