|
| 1 | Restoration of rain cuts with soil, moorum gravel or amixture of these,clearing the loose soil, benching for 300mm width laying fresh material in layers not exceeding 250 mm and compaction with plate compactor or power rammer to restore the original alignment, level and slopes as per drawings and MoRD specifications Clause 1902 Mechanical Means |
| 2 | T05-AR Biyapada to Reganiya of 0/0 to 6/250 |
| 3 | Repair to pot holes and removal of loose material, trimming of sides, cleaning of surface by providing tack coat, 20 mm thick pre-mix carpet and seal coat type B as per MoRD specification Clause 1904.2 |
| 4 | T05-AR Biyapada to Reganiya of 0/0 to 6/250 of package no RJ-03-P3-11. |
| 5 | Maintenance of road signs by way of cleaning and repainting of mandatory /requlatory / cautionary / informatory and place identifications sign board as perdrawings and MoRD specification Clause 1911 |
| 6 | T05-AR Biyapada to Reganiya of 0/0 to 6/250 of package no RJ-03-P3-11. |
| 7 | Trimming of grass and weeds from the shoulders/berms and disposing off the same to suitable locations as per MoRD specifications Clause 1915 |
| 8 | T05-AR Biyapada to Reganiya of 0/0 to 6/250 of package no RJ-03-P3-11. |
| 9 | White washing two coats on parapet walls and tree trunks including preparation of surface by cleaning scraping etc. as per MoRD specifications Clause 1916 |
| 10 | T05-AR Biyapada to Reganiya of 0/0 to 6/250 of package no RJ-03-P3-11. |
| 11 | Marking Centre Line and stop lines etc. on road as per IRC pattern with thermoplastic paint of approved quality and make with 8% glass beads laid on the road surface at temperature 160\\" C with a special applicator machine complete with a special applicator machine complete with labour material and traffic diversion arrangements. |
| 12 | T05-AR Biyapada to Reganiya of 0/0 to 6/250 of package no RJ-03-P3-11. |
| 13 | Painting two coats including prime coat with epoxy paint of approved brand on concrete/steel surfaces after through cleaning of surface to give an even shade as per drawing and MoRD Specification Clause 1701 |
| 14 | T05-AR Biyapada to Reganiya of 0/0 to 6/250 of package no RJ-03-P3-11. |
| 15 | Maintenance of Hume pipe Culvert by way of Clearing, Cleaning, Erosion repair, repairs to cracks, parapet wall and protection work as per drawing and MoRD specification Clause 1909 |
| 16 | T05-AR Biyapada to Reganiya of 0/0 to 6/250 of package no RJ-03-P3-11. Please Enable Macros to View BoQ information |