| 1 | Clearing heavy Jungle and disposing away from site including cost of T&Ps, labour, lead, lift, etc., complete. |
| 2 | Earth work excavating and depositing on bank with initial lead of 10 m & initial lift of 2m in Hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS.20B. |
| 3 | Filling with m.sand for foundation including cost of sand, filling charges, with all leads and lifts, watering, consolidation etc., complete. |
| 4 | Plain cement concrete in CC 1:3:6, using 40mm HBG metal without form work including cost of all materials, labour charges, consolidation, curing, all leads, lifts, as per standard specification etc., complete. |
| 5 | Plain cement concrete in CC 1:2:4, using 20mm HBG metal for foundation including cost of all materials, labour charges, consolidation, curing, lead, lift, etc., complete (but excluding cost of reinforcement). |
| 6 | Plain cement concrete in CC 1:2:4, using 10 - 20mm HBG metal with form work including cost of all materials, labour charges, consolidation, curing, all leads, lifts, as per standard specification etc., complete. |
| 7 | Providing steel reinforcement with MS/RTS rods of reputed approved make for reinforced concrete works, including cost of steel MS/RTS rods, binding wire, minor T&Ps labour charges for cutting, straightening bending as per type design drawing, placing aligning and tying properly with all leads and lift etc., complete as per standard specification. |
| 8 | Supplying and fixing in position GI angle 75x75x6mm and 65x65x6mm for corner/ intermediate fence post with 2nos. of 30mm length cleats of size 45x45x6mm angle and back support of 50x6mm GI flats, including cost of all materials, transporting, labour, Galvanising, welding and cutting charges, lead and lift etc., complete and placing in position as directed by Site Engineer. |
| 9 | Supplying and fixing of Chain link fencing 2\\"x2\\" using 10 gauge GI Wire of approved quality including cost of all materials, labour charges, lead, lift, etc., complete as per standard specification. |
| 10 | SGST to be quoted in Percentage (value alone) Ex. 9%, it should be entered as 9 only |
| 11 | CGST to be quoted in Percentage (value alone) Ex. 9%, it should be entered as 9 only |
| 12 | Inter-state GST @18% for other than Tamil Nadu supplier. If the contractor is within Tamil Nadu may be quoted as \\"0\\" only Please Enable Macros to View BoQ information |