| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres in All kinds of soil |
| 2 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size)incl. all leads, lifts & carriage of material by MT/ H.L. |
| 5 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts,struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchors blocks, plain window sills, fillets etcupto floor V level, including curing but excluding the cost of centring, shuttering and finishing with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) . |
| 6 | Centring and shuttering including strutting propping etc and removal of form work |
| 7 | Foundations, footings, bases of columns etc. for mass concrete |
| 8 | Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. |
| 9 | Hand packing stones in wire crates including the cost of stones and cost of crates. |
| 10 | Supplying and laying including digging, carrying by lorry, filling River Bed Material including watering & consolidation in layers to specified lines, camber, grades and cross sections. Finished work including material , labour all leads , lifts and carriage of material by MT/HL. |
| 11 | providing and fixing 100 mm dia PVC pipe for weep holes |
| 12 | carriages of materials by mechinical transport incl. loading, unloading and stacking complete. |
| 13 | stone agg 20 mm nominal size by avg lead of 9 km |
| 14 | stone agg above 40 mm nominal size for an lead of 9 kms |
| 15 | Carriage of stone boulder for an average lead of 2 kms. |
| 16 | Sand for an average lead of 2 km Please Enable Macros to View BoQ information |