| 1 | Earth work excavation in all classes of soils such as hard stiff clay, stiff black cotton, hard red earth, shales, murram, ordinary earth, earth mix with 50% fair sized boulders etc., with initial lead and lifts including laying, spreading, leveling, sectioning breaking clods etc., including all incidental charges etc., complete as per standard specification . for Foundations SS 20B TNDSS NO. 23 &24 V, VI (S2) VI 9 |
| 2 | Supply filling of M-Sand in layer of not more than 15 cm thick including watering with all layers and consolidation complying with standard specification including cost and conveyence of sand to Site and all labour charges and all other incidential charges etc,. complete as per Standard Specification TNDSS NO. 24 &25 NBC Part VI (S2) 8 |
| 3 | Plain Cement concrete of mix 1:4:8 (One cement four M-sand and eight aggregates) using 40mm gauge hard broken including cost conveyance of all materials to site including labour charges, transporting and placing in position including shoring, strutting forming protective bunds, cofferdams bailing out of water labour for mixing compacting, finishing and curing, working at depths, tools and plants and incidental charges such as sheeting, shoring and bracing and their subsequent removal etc., complete as per standard specification. TNDSS NO.28 V,VI S25 |
| 4 | PCC Cement concrete 1:2:4 (One cement one point five M-sand and three aggregates) mix using 20mm gauge hard granite broken stone jelly in all RCC works connected to the work excluding shuttering , Centering and cost of Reinforcement grills but including curing ,finishing etc complete with standard specification and as directed by Engineer incharge. TNDSS NO. 28 V,VI S25 |
| 5 | Casting of precast cement concrete post of size 15 x 15 x 2400mm in Reinforced cement concrete of mix 1:1 1/2:3 ( One cement one and half sand and three aggregate) using 20mm size hard broken stone jelly, Including fabrication of steel and mixing the concrete and laying the concrete in steel moulds after oiling them properly at casing yard and vibrating finishing the top surface smoothy placing the slab along with mould and plate in the casting yard removing the mould carefully after initial setting, Placing the slab in the curing bond after 24 hours from the time of casting, removing them from the curing pond after 7days of curing, stacking them in the stacking yard with in a lead of 100m and curing them from the full period by sprinking water as directed by the departmental Officers. |
| 6 | Supplying and Fixing of Chain link-2\\"x2\\" using 10 Gauge Galvanised Iron wires (Of all sizes) for fencing cost including all material, binding wire and labour charges etc. complete as per Standard specification and as directed by the departmental officers.For 10M2 |
| 7 | Supply and fixing of Grill gate ect; completed as per standard specification. |
| 8 | GST 18% Please Enable Macros to View BoQ information |