|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres All kinds of soil |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level in 1:3:6 (1cement: 3 coarse sand: 6 graded stone aggregate 20mm nominal size using plums (size not over 160mm split nallah stone or quarry stone @ 30% of grass volume) crushed |
| 4 | Brick work with common burnt clay F.P.S.(non-modualar) bricks of class designation 75 in foundation and plinth in Cement mortar 1 :6 ( 1 cement : 6 coarse sand) |
| 5 | Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement.1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) |
| 6 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level & above plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more. |
| 7 | Providing and laying drain flooring / coping 50 mm thick with cement concrete 1:2:4 (1 cement:2 coarse sand: 4 graded stone aggregate 20 mm nominal size) and curing complete |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns for mass concrete. |
| 9 | 12 mm cement plaster of mix 1:6 ( 1 cement : 6 coarse sand) |
| 10 | 15mm Cement plaster on the rough side of single or half brick wall of mix 1 : 6 ( 1 cement : 6 fine sand) |
| 11 | Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. Welded |
| 12 | Finishing walls with water proofing cement paint of required shade on New work (two or more coats applied @ 3.84 kg/10sqm) |
| 13 | Carriage of materials by mechanical transport including loading / unloading and stacking complete. Sand lead up to 60 kms avg. |
| 14 | Carriage of materials by mechanical transport including loading / unloading and stacking complete. Stone aggregate lead up to 20 kms avg. |
| 15 | Carriage of materials by mechanical transport including loading / unloading and stacking complete. Stone lead up to 20 kms avg. |
| 16 | Carriage of materials by mechanical transport including loading / unloading and stacking complete. Bricks lead up to 75 kms avg. Please Enable Macros to View BoQ information |