Sales : +91-777 804 8217
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 23-03-2026 | Extension1 | Date | 30-03-2026 |
| Sl. No. | Item Description |
| 1 | Break-down work (Emergency works) for 220KV Lines |
| 2 | Jumpers (Replacement of burnt/damaged jumpers and tightening of remaining jumpers on the same tower) |
| 3 | Disc Insulators ( Replacement of damaged disc insulators) |
| 4 | Tension String |
| 5 | Suspension String |
| 6 | Power Conductor |
| 7 | Restoration of snapped power conductor(per phase). Complete job including mid-span compression joint, laying of conductor, rough sagging, tensioning of conductor dead-end assembly etc. upto span of 500 metres. |
| 8 | Restoration of snapped power conductor(per phase). Complete job including mid-span compression joint, laying of conductor, rough sagging, tensioning of conductor dead-end assembly etc. beyond span of 500 metres and upto 1000 metres. |
| 9 | Earth Wire |
| 10 | Restoration of snapped earthwire complete job including mid-span compression joint, laying of conductor, rough sagging, tensioning of earthwire, dead-end assembly etc. upto span length of 500 metres |
| 11 | Restoration of snapped earthwire complete job including mid-span compression joint, laying of conductor, rough sagging, tensioning of earthwire, dead-end assembly etc. beyond span length of 500 meters and upto 1000 meters |
| 12 | Planned works |
| 13 | Checking and tightening of jumpers |
| 14 | Replacement of damaged /burnt out jumpers |
| 15 | Fixing of damper/vibrator on earthwire/ACSR/Panther Conductor |
| 16 | Replacement of damaged disc insulators |
| 17 | Tension string |
| 18 | Suspension string |
| 19 | Repairing of power conductor when lowering of conductor is necessary. Complete job including laying of conductor, making of compression joint/compression sleeve, if any, rough sagging tensioning of conductor, fixing dead end assembly etc. upto span of 500 meter |
| 20 | Repairing of power conductor when lowering of conductor is necessary. Complete job including laying of conductor, making of compression joint/compression sleeve, if any, rough sagging tensioning of conductor, fixing dead end assembly etc beyond span of 500 metre and upto 1000mts. |
| 21 | Repairing of ground wire (earthwire) when lowering of conductor is necessary. Complete job including laying of conductor, making of compression joint/Repair Sleeve (compression type), if any, rough sagging tensioning of conductor, fixing dead end assembly etc. upto span of 500 meter |
| 22 | Repairing of ground wire (earthwire) when lowering of conductor is necessary. Complete job including laying of conductor, making of compression joint/Repair Sleeve (compression type), if any, rough sagging tensioning of conductor, fixing dead end assembly etc. beyond span of 500 meter and upto 1000 meters |
| 23 | Stringing and saging of conductors including sagging, tensioning, fitting of dead end assamblies etc.(complete job) |
| 24 | Stringing and saging of ground wire including sagging, tensioning, fitting of dead end assamblies etc.(complete job) |
| 25 | For Double circuit tower including Shutdown factor |
| 26 | Foundation:-Repairing of damaged foundation/top sealing including material . |
| 27 | Repairing of protection wall(Revetment) including back filling of earth with RR Masonry including material. |
| 28 | Repairing of RCC concreating including material.. |
| 29 | Earth work in excavation in all kinds of soil |
| 30 | Backfilling of good earth in the tower platform or behind the protection wall or whereever required |
| 31 | Provision of providing crate wall (Gabbon wall) |
| 32 | Checking & Tightening of nuts and bolts of tower superstructures and replacement of missing ones. |
| 33 | a) Tower weight more than 4 tonnes to 7.5 tonnes |
| 34 | b) Tower weight more than 7.5 tonnes |
| 35 | Checking / tightening of tower footing earthing bolts and measuring tower footing resistance. |
| 36 | Branch cutting under the corridor of transmission line |
| 37 | Making temporary approach path |
| 38 | Deweeding/Platform clearance/corridor clearance of the area under the tower/transmission line |
| 39 | Replacement of missing tower members. |
| 40 | Reparing damaged conductor by using helical sleeve/Armour Rod/repair sleeve or Bolted or by shorting method with out lowering the conductor. |
| 41 | Fixing of anti-climbing device/Bird Guard over S/C & D/C tower |
| 42 | Fixing of phase plates/No. plates/danger plates over S/C & D/C tower |
| 43 | Maintaining the adequate spacing between the two consecutive conductors by way of cutting the conductors and making use of new tension fittings |
