| 1 | 1.Construction of Cremation Shed at Thandavagounderkadu mayanam in Thethakudi South Panchayat. - Earthwork excavation for foundation in all soils and sub-soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring, strutting and baling out water wherever necessary |
| 2 | Cement concrete 1:4:8 mix (one cement five sand and ten hard broken stone) using 40mm ISSHBG metal for foundation, etc. Completeas per specification and as direceted TNBP SS NO. 28 |
| 3 | Reinforced Cement concrete 1:1.5:3 mix using 20mm ISSHBG metal from approved sources including cost and conveyance of all materials to work site and all labour charges for mixing, laying, and watering etc., complete. Upto basement |
| 4 | Reinforced Cement concrete 1:1.5:3 mix using 20mm ISSHBG metal from approved sources including cost and conveyance of all materials to work site and all labour charges for mixing, laying, and watering etc., complete. Above basement |
| 5 | Brickwork in CM 1:5 mix using country bricks of standard size including cost and conveyance of all materials to work site and including all labour charges and all incidential charges etc., complete. Upto basement |
| 6 | Brickwork in CM 1:5 mix using country bricks of standard size including cost and conveyance of all materials to work site and including all labour charges and all incidential charges etc., complete. For Superstruture. |
| 7 | Special ceiling plastering in CM 1:3 –10mm thick including cost and conveyance of all materials and all labour charges etc., complete. |
| 8 | Plastering in CM 1:5 ,12mm thick including cost and conveyance of all materials to work site and all labour charges etc., complete. |
| 9 | Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including cost etc., complete. |
| 10 | Finishing the top of roof with one course of Machine pressed tiles of size 23x23x2cm in 1:3 12mm thick using WCC |
| 11 | Supplying and erriecting, centring for plane surfaces structures such as RCC slab, beam etc., inlcuding strutting upto 3m height u etc., complete complying with standard specifications 10 m2 Shuttering. |
| 12 | Supplying and erriecting, centring for plane surfaces structures such as RCC slab, beam etc., inlcuding strutting upto 3m height u etc., complete complying with standard specifications 10 m2 Centering |
| 13 | Supply and fabrication of steel including cost and conveyance of steels to worksite including labour for cutting, jointing and welding if necessary including all labour charges for dying with binding wire etc., complete. |
| 14 | Cement concrete 1:2:4 mix using 20mm ISSHBG metal from approved sources including cost and conveyance of all materials to work site and all labour charges for mixing, laying, and watering etc., complete. |
| 15 | CC Road - Earthwork excavation in all classes of soils and depositing on bank with an initial lead and lift such as sand or other loose soil, wet sand not under water silt and ordinary soil, sandy loom, and hard stiff, black cotton soil, red earth, earth mixed with 50% fair sized boulders including all labour charges etc., complete for foundation. |
| 16 | CC 1:4 :8 mix using 40mm ISSHBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying, Compacting and watering etc., complete. |
| 17 | Cement Concrete 1:3:6 (One Cement, Three M.Sand and Six broken stone jelly) using 20mm size hard broken stone jelly for dummy columns, excluding cost of centering shuttering including all charges etc., complete. |
| 18 | Cement Concrete 1:2:4 (One Cement, Three M.Sand and Six broken stone jelly) using 20mm size hard broken stone jelly for dummy columns, excluding cost of centering shuttering including all charges etc., complete. |
| 19 | Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and all labour charges etc., complete. |
| 20 | Providing Bitumen Felt 15 mm thick pad |
| 21 | Provision for Name Board charges |
| 22 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \\"BB\\" for all works in this package} 18% for other than Earth Quantity Please Enable Macros to View BoQ information |