| 1 | Earth work excavation for pipe line work having width 0.6m and depth 1.05m for 40mm to 110mm dia PVC / HDPE Pipe including labour cost and all other cost and conveyance etc, complete.As per SOR Vol - 2 Pg No - 212 |
| 2 | Earth work excavation for pipe line work having width 0.6m and depth 1.05m for 160mm dia PVC / HDPE Pipe including labour cost and all other cost and conveyance etc, complete.As per SOR Vol - 2 Pg No - 212 |
| 3 | Supply and fixing of followings HDPE Pipes and specials |
| 4 | 110mm dia HDPE Pipe (PN 6).As per SOR Vol - 2 Pg No - 16 |
| 5 | 110mm dia HDPE Bend (PN 6) As per SOR VOL 2 - 2025-26 Pg no 20 |
| 6 | 110mm dia HDPE Tee (PN 6) As per SOR VOL 2 - 2025-26 Pg no 20 |
| 7 | 110mm diameter - GI Flange As per SOR VOL 2 - 2025-26 Pg no 36 |
| 8 | Supply and fixing of followings HDPE Pipes and specials |
| 9 | 160mm dia HDPE Pipe (PN 6) As per SOR VOL 2 - 2025-26 Pg no 14 |
| 10 | 160mm dia HDPE Bend (PN 6) As per SOR VOL 2 - 2025-26 Pg no 20 |
| 11 | 160mm dia HDPE Tee (PN 6) As per SOR VOL 2 - 2025-26 Pg no 20 |
| 12 | Lowering 110mm dia HDPE pipes and specials to trench and laying to proper grade and alignment and as directed by the TWAD Officers As per SOR VOL 2 - 2025-26 Pg no 192 |
| 13 | Lowering 160mm dia HDPE pipes and specials to trench and laying to proper grade and alignment and as directed by the TWAD Officers As per SOR VOL 2 - 2025-26 Pg no 192 |
| 14 | Jointing 110mm dia HDPE Pipes and Specials by butt fusion welding / electro fusion welding joints using fusion equipment as per ISO 21307-2011 and as per IS 7634 (part-2) : 2012 including cost of hire charges for butt fusion equipment power supply arrangements etc., complete as per directed by TWAD Board OfficersAs per SOR VOL 2 - 2025-26 Pg no 212 |
| 15 | Jointing 160mm dia HDPE Pipes and Specials by butt fusion welding / electro fusion welding joints using fusion equipment as per ISO 21307-2011 and as per IS 7634 (part-2) : 2012 including cost of hire charges for butt fusion equipment power supply arrangements etc., complete as per directed by TWAD Board OfficersAs per SOR VOL 2 - 2025-26 Pg no 204 |
| 16 | Refilling the excavated earth for pipe line work having width 0.6m and depth 1.05m for 40mm to 110mm dia PVC / HDPE Pipe including labour cost and all other cost and conveyance etc, complete. As per SOR Vol - 2 2025-26 Pg no 192 |
| 17 | Refilling the excavated earth for pipe line work having width 0.6m and depth 1.05m for 160mm dia PVC / HDPE Pipe including labour cost and all other cost and conveyance etc, complete. As per SOR Vol - 2 2025-26 Pg no 192 |
| 18 | Supply and errection of sluice valve (Flanged type) including shipping charges labour cost etc complete As per SOR VOL 2 - 2025-26 Pg no 68 |
| 19 | 100mm dia |
| 20 | Testing of pipes for water supply with hydraulic testing equipment by filling with water (including cost of water) and testing to recommended pressure in convenient stretches and attending the bursts if any occured during the test, excluding the cost of pipes but including other incidential and operational charges etc., complete for the following diametres of pipes. Please Enable Macros to View BoQ information |