| 44 | Maintaining the adequate spacing between the two consecutive conductors by way of adding or pull out the disc insulators from the Disc insulators string |
| 45 | Dismantling works |
| 46 | Dismantling of Emergency Restoration System (ERS) T&P Material i.e. articulated base (Gimbal), mast sections, box sections, guy plates/swivels, bolts, & nuts etc. |
| 47 | Dismantling of conductor used in Emergency Restoration System (ERS) per phase(per string) |
| 48 | Dismantling of anti-climbing device/Bird Guard over S/C & D/C tower |
| 49 | Dismantling of phase plates/No. plates/danger plates over S/C & D/C tower |
| 50 | Dismantling of tower member from the tower |
| 51 | Dismantling of vibration damper on conductor/earthwire |
| 52 | Dismantling of damaged conductor/conductor from the towers per phase(per string) |
| 53 | Dismantling of damaged Earth wire/earthwire from the towers |
| 54 | Collection of Dismantled/damaged ACSR Zebra/Panther conductor from the site of work to store by way of making its loops and then its loading in the mechanical vehicle. |
| 55 | Providing of Skilled /Semi-Skilled / UnSkilled labour for the works which are not covered in the above |
| 56 | Skilled Labour ( Rigger/Fitter) |
| 57 | Semi-skilled Labour ( Asstt. Fitter) |
| 58 | UnSkilled Labour |
| 59 | Manual Carriage(for first 100m distance) |
| 60 | carriage of Emergency Restoration System (ERS) T&P Material |
| 61 | carriage of tower material members |
| 62 | carriage of T&P items i.e Foursheave ,comealong clamp,pulleys, rollers,PP ropes etc. |
| 63 | carriage of Disc insulators /Dampers/conductor fittings |
| 64 | carriage of ACSR zebra/Panther conductor |
| 65 | Manual Carriage(for every subsequent 100 meter distance) |
| 66 | carriage of Emergency Restoration System (ERS) T&P Material i.e. articulated base (Gimbal), mast sections, box sections, guy plates/swivels, bolts, & nuts etc. |
| 67 | carriage of tower material members |
| 68 | carriage of T&P items i.e Foursheave ,comealong clamp,pulleys, rollers,PP ropes etc. |
| 69 | carriage of Disc insulators /Dampers/conductor fittings |
| 70 | carriage of ACSR zebra/panther conductor |
| 71 | Loading and unloading |
| 72 | loading of Emergency Restoration System (ERS) T&P Material i.e. articulated base (Gimbal), mast sections, box sections, guy plates/swivels, bolts, & nuts etc. |
| 73 | unloading ofEmergency Restoration System (ERS) T&P Material i.e. articulated base (Gimbal), mast sections, box sections, guy plates/swivels, bolts, & nuts etc. |
| 74 | loading of ACSR zebra/Panther conductor in Mechanical transport |
| 75 | unloading of ACSR zebra/Panther condutor from mechanical transport |
| 76 | loading of T&P items i.e Foursheave ,comealong clamp,pulleys, rollers,PP ropes etc. in Mechanical transport |
| 77 | unloading of T&P items i.e Foursheave ,comealong clamp,pulleys, rollers,PP ropes etc. in Mechanical transport |
| 78 | loading of Disc insulators /Dampers/conductor fittings etc in Mechanical transport |
| 79 | unloading of Disc insulators /Dampers/conductor fittings etc in Mechanical transport |
| 80 | Erection and Stringing of Emergency Restroration System(ERS) |
| 81 | Erection of Emergency Restroration System(ERS) complete in all aspects as per requirement at site including articulated base (Gimbal), mast sections, box sections, guy plates/swivels, bolts, & nuts etc. |
| 82 | Stringing of Emergency Restroration System(ERS) complete in all aspects as per requirement at site with ACSR Zebra Conductor |
| 83 | Stringing of Emergency Restroration System(ERS) complete in all aspects as per requirement at site with Panther Conductor |
| 84 | Store handling: |
| 85 | Unloading / Loading of T&P Material(i.e Four Sheaves pulley ,Pulleys ,Ropes ,Compression machine etc) for Transmission Line works in divisional stores narwal/bhatindi including manual carriage within store yard by way of sorting and its checking |
| 86 | Unloading / Loading of Emergency Restoration System (ERS) T&P Material( i.e. articulated base (Gimbal), mast sections, box sections, guy plates/swivels, bolts, & nuts etc.) for Transmission Line Restoration works in divisional stores narwal/bhatindi including manual carriage within store yard by way of sorting and its checking |
| 87 | Unloading / Loading of Cement in divisional store narwal/bhatindi including manual Carriage within store yard). |
| 88 | Unloading / Loading of Crates in divisional store narwal/bhatindi including manual Carriage within store yard). |
| 89 | Unloading / Loading of Disc Insulators/Fittings in divisional store narwal/bhatindi Including manual Carriage within store yard) by way of sorting and its checking for breakage. |
