|
| 1 | 1.Improvements to swimming pool at District Sports centre in Tiruvallur District |
| 2 | Dismantling, clearing away and carefully stacking materials useful for re-use for any thickness of Walls Floor finish & dadooing Walls in cement mortar with Mosaic Tiles / Glazed Tiles / Clay Tiles / Cuddapah Slabs One Course of Pressed Tile Roof finish in cement mortar |
| 3 | Flooring with following water proofing swimming pool tiles of size 305 x 305 x 6 mm laid over 20 mm thick cement mortar 1:3 (One Cement and Three M.Sand) base mortar over the existing slab / floor including cutting the tiles to the required size with special cutter wherever necessary, laying in position and pointing with white cement mixed with colouring pigment at the rate of 0.3 Kg. / sq.m. etc., complete complying with standard specification. (The make and brand of the tiles should be got approved by Executive Engineer before use on works) |
| 4 | Supplying and filling in foundation, basement, etc with filling M.Sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. |
| 5 | Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification |
| 6 | Supply and errecting for centering including cost and conveyance and labour charges with materials charges with MS sheet completed.. |
| 7 | Supply and Fabrication of steel including cost and conveyance of all materials to site and all labour charges for placing in position etc,..completed.. |
| 8 | RCC 1:1.5:3 Mix (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers |
| 9 | Provision for Swimming Pool New ladders to be fixied with SS 304 |
| 10 | 5 Step Ladder |
| 11 | 4 Step ladder |
| 12 | Manufacturing, Supplying and Fixing of Stainless Steel Hand rails for staircase near wet riser using 50mm dia 304L Grade Stainless Steel pipe of 1.60mm thick will be provided with tubular supports made of 304L Grade Stainless Steel pipe of 25mm dia of 1.60mm thick welded to the railing. The supports will be grouted into the Wall and provided with 93.00mm thick Stainless Steel circular base plate of 304 Grade. The rate shall included for grouting into concrete with necessary supporting arrangements the hand rail in floor polishing buffing, bonding, cutting, grinding, conveyance, welding charges, electrical charges, etc. complete (as per SOR 25-26 M-0652) |
| 13 | Provisions For Drain Grill ABS Plastic for Draining water including all cost and convienace and labour charges asper standard spcification asper directed by the departmental officers and issued instruction time to time at site etc., completed |
| 14 | Providing For Plumbing, Painting and Whitewash worksa. 30 mtr Nylon suction hose b. with 50 floating balls (for suction pipe)c. 5 Numbers of 27 mtr. kayer rope ( 2 coil)d. 3 mm rope for fixing the ball (90 mtr)e. 120 floating balls for lane patrician rope, f. Plumbing components and fittings for bathrooms ( taps, Shower, urinal hoses, connections and other fittings)g. Overall whitewash, paint and Painting works with labour charges (Bathroom, Motor room, Office room) with labour charges (minimum 10 days) h. 2 Butterfly valves i. Filtration Unit and Filtration sand and Stone with labour charges ( 2 types of sand, filtration stones 2 types)including all cost and convienace and labour charges asper standard spcification asper directed by the departmental officers and issued instruction time to time at site etc., completed |
| 15 | GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column \\"BB\\" for all works in this package}(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) Please Enable Macros to View BoQ information |