|
| 1 | Supplying and painting the walls with two coats of wall putty as instructed by the departmental officers including preparation of surface curing, etc., complete in all floors complying with standard specifications and as directed by the departmental officers. (The wall putty shall be got approved by the Executive Engineer before use of work). |
| 2 | Finishing the top of roof with one course of machine Pressed Tiles of size 230mm x 230mm x 16 mm to 18mm approved quality set in Cement Mortar 1:3 (One Cement and Three Crushed stone Sand) 12mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete complying with standard specification and as directed by the departmental officers. |
| 3 | Supplying and laying of Rubber Moulded Hydraulic Pressed Paver Block of 63mm thick over a base layer of crushed stone sandfilling incl. Cost of materials laying and Labour charges etc complete complying with the standard specification and as directed by the departmental officers. |
| 4 | Supplying and fixing of Premium Quality branded European Water Closet with \\"P\\" or \\"S\\" trap and with ISI mark. The cost is include of double flapped PVC seat cover, PVC pipe 110mm dia and all internal fittings and with necessary CI brackets, 12mm brass nipple 15mm dia chromium plated brown headed stop cock of approved quality with ISI mark and nylon connection including fixing the same to wall and giving necessary water supply connection with all internal fittings with labour charges. The European water closet should be fixed on the floor using counter sunk bolts and nuts and necessary teakwood plugs, clamps, screws etc., including dismantling the floor or wall wherever necessary and redoing the same to their original condition etc., complete |
| 5 | Supplying and fixing of Best Quality branded Gem rectangle wash basin with necessary fittings cost includes transportation, labour and other incidental charges etc., complete complying with standard specification and as directed by the departmental officers. (The wash hand basin and specials should be got approved by the Executive Engineer before use on works). |
| 6 | Supplying, laying and jointing UPVC pipes of Class 6 (having working pressure of 12.50 kg/sq.cm) conforming to IS 4985- 2000 of approved quality and best variety of the following dia including cutting and fixing UPVC specials using UPVC adhesives (but excluding cost of such specials) in accordance with IS 7634-3 (2003) and fixing into wall with teak wood plugs, PVC clamps and screws making holes on the wall (or) drilling holes in the roof and making good the dismantled portion to original condition with necessary brick work / cement concrete and plastering neatly wherever necessary with necessary scaffolding charges, etc., complete complying with standard specifications. The PVC pipes shall be got approved by Executive Engineer before use on works - Internal water supply above ground level. |
| 7 | 32 mm dia UPVC pipe |
| 8 | 25 mm dia UPVC pipe |
| 9 | Supplying and fixing in position best quality PVC soil / waste pipes of various dia having 6 kg / sq.cm. pressure BIS mark and providing leak proof joints using PVC adhesives including fixing to the wall with special PVC / MS clamp, teak wood plugs, brass screws, etc., and making connection to all sanitary fittings, dismantling masonry / RCC works wherever found necessary and making the good dismantled portion to the original condition, including testing for any leakages, etc., complete complying with standard specifications. (The PVC pipes should be got approved by the Executive Engineer before use on works). The rate for earth work excavation will be measured and paid separately in the cases where the pipe lines are proposed to laid below ground level |
| 10 | 160 mm dia PVC Soil waste pipe |
| 11 | 110 mm dia PVC Soil waste pipe |
| 12 | Painting Old Plastered Wall Surface with Two finishing coats of ready mixed Interior (Emulsion) of approved quality and colour over the existing wall in all floors etc., complete complying with standard specification and as directed by the departmental officers. (The make, quality and colour of paint should be got approved by the Executive Engineer before use on works.) |
| 13 | SUB TOTAL |
| 14 | GST @ 18 % Please Enable Macros to View BoQ information |