| 90 | Unloading / Loading of ACSR/Panther conductor etc in divisional store narwal/bhatindi Including manual Carriage within store yard) by way of sorting,unreeling from the drum and its checking. |
| 91 | Sorting of tower members in the divisonal store and its stacking at proper place including its manual carriage within store yard. |
| 92 | Unloading / Loading of Iron material such as Tar steel / MS angle/MS Flat etc in divisional store narwal/bhatindi Including manual Carriage within store yard) by way of sorting and its checking. |
| 93 | PVC panelling of wall |
| 94 | Mechanical Carriage of T&P and other allied material from divisional store to site of work and back carriage of T&P |
| 95 | Average distance upto 40Km |
| 96 | Average distance upto 60Km |
| 97 | Average distance upto 80Km |
| 98 | Average distance upto 200Km |
| 99 | Average distance upto 300 Km |
| 100 | Average distance upto 400 Km |
| 101 | Mechanical Carriage of Emergency Restoration System(ERS)T&P and other allied material from divisional store to site of work and back carriage of T&P |
| 102 | Average distance upto 40Km |
| 103 | Average distance upto 60Km |
| 104 | Average distance upto 80Km |
| 105 | Average distance upto 200Km |
| 106 | Average distance upto 300 Km |
| 107 | Average distance upto 400 Km |
| 108 | Break-down work (Emergency works) for 132KV Lines |
| 109 | Jumpers (Replacement of burnt/damaged jumpers and tightening of remaining jumpers on the same tower) |
| 110 | Disc Insulators ( Replacement of damaged disc insulators) |
| 111 | Tension String |
| 112 | Suspension String |
| 113 | Power Conductor |
| 114 | Restoration of snapped power conductor(per phase). Complete job including mid-span compression joint, laying of conductor, rough sagging, tensioning of conductor dead-end assembly etc. upto span of 500 metres. |
| 115 | Restoration of snapped power conductor(per phase). Complete job including mid-span compression joint, laying of conductor, rough sagging, tensioning of conductor dead-end assembly etc. beyond span of 500 metres and upto 1000 metres. |
| 116 | Earth Wire |
| 117 | Restoration of snapped earthwire complete job including mid-span compression joint, laying of conductor, rough sagging, tensioning of earthwire, dead-end assembly etc. upto span length of 500 metres |
| 118 | Restoration of snapped earthwire complete job including mid-span compression joint, laying of conductor, rough sagging, tensioning of earthwire, dead-end assembly etc. beyond span length of 500 meters and upto 1000 meters |
| 119 | Planned works |
| 120 | Checking and tightening of jumpers |
| 121 | Replacement of damaged /burnt out jumpers |
| 122 | Fixing of damper/vibrator on earthwire/ACSR/Panther Conductor |
| 123 | Replacement of damaged disc insulators |
| 124 | Tension string |
| 125 | Suspension string |
| 126 | Repairing of power conductor when lowering of conductor is necessary. Complete job including laying of conductor, making of compression joint/compression sleeve, if any, rough sagging tensioning of conductor, fixing dead end assembly etc. upto span of 500 meter |
| 127 | Repairing of power conductor when lowering of conductor is necessary. Complete job including laying of conductor, making of compression joint/compression sleeve, if any, rough sagging tensioning of conductor, fixing dead end assembly etc beyond span of 500 metre and upto 1000mts. |
| 128 | Repairing of ground wire (earthwire) when lowering of conductor is necessary. Complete job including laying of conductor, making of compression joint/Repair Sleeve (compression type), if any, rough sagging tensioning of conductor, fixing dead end assembly etc. upto span of 500 meter |
| 129 | Repairing of ground wire (earthwire) when lowering of conductor is necessary. Complete job including laying of conductor, making of compression joint/Repair Sleeve (compression type), if any, rough sagging tensioning of conductor, fixing dead end assembly etc. beyond span of 500 meter and upto 1000 meters |
| 130 | Stringing and saging of conductors including sagging, tensioning, fitting of dead end assamblies etc.(complete job) |
| 131 | Stringing and saging of ground wire including sagging, tensioning, fitting of dead end assamblies etc.(complete job) |
| 132 | For Double circuit tower including Shutdown factor |
| 133 | Foundation:-Repairing of damaged foundation/top sealing including material . |
| 134 | Repairing of protection wall(Revetment) including back filling of earth with RR Masonry including material. |
| 135 | Repairing of RCC concreating including material.. |
| 136 | Earth work in excavation in all kinds of soil |
| 137 | Backfilling of good earth in the tower platform or behind the protection wall or whereever required |
