| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres All kinds of soil |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level in 1:3:6 (1cement: 3 coarse sand: 6 graded stone aggregate 20mm nominal size using plums (size not over 160mm split nallah stone or quarry stone @ 30% of grass volume) crushed |
| 4 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in Cement mortar 1:6 ( 1 cement : 6 coarse sand) |
| 5 | Providing and laying damp-proof Course 50 mm thick with cement concrete 1:2:4 (1 cement:2 coarse sand: 4 graded stone aggregate 20 mm nominal size) and curing complete |
| 6 | Centring and Shuttering including strutting, propping etc and removal of form work for Foundations, footings, bases of columns etc. for mass concrete |
| 7 | Centring and Shuttering including strutting, propping etc and removal of form work for Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. |
| 8 | 12 mm Cement plaster of mix:1 : 6 ( 1 cement : 6 fine sand) |
| 9 | 15mm Cement plaster on the rough side of single or half brick wall of mix:1 : 6 (1 cement : 6 fine sand) |
| 10 | Finishing walls with water proofing cement paint of required shade New work (two or more coats) applied @3.84 kg/10sqm |
| 11 | Carriage of materials by mechanical transport including loading / unloading and stacking complete. Sand lead up to 80 kms avg. |
| 12 | Carriage of materials by mechanical transport inculding loading / unloading and stacking complete. Stone aggregate below 40 mm lead up to 15 kms avg. |
| 13 | Carriage of materials by mechanical transport inculding loading / unloading and stacking complete. Bricks lead up to 95 kms avg. |
| 14 | Carriage of materials by mechanical transport including loading/ unloading and stacking complete. Stone lead up to 15 kms avg. Please Enable Macros to View BoQ information |