| 1 | Dismantlling and removing cement concrete including stacking the useful materials for re-use and removing the debries within 50mtr lead. (Data for 1 Cum) |
| 2 | Earth work excavation in hard soil for foundation within initial lead of 50 m and initial lift of 1.5 m including rough dressing and levelling the bed as per the specification approved by the department and direction of Engg -in- charge. |
| 3 | Filling in foundation with sand well watered & rammed including cost, conveyance, royalty & taxes etc. complete of all materials to work site as the specification approved by the department and direction of Engg-in-charge. |
| 4 | Labour for laying sub- base in layers not exceeding 100 mm watering and compacting to required density in OMC with P.R.R but excluding costs, conveyance of sub-base materials. |
| 5 | P.C:C: (1:4:8) using 4 cm. size H.G. (H.B) metal including all cost, conveyance,royalty & taxes etc complete of all materials to work site as per specification approved by the department & direction of Engg-in-charge |
| 6 | R.C.C. work of M25 grade with 20 mm down graded chips (C.B.) including hoisting & laying etc compete of all materials to work site as per specification approved by the department & direction of Engg-in-charge. |
| 7 | Supplying fitting placinguncoated HYSD reinforcecement,including, cutting bending, binding ,& placing, the steal rods as per drawing technical speci fications with cost of binding wire 18 to 20 gauges etc complete. |
| 8 | Providing 6 mm thick cement plaster in CM (1:4) to the walls, watering & curing the same including cost, coveyance, royalties, taxes of all materials and cost of all labour T & p, sundries etc all complete as per the specification and direction of Engineer-in-charge. |
| 9 | Rigid smooth centering and shuttering for concrete work. Dismantling after laying concrete etc. complete |
| 10 | C:C: M-25 using 12mm to 20mm size H.G. stone chips including all cost, conveyance,royalty & taxes etc complete of all materials to work site as per specification approved by the department & direction of Engg-in-charge |
| 11 | Providing and Laying Factory made Chamfered edge Cement Concrete Paver Bliocks of required strength, thickness & size/shape made by table Vibratory method , to attain superior smoth finish using PU or Equivalent moulds ,Laid in required gray colour and Pattern over 50mm thick Compacted bed of coarse sand , copmacting and proper embedding / laying of interlocking Paver Blocks into the sand bedding layer through vibratory compaction by using plate vibrator, Filling joints with Fine sand and cutting of Paver blocks as per required size/Pattern, finishing and sweeping extra sand in footpath , parks, lawns, drive ways, or light traffic parking and Lanes/Road etc, all complete as Per Manufacturers Specifications and Driection of Engg -In -Charge. 80mmm thick C.C. Paver Blocks of M-35 grade With approved colour design Pattern etc. complete. |
| 12 | Convaying the Exacavated Earth away from the work site by mechnical means with in 5 km lead as per direction of EIC |
| 13 | Cost of RCPC cover slab |
| 14 | Display Board |
| 15 | labour charges for shifting RCC coverslab in proper position etc complete Please Enable Macros to View BoQ information |