| 138 | Provision of providing crate wall (Gabbon wall) |
| 139 | Checking & Tightening of nuts and bolts of tower superstructures and replacement of missing ones. |
| 140 | a) Tower weight more than 4 tonnes to 7.5 tonnes |
| 141 | b) Tower weight more than 7.5 tonnes |
| 142 | Checking / tightening of tower footing earthing bolts and measuring tower footing resistance. |
| 143 | Branch cutting under the corridor of transmission line |
| 144 | Making temporary approach path |
| 145 | Deweeding/Platform clearance/corridor clearance of the area under the tower/transmission line |
| 146 | Replacement of missing tower members. |
| 147 | Reparing damaged conductor by using helical sleeve/Armour Rod/repair sleeve or Bolted or by shorting method with out lowering the conductor. |
| 148 | Fixing of anti-climbing device/Bird Guard over S/C & D/C tower |
| 149 | Fixing of phase plates/No. plates/danger plates over S/C & D/C tower |
| 150 | Maintaining the adequate spacing between the two consecutive conductors by way of cutting the conductors and making use of new tension fittings |
| 151 | Maintaining the adequate spacing between the two consecutive conductors by way of adding or pull out the disc insulators from the Disc insulators string |
| 152 | Dismantling works |
| 153 | Dismantling of Emergency Restoration System (ERS) T&P Material i.e. articulated base (Gimbal), mast sections, box sections, guy plates/swivels, bolts, & nuts etc. |
| 154 | Dismantling of conductor used in Emergency Restoration System (ERS) per phase(per string) |
| 155 | Dismantling of anti-climbing device/Bird Guard over S/C & D/C tower |
| 156 | Dismantling of phase plates/No. plates/danger plates over S/C & D/C tower |
| 157 | Dismantling of tower member from the tower |
| 158 | Dismantling of vibration damper on conductor/earthwire |
| 159 | Dismantling of damaged conductor/conductor from the towers per phase(per string) |
| 160 | Dismantling of damaged Earth wire/earthwire from the towers |
| 161 | Collection of Dismantled/damaged ACSR Zebra/Panther conductor from the site of work to store by way of making its loops and then its loading in the mechanical vehicle. |
| 162 | Providing of Skilled /Semi-Skilled / UnSkilled labour for the works which are not covered in the above |
| 163 | Skilled Labour ( Rigger/Fitter) |
| 164 | Semi-skilled Labour ( Asstt. Fitter) |
| 165 | UnSkilled Labour |
| 166 | Manual Carriage(for first 100m distance) |
| 167 | carriage of Emergency Restoration System (ERS) T&P Material |
| 168 | carriage of tower material members |
| 169 | carriage of T&P items i.e Foursheave ,comealong clamp,pulleys, rollers,PP ropes etc. |
| 170 | carriage of Disc insulators /Dampers/conductor fittings |
| 171 | carriage of ACSR zebra/Panther conductor |
| 172 | Manual Carriage(for every subsequent 100 meter distance) |
| 173 | carriage of Emergency Restoration System (ERS) T&P Material i.e. articulated base (Gimbal), mast sections, box sections, guy plates/swivels, bolts, & nuts etc. |
| 174 | carriage of tower material members |
| 175 | carriage of T&P items i.e Foursheave ,comealong clamp,pulleys, rollers,PP ropes etc. |
| 176 | carriage of Disc insulators /Dampers/conductor fittings |
| 177 | carriage of ACSR zebra/panther conductor |
| 178 | Loading and unloading |
| 179 | loading of Emergency Restoration System (ERS) T&P Material i.e. articulated base (Gimbal), mast sections, box sections, guy plates/swivels, bolts, & nuts etc. |
| 180 | unloading ofEmergency Restoration System (ERS) T&P Material i.e. articulated base (Gimbal), mast sections, box sections, guy plates/swivels, bolts, & nuts etc. |
| 181 | loading of ACSR zebra/Panther conductor in Mechanical transport |
| 182 | unloading of ACSR zebra/Panther condutor from mechanical transport |
| 183 | loading of T&P items i.e Foursheave ,comealong clamp,pulleys, rollers,PP ropes etc. in Mechanical transport |
| 184 | unloading of T&P items i.e Foursheave ,comealong clamp,pulleys, rollers,PP ropes etc. in Mechanical transport |
| 185 | loading of Disc insulators /Dampers/conductor fittings etc in Mechanical transport |
| 186 | unloading of Disc insulators /Dampers/conductor fittings etc in Mechanical transport |
| 187 | Erection and Stringing of Emergency Restroration System(ERS) |
| 188 | Erection of Emergency Restroration System(ERS) complete in all aspects as per requirement at site including articulated base (Gimbal), mast sections, box sections, guy plates/swivels, bolts, & nuts etc. |
| 189 | Stringing of Emergency Restroration System(ERS) complete in all aspects as per requirement at site with ACSR Zebra Conductor |
