| 1 | Earth work excavation in Hard soil using one cum Bucket Hydraluc Excavator with all leads and lifts and transpotation of ecavated matiral by mechcanical means. and direction of Engg -in- charge |
| 2 | Supply and filling in foundation and plinth with river sand, in layers including watering, with cost, conveyance, royalties, and taxes of all materials, cost of all labour, carriage of water, sundries T & p required for the work etc all complete as per the specification & direction of E-I-C |
| 3 | PCC in prop. (1:3:6) in foundation and bed using 4 cm size h.g C.B metal of approved quality and approved quarry including hoisting, lowering, laying concrete and compacting the same to required level, with compaction, watering and curing including cost, conveyance, royalties and taxes of all materials with cost of all labours, sundries and T & p such as hire charges of concrete mixer, concrete vibrator required for the work etc complete as per the specification and direction of EI-C |
| 4 | RCC M-25 using 12 mm & 20 mm size c.b.h.g chips of approved quality from approved quarry including hoisting, lowering and laying concrete, watering & curing, finishing the exposed surface smooth, providing grooves or beads where necessary including cost, conveyance, royalties, taxes of all materials and cost of all labour T & P, such as concrete mixer, concrete vibrator etc all complete as per the specification and direction of Engineer-in-charge. Column Base |
| 5 | Plinth |
| 6 | Lintel |
| 7 | 1st floor |
| 8 | Column & Beam |
| 9 | 1st floor |
| 10 | Roof Slab |
| 11 | 1st floor |
| 12 | Staircase |
| 13 | Cutting, straightening, coiled on bent up MS rod or tor steel, welding or jointing if necessary including bending, binding, tying the steel rod as required for RCC work including hoisting, lowering and placing in proper position according to approved design and drawing, including cost, conveyance, loading, unloading, taxes of MS rod or tor steel of binding wires of 18 to 20 gauge required for the works and cost of all labour and sundries T & P and scafolding all complete a per the specification and direction of E-I-C |
| 14 | 1st floor |
| 15 | First class Fly Ash brick work in cement mortar (1:4) in Foundation & Plinth with best quality bricks having crushing strength from 75kg/cm2 to 99kg/cm2, immersing the bricks in water for not less than 6 hours before use (the bricks shall be well burnt, free from cracks, well shaped, uniform in size and shall produce a clear metallic ringing sound when struck) includes moulding, chamfering, corbelling etc. complete as per drawing, design and specification, watering and curing for 7 days including cost, conveyance, royalty and taxes of all materials, labour, T&P etc. and as per direction of Engineer-in-charge. |
| 16 | First class Fly Ash brick work in cement mortar (1:6) Superstructure with best quality bricks having crushing strength from 75kg/cm2 to 99kg/cm2, immersing the bricks in water for not less than 6 hours before use (the bricks shall be well burnt, free from cracks, well shaped, uniform in size and shall produce a clear metallic ringing sound when struck) includes moulding, chamfering, corbelling etc. complete as per drawing, design and specification, watering and curing for 7 days including cost, conveyance, royalty and taxes of all materials, labour, T&P etc. and as per direction of Engineer-in-charge. |
| 17 | 1st Floor |
| 18 | C:C: (1:2:4) using 12 mm to 20 mm size H.G. stone chips including the cost of all materials labour carriage, royalty etc complete. |
| 19 | 16mm thick C:P (1:6) over brick & stone masonry works including closed deep chipping & slurry treatment including watering, curing, cost, carriage, royalty and taxes of all materials, cost of all labour, T&P etc complete as per the direction of E.I.C |
| 20 | 1st Floor |
| 21 | 12mm thick C.P. in C.M.(1:4) over Brick Masonery works including closed deep chipping & slurry treatment including watering, curing, cost, carriage, royalty and taxes of all materials, cost of all labour, T&P etc complete as per the direction of E.I.C. |
| 22 | 1st Floor |
| 23 | Providing 6 mm thick cement plaster in CM (1:4) with neat cement punning over RCC surface finished smooth to the walls, watering & curing the same including cost, coveyance, royalties, taxes of all materials and cost of all labour T & p, sundries etc all complete as per the specification and direction of Engineer-in-charge. |
| 24 | 1st Floor |
| 25 | Cement wash 1coats over plastered surrface including all cost conveyance taxes and as per the direction of EIC etc complete |
| 26 | 1st Floor |
| 27 | Painting two coats with weather seal coat over a coat of water bound wall primer including cost of all materials,labour,T & P sundries etc complete as per direction of Engineer- in-charge. |
| 28 | 1st Floor |
| 29 | Providing fitting fixing of M.S Grill over Compound wall including supply of necessary required materials complete etc at work site etc complete |
| 30 | 1st Floor |
| 31 | Supplying fitting fixing of Stainless Steel of Grade 304 in hand Railling etc all complete. |
| 32 | Painting two coat over a coat of primer on new iron work with cost of primer and paint including all cost, taxes , labour T & P etc. |
| 33 | 1st Floor |
| 34 | Supplyuing applying Add mixture of Waterbound Component for Leak Proof. |
| 35 | Fixing of vetrified tiles in floors, treads or steps and landing over 25mm bed of C:M (1:1) jointed with neat cement slurry mixed with pigment to match the shade of the tiles including rubbing and polishing complete including the cost of vetrifid tiles etc complete as per the direction of EIC. 1st floor Please Enable Macros to View BoQ information |