| 1 | Earth work excavation for foundation in all kinds of soils and sub soils to full depth as directed by the departmental officers except hard rock inclusive of shoring strutting and balling out water wherever necessary and refilling the sides of foundation with excavated earth in layers of 15cm thick well rammed and consolidated and depositing the surplus earth with in the compound in places shown by the departmental officers with initial lead of 10 meters and initial lift of 2 meters including cost of all labour charges etc., complete as per standard specification 23 & 24 VI (S2) VII.9,10 |
| 2 | Cement concrete in 1:4:8[one cement and fore sand and eight aggregate ] using 40 mm size ISS grade machine crushed chips including the cost of mixinglaying curing etc., complete complying with standard specification. |
| 3 | Random rubble masonry in cement motor 1:5 (one Part of cement, Five part of Crushed Stone Sand (M- Sand)) mix using all granite stones and bond stones for foundation and basement from approved quarry including watering, curing, and labour charges etc., completed as per standard specification |
| 4 | Supplying and erecting centering to sides and soffits including supports and strutting for drainage sides and culvert body wall sides using 90cm x 60cm and B.G 10stifened with welded mild steel angles of size 25mm x 25mm x 3mm for boarding laid over( silver oak joists ) of size 10cm x 6.50cm spread at about 90cm etc. complete complying with standard specification . |
| 5 | Plinth |
| 6 | Providing and laying in position Standardised Concrete Mix M-20 Grade in accordance with IS 456 - 2000 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement contenet of 325Kg/ cum and maximum water cement ratio of 0.55 including admixture (Plasticiser / super plasticiser) in recommended proportions as per IS 9103 to accelerate, related setting of concrete, improve workability without imparing strength and durability with about (5.0cum), 7730Kg of 20mm machine crushed stone jelly and with about (3.3 cum), 5156kg of 10 - 12mm machine crushed stone jelly and with about (4.79cum) 7670 kg of Crushed Stone Sand (M- Sand), but excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary without claiming extra cost etc., complete complying with standard specification and as directed by the departmental officers - |
| 7 | Supplying and Fabricating and placing in position MS steel or ribbed for steel for all reinforced cement concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification. |
| 8 | Brick work in CM 1:5 (one cement & five sand) using III class country bricks of size 8 3/4\\"X4 1/4\\" X 2 3/4\\" including finishing, curing, etc., complete complying with standard specification - 100CFT |
| 9 | Plastering in cement mortar 1:5 mix 12mm thick using clean screened sand and including cost of curing for fifteen days from the completion of the work and surface should free from undulations and including the cost of preparing the surface for plastering and protecting for plastering for plastering and protecting from other damages till setting of mortar etc.complete complying with standard specification--10m2 |
| 10 | Paving the floor with design Antiskirt ceramic tiles (colour and shade as directed) of size 305 mm x 305mm x 6 mm in all floors over a base layer of cement mortar 1:3 (One part of Cement and Three part of Plastering Sand (P- Sand)), 20mm thick laid in-situ and pointed with same coloured cement |
| 11 | Dadooing walls with Glazed tiles of sizes 305mm X 200mm X 6mm size of approved make and quality and colour Set in cement mortar 1:2 (One part of Cement and two part of Plastering Sand (P- Sand)) over 10 mm base layer plastering and pointing with white cement neatly as directed. |
| 12 | R.C.C.Jolly by a new of following size in M20 Concrete using 20mm gauge hard broken granite stone jelly and river sand excluding cost of reinforcement but includingcharges,fabrication charges curing neat finishing and labour charges for fixing the jolly in position with standard spefication |
| 13 | STEEL DOOR WITH FRAME (SINGLE LEAF) |
| 14 | Painting two coats of newly plastered wall surface with ready mixed Cement paint of first quality and of approved colour over a priming coat including preparing the surface, clean removal of dirt and including necessary plaster of paris putty wherever required etc., complete complying with standard specification. |
| 15 | Painting two coats with Ready Mixed Enamel Paint over the new iron works of approved quality and colour without priming coat including the cost all materials etc.,complete, in all floors. |
| 16 | Fabricating supplying and fixing of pre painted galvanium colour sheets with the following specification. The materials should be of PPGI tile profile with a red colour or any other approved design 0.47 mm thick 24 guage having width 1050 mm. The sheet should be G.I.base pre painted hot dipped galvanized iron sheet and to be fixed with shelf tapping screws,plastic washer.The washer and screws to be fixed by using minute power machine drilled with out damaging the sheets paint coating to be regular modified polyster coat with zinc coating of Z 120 GSM paint thickness the finish should be terra cotta finish like malabar mangalore tiles finish optional matt finish. The sheet to be fixed with making suitable corrugated,cutting the sheet in to the required ssize and making ornamental designs as per the site condition and as directed by the departmental officers. |
| 17 | Supplying, fabricating, erecting structural steel work for roofing welded or bolted type using MS channels, angles, plates and round bars etc. conforming to IS specification including primer coating and enamal painting as per Design given by the departmental officers etc, complete as per standard specification Please Enable Macros to View BoQ information |