| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres. All kinds of soil |
| 2 | Providing & Laying of Stone Soling tightly hand packed including watering, ramming and all other carriages, complett job |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) |
| 4 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts,struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchors blocks, plain window sills, fillets etcupto floor V level, including curing but excluding the cost of centring, shuttering and finishing with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form for Retaining walls, return walls, walls (any thickness) including attached pilasters buttresses, plinth and string course fillets, kerbs andsteps etc. |
| 6 | Providing and laying of Khak bajri/Nallah mukh including spreading, watering, ramming, compacting with PRR of 8 to 10Tonne capacity including carriage of the same from approved source upto site of work complete. |
| 7 | Providing and fixing of 75mm dia PVC pipe for weep holes all complete. |
| 8 | 12 mm thick cement plaster of mix 1 : 4 ( 1 cement : 4 fine sand) |
| 9 | Carriage of materials by MT from source to site of work including loading unloading complete. |
| 10 | stone Agg. for an avg. lead of 27 Km |
| 11 | sand Agg. for an avg. lead of 35 Km Please Enable Macros to View BoQ information |