| 190 | Stringing of Emergency Restroration System(ERS) complete in all aspects as per requirement at site with Panther Conductor |
| 191 | Store handling: |
| 192 | Unloading / Loading of T&P Material(i.e Four Sheaves pulley ,Pulleys ,Ropes ,Compression machine etc) for Transmission Line works in divisional stores narwal/bhatindi including manual carriage within store yard by way of sorting and its checking |
| 193 | Unloading / Loading of Emergency Restoration System (ERS) T&P Material( i.e. articulated base (Gimbal), mast sections, box sections, guy plates/swivels, bolts, & nuts etc.) for Transmission Line Restoration works in divisional stores narwal/bhatindi including manual carriage within store yard by way of sorting and its checking |
| 194 | Unloading / Loading of Cement in divisional store narwal/bhatindi including manual Carriage within store yard). |
| 195 | Unloading / Loading of Crates in divisional store narwal/bhatindi including manual Carriage within store yard). |
| 196 | Unloading / Loading of Disc Insulators/Fittings in divisional store narwal/bhatindi Including manual Carriage within store yard) by way of sorting and its checking for breakage. |
| 197 | Unloading / Loading of ACSR/Panther conductor etc in divisional store narwal/bhatindi Including manual Carriage within store yard) by way of sorting,unreeling from the drum and its checking. |
| 198 | Sorting of tower members in the divisonal store and its stacking at proper place including its manual carriage within store yard. |
| 199 | Unloading / Loading of Iron material such as Tar steel / MS angle/MS Flat etc in divisional store narwal/bhatindi Including manual Carriage within store yard) by way of sorting and its checking. |
| 200 | PVC panelling of wall |
| 201 | Mechanical Carriage of T&P and other allied material from divisional store to site of work and back carriage of T&P |
| 202 | Average distance upto 40Km |
| 203 | Average distance upto 60Km |
| 204 | Average distance upto 80Km |
| 205 | Average distance upto 200Km |
| 206 | Average distance upto 300 Km |
| 207 | Average distance upto 400 Km |
| 208 | Mechanical Carriage of Emergency Restoration System(ERS)T&P and other allied material from divisional store to site of work and back carriage of T&P |
| 209 | Average distance upto 40Km |
| 210 | Average distance upto 60Km |
| 211 | Average distance upto 80Km |
| 212 | Average distance upto 200Km |
| 213 | Average distance upto 300 Km |
| 214 | Average distance upto 400 Km |
| 215 | Auto-Transformers/Power Transformers :- A) Checking of Auto starting of fans, External cleaning of radiators,oil pumps, ONAF/OFAF cooling,Cleaning and checking of marshalling boxes of transformer and OLTC, (ii) Tightening of terminations, Checking of OLTC driving mechanism, Electrical checking/ testing of pressure relief device, Buchholz relay, OLTC surge relay/ checking of alarm/ trip and checking/ replacement of the gaskets of the terminal box, Checking / Tightning of earthing connections, Checking of earth resistance of Neutral, Replacement of Silca Gel of breathers and oil toping of transformers and tightning of bushing clamps on HV/IV/LV sides of Auto transformers and Power transformers. Checking of space heater and illumination,etc. required as per schedule of maintenance.B199 |
| 216 | 160 MVA , 220/132 KV |
| 217 | 160 MVA , 220/66 KV |
| 218 | 50 MVA , 220/132 KV |
| 219 | 50 MVA , 132/33 KV |
| 220 | Replacement of Silca Gel of breathers and oil toping of transformers (upto 160MVA). |
| 221 | Routine Maintenance of Auxilliary Transformers including checking of gaskets,checking and tightening of earthing connections,tightening of bushing clamps,replacement of Silica Gel if needede etc |
| 222 | 630KVA, 11/0.433 KV Auxilliary Transformer |
| 223 | 250KVA, 33/0.440 KV Auxilliary Transformer |
| 224 | Draning/ De-sludging of oil of transformers |
| 225 | Filling of oil, filtration and dehydration of transformer including carriage of filteration plant to be provided by the Department. |
| 226 | Reparing of cooling fans of transformers including replacement of damaged winding, bearing etc. |
| 227 | Lifting of top lid of power transformer for complete physical inspection & replacement of gaskets. |
| 228 | Replacement of damaged core bolts/Earthing strip etc. |
| 229 | Testing of Transformer:- |
| 230 | Tandelta testing of bushing/ winding and winding resistance of Transformer. |
| 231 | SFRA testing including arrangement of KIT by successful bidder. |
| 232 | Turn Ratio testing of Transformer. |
| 233 | IR Testing |
| 234 | BDV testing of transformer oil |
| 235 | Low voltage testing: |
| 236 | Magnetic balance test |
| 237 | short circuit test |
