| 1 | Repairing the top of the roof Tile Joints in Terrace will be cleaned with Acid wash by Water Jet Wash to remove the Moss, Algae and expired Tile Grout materials In the cleaned Tile Joints, the \\"Fugabella Eco Porcelana\\" (KERAKOL) will be mixed with stone powder for better bonding and will be filled in the Tile Joints to the surface level evenly and will be allowed to dv. After the Tile Joints Grouting gets dried, the Reactive Organosilane Nano Sealer water proofing Chemical \\"Zycosil+\\" & \\"Zycoprime\\" (ZYDEX) will be sprayed to the rich and saturated level as First Coat, after it gets dried, the single component and Stretchable UV durable \\"Elasto Strectch\\" (ZYDEX) Terracotta colour will be applied as Top coat in right to angle directions one after the other after each coat gets duly dried (Tow Coats) total three coats. Also, The identified cracks in the building Exterior walls will be repaired by developing a \\"V\\" groove if it is less than 5 mm and the grooves will be cleaned well without any dust and other particles and the Crack Filling chemicals \\"Nitoseal PU40 or PU50\\" (FOSROC CHEMCIALS) will be filled to the depth possible in the groove to the surface level evenly. |
| 2 | Supplying and laying of Rubber Moulded Hydraulic Pressed Paver Block of 63mm thick over a base layer of crushed stone sandfilling incl. Cost of materials laying and Labour charges etc complete complying with the standard specification and as directed by the departmental officers. |
| 3 | Supplying and fixing of Premium Quality branded European Water Closet with \\"P\\" or \\"S\\" trap and with ISI mark. The cost is include of double flapped PVC seat cover, PVC pipe 110mm dia and all internal fittings and with necessary CI brackets, 12mm brass nipple 15mm dia chromium plated brown headed stop cock of approved quality with ISI mark and nylon connection including fixing the same to wall and giving necessary water supply connection with all internal fittings with labour charges. The European water closet should be fixed on the floor using counter sunk bolts and nuts and necessary teakwood plugs, clamps, screws etc., including dismantling the floor or wall wherever necessary and redoing the same to their original condition etc., complete |
| 4 | Supplying and fixing of Best Quality branded Gem rectangle wash basin with necessary fittings cost includes transportation, labour and other incidental charges etc., complete complying with standard specification and as directed by the departmental officers. (The wash hand basin and specials should be got approved by the Executive Engineer before use on works). |
| 5 | Supplying, laying and jointing UPVC pipes of Class 6 (having working pressure of 12.50 kg/sq.cm) conforming to IS 4985- 2000 of approved quality and best variety of the following dia including cutting and fixing UPVC specials using UPVC adhesives (but excluding cost of such specials) in accordance with IS 7634-3 (2003) and fixing into wall with teak wood plugs, PVC clamps and screws making holes on the wall (or) drilling holes in the roof and making good the dismantled portion to original condition with necessary brick work / cement concrete and plastering neatly wherever necessary with necessary scaffolding charges, etc., complete complying with standard specifications. The PVC pipes shall be got approved by Executive Engineer before use on works - Internal water supply above ground level. |
| 6 | 32 mm dia UPVC pipe |
| 7 | 25 mm dia UPVC pipe |
| 8 | Supplying and fixing in position best quality PVC soil / waste pipes of various dia having 6 kg / sq.cm. pressure BIS mark and providing leak proof joints using PVC adhesives including fixing to the wall with special PVC / MS clamp, teak wood plugs, brass screws, etc., and making connection to all sanitary fittings, dismantling masonry / RCC works wherever found necessary and making the good dismantled portion to the original condition, including testing for any leakages, etc., complete complying with standard specifications. (The PVC pipes should be got approved by the Executive Engineer before use on works). The rate for earth work excavation will be measured and paid separately in the cases where the pipe lines are proposed to laid below ground level |
| 9 | 110 mm dia PVC Soil waste pipe |
| 10 | Painting Old Plastered Wall Surface with Two finishing coats of ready mixed Interior (Emulsion) of approved quality and colour over the existing wall in all floors etc., complete complying with standard specification and as directed by the departmental officers. (The make, quality and colour of paint should be got approved by the Executive Engineer before use on works.) |
| 11 | SUB TOTAL |
| 12 | GST @ 18 % Please Enable Macros to View BoQ information |