| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres in All kinds of soil |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) including material , labour all leads , lifts and carriage of material by MT/HL. |
| 3 | Providing and laying in position specified grade of reinforced cement concrete inclu. curing but excluding the cost of centering, shuttering, finishing & reinforcement. All works upto plinth level 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone agg. 20 mm nominal size) including material , labour all leads , lifts and carriage of material by MT/HL. |
| 4 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more. |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) including material , labour all leads , lifts and carriage of material by MT/HL. |
| 6 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts,struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchors blocks, plain window sills, fillets etcupto floor V level, including curing but excluding the cost of centring, shuttering and finishing with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) including material , labour all leads , lifts and carriage of material by MT/HL. |
| 7 | Centring and shuttering including strutting propping etc and removal of form work |
| 8 | Foundations, footings, bases of columns etc. for mass concrete |
| 9 | Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. |
| 10 | Supplying and laying including digging, carrying by lorry, filling River Bed Material including watering & consolidation in layers to specified lines, camber, grades and cross sections. Finished work including material , labour all leads , lifts and carriage of material by MT/HL. |
| 11 | Hand packing stones in wire crates including the cost of stones and cost of crates. |
| 12 | Providing and laying non-pressure of specified class R.C.C. pipes including collars/spigot jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement: 2 fine sand) including testing of joints etc. complete 900 mm dia. R.C.C. pipe |
| 13 | Engagement of Earth Excavator 75 H.P. for removal of slips in al kinds of soils, clearance of side drain and disposal of same outside the periphery of the area cleared by engaging all tractor / trolly wherever required (all inclusive includingPOL) as per the directions of the Engineer-in-Charge |
| 14 | Dumping stone including cost of stones. in Horizontal on level |
| 15 | providing and fixing 100 mm dia PVC pipe for weep holes |
| 16 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. |
| 17 | carriages of materials by mechinical transport incl. loading, unloading and stacking complete. |
| 18 | Sand for a lead of 3 kms. |
| 19 | stone agg 20 mm nominal size by avg lead of 9 km |
| 20 | stone agg above 40 mm nominal size for an lead of 9 kms |
| 21 | Carriage of stone boulder for an average lead of 2 kms. Please Enable Macros to View BoQ information |