| 238 | DGA and PPM of Transformer from accredited laboratories (it include cost of collection of sample from site, its delivery to the testing labortary and depositing back the sampling bottle) |
| 239 | Replacement of damaged/outlived bushing having high tan delta including crane/ mechanical equipment if required. |
| 240 | 220 KV Bushing |
| 241 | 132 KV Bushing |
| 242 | 66 KV Bushing |
| 243 | 33 KV Bushing |
| 244 | 11 KV Bushing |
| 245 | VCB/SF6Checking of gas pressure drop during duty cycle operation check, Checking of auto-starting /pressure switch setting,etc, Checking of operation of safety valve, Cleaning of breaker units, checking of protection equipments and replacement of defective ones, i.e., complete inspection and testing of SF6/MOCB type circuit breakers inclusive of operating mechanism. Checking of driving mechanism, trip/closing circuits/ checking of spring charge motor and checking of tripping and closing coils. checking of equipment earthing and strucure earthing. Maintaning gas levels, venting of circuit breakers, replacement of o-rings , gas kets including circuit breaker analysis by Circuit breaker analyser. Checking of space heater and illumination. Required as per schedule of maintenance |
| 246 | 220KV SF6 Breaker |
| 247 | 132KV SF6 Breaker |
| 248 | 66 KV SF6 Breaker |
| 249 | 33 KV VCB |
| 250 | 11 KV |
| 251 | Installation, testing and commissioning of CT/PT including making connection at secondary winding and in M.K box. |
| 252 | 220 KV |
| 253 | 132 KV |
| 254 | 66 KV |
| 255 | 33 KV |
| 256 | 11 KV |
| 257 | Testing: VCB/MOCB/SF6Testing of SF6/VCB/MOCB type circuit breakers by Circuit breaker analyser Test kit. |
| 258 | 220KV SF6 Breaker |
| 259 | 132KV SF6 Breaker |
| 260 | 66 KV SF6 Breaker |
| 261 | 33 KV VCB |
| 262 | 11 KV |
| 263 | Replacement of damaged/defective pole of the circuit Breaker after thorough inspection. |
| 264 | 220KV SF6 Breaker |
| 265 | 132KV SF6 Breaker |
| 266 | 66 KV SF6 Breaker |
| 267 | 33 KV VCB |
| 268 | 11 KV |
| 269 | Replacement of damaged/defective operating mechanism box of the circuit Breaker after thorough inspection. |
| 270 | 220KV SF6 Breaker |
| 271 | 132KV SF6 Breaker |
| 272 | 66 KV SF6 Breaker |
| 273 | 33 KV VCB |
| 274 | 11 KV |
| 275 | CVT's /CT's /PT's :- Visual checking of earthing HF point (in case it is not being used for PLCC,Checking of any breakage or cracks in porclean insulator, Cleaning of CVT capacitor stacks and tightness of terminal connections,Checking and tightness of all connections including earth connections.Checking of healthiness of gaskets, Checking of neutral earthing in CVT, healthiness of all gaskets and oil level and its topping if needed. Releasing of gas pressure if any. |
| 276 | 220 KV |
| 277 | 132 KV |
| 278 | 66 KV |
| 279 | 33 KV |
| 280 | 11 KV |
| 281 | CVT's /CT's /PT's :- Measurement of IR value and tightening of all connections and droppers. |
| 282 | 220 KV |
| 283 | 132 KV |
| 284 | 66 KV |
| 285 | 33 KV |
| 286 | 11 KV |
| 287 | CVT's /CT's /PT's :- Primary injection test of CT/PT and tightening of all connections and droppers. |
| 288 | 220 KV |
| 289 | 132 KV |
| 290 | 66 KV |
| 291 | 33 KV |
| 292 | 11 KV |
| 293 | Dismantalling of CT/PT including its carriage |
| 294 | 220 KV |
| 295 | 132 KV |
| 296 | 66 KV |
| 297 | 33 KV |
| 298 | 11 KV |
| 299 | Surge Arrestors :-Testing of counters and leakage current meters, Cleaning of insulators, Checking of earth connections between surge arrester,surge monitor and earth, Checking of leakage current after cleaning of porcelain surface, cleaning of LA insulators. Measurement of IR value and tightening of droppers. |
| 300 | 220 KV |
| 301 | 132 KV |
| 302 | 66 KV |
| 303 | 33 KV |
| 304 | 11 KV |
| 305 | Surge Arrestors :-Checking of leakage current(third harmonic resistive current) |
| 306 | 220 KV |
| 307 | 132 KV |
| 308 | 66 KV |
| 309 | 33 KV |
| 310 | 11 KV |
| 311 | Replacement of damaged Surge Arrestor |
| 312 | 220 kV |
| 313 | 132 kV |
| 314 | 66 KV |
| 315 | 33 KV |
| 316 | 11 KV |
| 317 | Isolators :- Checking of moving/fixed contacts, Cleaning of auxiliary switch contacts and greasing with silca grease, cleaning of support insulators, termination contacts, checking of electrical / mechanical interlocks with E/S and CB, mounting bolts, alignment, nuts, pins, auxiliary contacts, alignment of earthing blades, operation of earth switch, almunium / copper flexible conductor, earth connections of structures and MB. lubrication of operating mechanism, hinges lock joints, levers, bearings, main contacts, cleaning of post insulators, tightening of clamps. |
| 318 | 220 kV |
| 319 | 132 kV |
| 320 | 66 KV |
| 321 | 33 KV |
| 322 | 11 KV |
| 323 | Replacement of damaged Isolators. |
| 324 | 220 kV |
| 325 | 132 kV |
| 326 | 66 kV |
| 327 | 33 KV |
| 328 | 11 KV |
| 329 | Reparing of Three phase motors of isolators. |
| 330 | Droppers/JumpersReplacement of damaged / burnt droppers or jumpers of isolators/ breakers/transformers /CT/PT etc.220/132/66/33/11 KV Yard. |
| 331 | Clamp:Replacement of damaged/burnt PG/ PAD/T/CT/Bushing clamp/spacers etc |
| 332 | Post Insulators :- Checking of insulators for cracks and cleaning of insulators. |
| 333 | 220 kV |
| 334 | 132 kV |
| 335 | 66 KV |
| 336 | 33 KV |
| 337 | 11 KV |
| 338 | Post Insulators :- Replacement of damaged/cracked Post Insulators. |
| 339 | 220 kV |
| 340 | 132 kV |
| 341 | 66 KV |
| 342 | 33 KV |
| 343 | 11 KV |
| 344 | Replacement of damaged Disc Insulators when lowering of conductor is necessary. |
| 345 | 220 kV |
| 346 | 132 kV |
| 347 | 66 KV |
| 348 | 33 KV |
| 349 | 11 KV |
| 350 | Replacement of LED in the outdoor switch yard |
| 351 | Replacement of LED/CFL along with fitting in the control room/ division building/office complex |
| 352 | Battery Bank:Checking and cleaning of battery cell terminals, application of petroleum gelly/anti rust spray if required and Checking of positive/Negative earth fault of dc.Terminal tightening. |
| 353 | Battery Bank:conduction of battery impendence test and discharge test checking voltage temperature, current, terminals voltage of individual cells, battery discharge testing etc. |
| 354 | Battery Charger :- Checking of control cards, measurement of test point voltage values, testing of DC earthfault and U/V relays, IR measurement of charger transformer, checking of earthing etc. Checking of charger panel / DCDB for electrical connections, cleanliness etc. |
| 355 | Protection System :- Checking of relays and application of CCl4 for cleaning, replacement of worn out / defunct relays, checking and replacement of control wiring, if required, primary & secondery injection testing,software settings etc. |
| 356 | Cleaning of C&R panels including tightening of connection and replacement of damaged LED lamp or selector switches or SEM or othe meters. |
| 357 | Cleaning of cable trenches/ ducts including disposal of malba outside the premises of Grid Station. |
| 358 | sub main |
| 359 | T-off |
| 360 | Dressing of cables on trays/racks including repairing of trays/racks if required. |
| 361 | sub main |
| 362 | T-off |
| 363 | Repairing of damaged cable duct covers. |
| 364 | sub main |
| 365 | T-off |
| 366 | Gantry Columns and Beams :- Tightening of all nuts / bolts and providing of missing nuts / bolts and replacement of damaged members if required. |
| 367 | 220 kV |
| 368 | 132 kV |
| 369 | 66 KV |
| 370 | 33 KV |
| 371 | L.T. Transformer :-Testing of oil BDV, IR measurement, Testing /checking of OTI,WTI and Buchholz (if provided, Checking of healthiness of Pressure relief diaphragm, Checking healthiness of Buchholz relay. |
| 372 | L.T. Panel:Cleaning of panels,bus bar insulators etc. Relays Testing, Tightning of all electrical connections,Checking of indicating meters ,Check for change-over facility, if provided,Check operation /indications in OFF Load condition of MCCB, |
| 373 | Earthing Mat :- Measurment of earth resistivity, checking of electrical continuity of equipment earthings, tightening of earthing connectors, removal of rust from bolted earth connectors and tightening and additional earthing wherever required. |
| 374 | 220 kV |
| 375 | 132 kV |
| 376 | 66 KV |
| 377 | 33 KV |
| 378 | 220/132 kV Transformer including allied equipment |
| 379 | 220/66 KV Transformer including allied equipment |
| 380 | 132/33 KV Transformer including allied equipment |
| 381 | Replacement/repairing of Earthing of various Equipments. |
| 382 | DC Distribution Board :-Checking of connections, wiring, replacement of wiring if needed and checking of healthiness of all D/C and dc circuits of 220/132/66/33/11 KV yards |
| 383 | AC Distribution Board :-Checking of connections, wiring, replacement of wiring if needed, fuses, MCB, bus bar CT, relays, MFM, LT switchs etc and checking of healthiness of all connections and AC circuits of 220/132/66/33/11 KV yards |
| 384 | Control cables:-Replacement of damaged/outlived/burnt control cables of different cores icluding proper ferruling, thimbling and tagging and finally with all appropriate connections including lifting of duct covers |
| 385 | below 10 core |
| 386 | above 10 core |
| 387 | Marshelling kiosk:-checking and replacing if required of all Terminal blocks, space heaters, light illumination, checking of all connnections and its cleaning. Fixing of cable glands earthing and checking of all other electrical accessories.Fixing of damaged hinges/locks(including their cost if any) if required and plugging of holes if any. |
| 388 | BUS BAR :-Replacement of damaged ACSR Conductor along with its fittings. |
| 389 | 220 KV yard |
| 390 | 132 KV yard |
| 391 | 66 KV yard |
| 392 | 33 KV yard |
| 393 | Automatic voltage regulator:-checking and tightening of connections, auto control unit, oil and its overhaulling |
| 394 | Diesel Generator set: Maintenance and checking of its operation. |
| 395 | Diesel Generator set: overhauling of DG set including all material required for it. |
| 396 | Deweeding of switch yard |
| 397 | Painting of outdoor equipments (Transformers, MK's, CT/PT/CVT, Protection wall, Circuit breaker, isolators, poles etc. |
| 398 | AC/FC Units: Checking and Servicing of Installed AC unit inside control room (1- 3 Ton) |
| 399 | White-Washing of Control Room/Residencial Quarters/Office building at Grid Station. |
| 400 | Upkeep of Sanitary installed in the control room/ office building/division building/residential quarters/Toilets and replacement of any damaged item if required. |
| 401 | Upkeep of electrical accessories installed in the control room/ office building/division building/residential quaters/Toilets and replacement of any damaged item if required. |
| 402 | Store handling: |
| 403 | Unloading / Loading of C&R Panels, in divisional store Bhatindi Including manual Carriage within store yard). |
| 404 | Unloading / Loading of Angle iron, Tor steel , Tower material in divisional store Ambedkar Chowk/Bhatindi Including manual Carriage within store yard). |
| 405 | Unloading / Loading of CT/CVT/PT/CB/LA etc in divisional store Ambedkar Chowk/Bhatindi Including manual Carriage within store yard). |
| 406 | Carriage of T&P and other allied material from divisional store to the site of work and back carriage of T&P |
| 407 | From Divisional Store to Grid Station Barn (Average distance 25 Kms) |
| 408 | From Divisional Store to Grid Station IGC Samba (Average distance 45 Kms) |
| 409 | From Divisional Store to Grid Station Battal-Manwal (Average distance 75 Kms) |
| 410 | From Divisional Store to Grid Station Katra (Average distance 60 Kms) |
| 411 | Sorting, loading, unloading and weight measurement of Iron sorts such as MS angle/flat Tor steel/tower material etc at Divisional store. |
| 412 | Loading and unloading of CT/PT/LA of 220 KV level at Divisional store. |
| 413 | Loading and unloading of CT/PT/LA of 132 KV level at Divisional store. |
| 414 | Loading and unloading of CT/PT/LA of 66 KV level at Divisional store. |
| 415 | Loading and unloading of CT/PT/LA of 33 KV level at Divisional store. |
| 416 | Sorting, loading, unloading and length measurement of ACSR Moose at Divisional store. |
| 417 | Sorting, loading, unloading and length measurement of ACSR Zebra at Divisional store. |
| 418 | Sorting, loading, unloading and length measurement of ACSR Panther at Divisional store. |
| 419 | Sorting, loading, unloading and length measurement of control cable of sorts at Divisional store. |
| 420 | Foundation:-Repairing of damaged foundation/top sealing including material. |
| 421 | Repairing of protection wall(Revetment) including back filling of earth with RR Masonry including material |
| 422 | Providing/Laying of RCC concreating including material. |
| 423 | Repairing of RCC concreating including material. |
| 424 | Earth work in excavation in all kinds of soil |
| 425 | Backfilling of good earth in the tower platform or behind the protection wall whereever required |
| 426 | Removal of rank vegetation/jungle clearance/bush cutting inside the Grid periphery |
| 427 | Cleaning of drains by removing of silt/mulba etc |
| 428 | Repairing of Doors/Windows including material |
| 429 | Repairing of chail link mesh fensing including material |
| 430 | Painting to chain link mest fensing including material |
| 431 | Berm dressing along road inside grid's periphery |
| 432 | Cleanings of water tanks underground/overhead tankies |
| 433 | Repair to plaster whereever required including material |
| 434 | Painting/color washing to walls/doors/windows including material |
| 435 | Repair to sanitary fittings including material |
| 436 | Replacing damaged glass pans including providing fixing same Please Enable Macros to View BoQ information |
| SR No | FileName | File Description |
| 1 | Click here to download tender document | Tender Documents |
| 2 | Click here to download tender document | Tender Documents |
| 3 | Click here to download tender document | Tender Documents |
| 4 | Click here to download tender document | Tender Documents |
Copyright © 2026 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail