| 1 | \\" Estimate for Shifting and Erection of 11 KV LT Line,DSS & LT Line due to widening of Road by R & B D ivision ,Nabarangpur for improvement of Dabugam Main Road to Angi River Bridge from Gandhi Park to Police Station under ESO Dabugam. |
| 2 | SCOPE OF THE WORK- Estimate for Shifting and erection of 11 kV Line in Road Widening Work 1. 17 Nos of 11 Mtr Long WPB Pole on 11 kV Line with 55 Sqmm AAAC = 0.6 Ckm. ( From A-C-D ).2. Dismentaling of existing HT Pole = 17 Nos 11 Mtr Long Joist Pole & HT Line 0.25 Ckm . |
| 3 | S/F of 11 Mtr Long WPB Pole of 160x152 mm With Welded Base Plate |
| 4 | S/F of 11 KV V Cross Arm( 10.2 Kg each) |
| 5 | S/F of Back Clamp for 11 KV \\"V \\"Cross Arm( 13 nos of Pin Point Poles |
| 6 | S/F of 11 KV F-clamp 2.9 Kg each |
| 7 | S/F of 11 KV Pin Insulator polymer |
| 8 | S/F of Disc insulator (B&S)70 KN polymer |
| 9 | S/F of H W fitting (B& S) 70KN(3bolted) |
| 10 | S/F of Earthing device / Support Coil type (GI) |
| 11 | S/F of No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr. For connecting pole with Coil earthing |
| 12 | S/F of GI Nuts &Bolts of Assorted size |
| 13 | S/F of 55mm2 All Alloy Aluminum Conductor.AAAC |
| 14 | S/F of PG Clamp for 55 Sqmm AAAC |
| 15 | S/F of 100x50x6 mm channel for straight Cross arm 1.2 mtr Long for Bottom Channel & 0.206Mtr Long for Top Channel . |
| 16 | S/F of HT Stay Set Complete . |
| 17 | S/F of 11 KV Stay insulator |
| 18 | S/F of HT Stay Clamp(1.9 Kg/Pair) |
| 19 | S/F of 7/8 SWG G.I. Stay wire |
| 20 | S/F of Danger Board |
| 21 | S/F of Back Clamp for Danger Board (25X3mm GI Earth Flat ,0.59Kg/Mtr & 0.51Mtr for Each Back Clamp. |
| 22 | S/F of ANTICLIMBING DEVICE / Barbed wire (3 KG per supprot ) |
| 23 | S/F of Back Clamp for ACD (25X3mm GI Earth Flat ,0.59Kg/Mtr & 0.51Mtr for Each Back Clamp. |
| 24 | S/F of Fish Plate for DP (50x8mm of Flat ,0.97Kg/Mtr & 0.28Mtr Long for Each ) |
| 25 | S/F of Black paint |
| 26 | S/F of Yellow Paint |
| 27 | Saundries(paint,binding tape ,etc) |
| 28 | CIVIL ITEMS |
| 29 | Concreting ratio 1:1.5:3 (500mmX500mmX1500mm) = 0.45Cu.mtr |
| 30 | Couping ratio 1:1.5:3 with dimension ( 500X500X450)= 0.1125 Cu mtr |
| 31 | Cement concreting for stay anchor plate with C.C. 1:2:4, 0.2 Cum @ 6177.92/- |
| 32 | Survey of incremental/delta network and asset changes of 11KV network and updation in GESW databas |
| 33 | Dismantling charges of existing HT poles |
| 34 | Dismantling charges of existing HT Line |
| 35 | \\" Estimate for Shifting and Erection of 11 KV Line,DSS & LT Line due to widening of Road by R & B Division ,Nabarangpur for improvement of Dabugam Main Road to Angi River Bridge from River Bridge from Gandhi Park to Police Station under under ESO Dabugam. |
| 36 | SCOPE OF THE WORK- Estimate for Shifting and erection of 11 kV Line in Road Widening Work 1. 11KV Line through UG arrangement using 3Cx 300 mm2,11 KV XLPE Cable (Armoured),XLPE Cable with spare (40 Mtr+18 Mtr for raising+12 Mtr for looping)=2 Run X70 Mtr=140 Mtrx2=280 Mtr . 2. Proposed HDPE Pipe 8\\",10mtr,200mmDia for laying UG Cable(40 Mtr for UG+ 18 Mtr for raising)=2 RunX58 Mtr=116 Mtrx2=232 Mtr . 3. 04 Nos 11 KV Line DP using 11 Mtr Long WPB Pole for UG Cable Riser at 04 Nos Location .4. 11 KV Line using 55 Sqmm AAAC Conductor = 0.06 Ckmx2=0.12C Km . |
| 37 | S/F of 11 Mtr Long WPB GI Pole of 160x152 mm with welded Base Plate |
| 38 | S/F of Earthing device / Support Coil type (GI) |
| 39 | S/F of No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr. For connecting pole with Coil earthing |
| 40 | S/F of Disc insulator (B&S)70 KN polymer |
| 41 | S/F of H W fitting (B& S) 70KN(3bolted) |
| 42 | S/F of Pressure channel 100X50X6mm,2.8 Mtr Long 02 Nos. for each @9.2 Kg/Mtr |
| 43 | S/F of Bracing Angle 50X50X6mm,3.5 Mtr Long 04 Nos.(4.5Kg/mtr) |
| 44 | S/F of Belting Channel of 75X40X4.8 mm ,2.8 Mtr long each, 04 Nos(6.8Kg/Mtr) |
| 45 | S/F of 55 Sqmm AAA conductor |
| 46 | S/F of 3Cx300 mm² 11 KV XLPE Cable (Armoured),A2XFY |
| 47 | S/F of Heat shrinkable jointing kit for 3Cx300mm2 11 KV XLPE Cable(outdoor type) |
| 48 | S/F of Clamp for pipe |
| 49 | S/F of Lightning Arrester (12 KV, 10 KA) station class, Class-1 |
| 50 | S/F of 25X4 mm GI Flat |
| 51 | S/F of 40 mm nominal bore G.I. pipe (medium guage ) earthing device with 3 mtr long |
| 52 | S/F of PG clamp for 55 mm2 AAA conductor |
| 53 | S/F of HT Stay Set Complete . |
| 54 | S/F of 11 KV Stay insulator. |
| 55 | S/F of HT Stay Clamp(1.9 Kg/Pair) |
| 56 | S/F of 7/8 SWG G.I. Stay wire |
| 57 | S/F of GI Nuts &Bolts of Assorted size |
| 58 | S/F of Danger Board |
| 59 | S/F of Back Clamp for Danger Board (25X3mm GI Earth Flat ,0.59Kg/Mtr & 0.51Mtr for Each Back Clamp. |
| 60 | S/F of ANTICLIMBING DEVICE / Barbed wire (3 KG per supprot ) |
| 61 | S/F of Back Clamp for ACD (25X3mm GI Earth Flat ,0.59Kg/Mtr & 0.51Mtr for Each Back Clamp. |
| 62 | S/F of Fish Plate for DP (50x8mm of Flat ,0.97Kg/Mtr & 0.28Mtr Long for Each ) |
| 63 | S/F of Black paint |
| 64 | S/F of Yellow Paint |
| 65 | Sundries |
| 66 | CIVIL ITEMS |
| 67 | Concreting ratio 1:1.5:3 (500mmX500mmX1500mm) = 0.45Cu.mtr |
| 68 | Couping ratio 1:1.5:3 with dimension ( 500X500X450)= 0.1125 Cu mtr |
| 69 | Cement concreting for stud pole / stay anchor plate with C.C. 1:3:6 |
| 70 | Material for earthing including masonary work for earth pit, salt, charcoal and RCC Cover |
| 71 | Excavation of cable trench length (3 mtr W X 3 mtr D) by providing all necessary tool, Manpower, pump etc suitable for HT & LT Cable laying. Scope also includes supply of neccessry barricades at the excavation site. |
| 72 | Provide all necessary Manpower, Tool, Tackles, Barricades, Dewatering pump, Gunny bags,Compressor for excavation (3 mtr W X 3 mtr D) in Hard Surface. |
| 73 | Back fill the cable excvation site with same earth (3 mtr W X 3 mtr D). Scope also includes provide of necessary Tools,Machinery & Manpower for the activity. |
| 74 | Supply all materials required for backfilling and has to carry out the job of backfilling with sand, as per DISCOM Standards |
| 75 | Supply & Laying/Mounting and fixing of HDPE Pipe -160mm Dia ( PN-8,Grade PE-80)and sealing of the same for LT/HT Cables. Scope also includes providing and laying all required consumable etc. for collar fixing and sealing of Pipe. (Excavation is excluded) |
| 76 | Supply & Laying of PIPE HDPE 160 MM DIA PN8 , PE 80 through HDD method .Scope of work also includes making Trenchless ducts with 160 mm Dia HDPE pipe casing using HDD machine including supply of HDPE pipe as per IS 4984, (Providing parabolic graph included in the scope) |
| 77 | Cable looping Chamber with Brick at one side of joint (2.8 mtr. X 2.8 mtr.) |
| 78 | PCC (1:3:6(M-10 Grade)) below trench (Length 2800 mm, width 2800mm, thickness 75mm throughout) |
| 79 | Brick work Both Sides(2.8 mtr. L X 0.19 mtr W X 0.5 mtr D) with F.P.S. bricks of class designation 75mm in Cement mortar 1:4 (1 Cement : 4 Coarse sand) as per standard specifcation. Scope includes supply of all material |
| 80 | 15 mm cement plaster, All Sides (2.83+0.21 mtr. L X 0.5 mtr W) on the rough side of single brick wall of mix -1:4 (1 Cement : 4 Fine sand (50 % fine :50% coarse)) as per standard specification. Scope includes supply of all material. |
| 81 | Supply and erection of material for RCC partition slab 800mmX250mmX75mm (M-25 grade)- 12 Nos. with supply of all civil material (Cement, Sand & 10 to 12mm stone aggregate), with 8mm dia R/f cutting & bending etc. |
| 82 | Supply and Installation of cable Route marker including transportation from site/tent, excavation, refilling, disposing of malba, flooding with water, ramming/compacting of foundation as per standard specifications and drawing. |
| 83 | Survey of incremental/delta network and asset changes of 11KV network and updation in GESW databas |
| 84 | \\" Estimate for Shifting and Erection of 11 KV Line,DSS & LT Line due to widening of Road by R & B D ivision ,Nabarangpur for improvement of Dabugam Main Road to Angi River Bridge from Gandhi Park to Police Station under ESO Dabugam. |
| 85 | Estimate for Shifting and erection in Road Widening Work 1. 05 Nos 8 Mtr Long PSC Pole on LT Line 3x95+1x70+1x16 Sqmm LT AB Cable = 0.15 Km ( From D-E ).2. LT Line using 3x95+1x70+1x16 Sqmm LT AB Cable through HT Cum LT Line arrangement = 0.35 Km .3. Dismentaling of existing LT line of 09 Nos Span . |
| 86 | S/F of 8Mtr long 200kg PSC pole(including transportation cost upto store) |
| 87 | S/F of RCC Base Plate |
| 88 | S/F of Earthing Device Coil Type(GI) |
| 89 | S/F of No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr. For connecting pole with Coil earthing |
| 90 | S/F of Pole clamp for EYE hook for (XLPE Aerial bunched Cable) |
| 91 | S/F of Dead end clamp |
| 92 | S/F of EYE hook for (XLPE Aerial bunched Cable) for Dead End Clamp |
| 93 | S/F of Suspension Clamp with EYE hook for ABC |
| 94 | S/F of LT Stay Set Complete |
| 95 | S/F of L.T stay insulator |
| 96 | S/F of L.T stay clamp |
| 97 | S/F of 7/12 G.I. stay wire |
| 98 | S/F of GI Bolt Nut& washer |
| 99 | S/F of 3x95+1x70+1x16 mm2 LT XLPE Aerial bunched Cable |
| 100 | S/F of Danger Board |
| 101 | S/F of Back Clamp for Danger Board (25X3mm GI Earth Flat ,0.59Kg/Mtr & 0.51Mtr for Each Back Clamp. |
| 102 | S/F of ANTICLIMBING DEVICE / Barbed wire (3 KG per supprot ) |
| 103 | S/F of Back Clamp for ACD (25X3mm GI Earth Flat ,0.59Kg/Mtr & 0.51Mtr for Each Back Clamp. |
| 104 | S/F of Black paint |
| 105 | S/F of Yellow Paint |
| 106 | Sundries & minor materials |
| 107 | CIVIL ITEMS |
| 108 | Concrete material for stay anchor plate (0.45x0.45x1.5)mtr |
| 109 | Concreting ratio 1:1.5:3 (500mmX500mmX1500mm) = 0.375Cu.mtr |
| 110 | Couping ratio 1:1.5:3 with dimension ( 500X500X450)= 0.1125 Cu mtr |
| 111 | Survey of incremental/delta network and asset changes of LT network and updation in GESW databas |
| 112 | Dismantling of LT AB cable |
| 113 | \\" Estimate for Shifting and Erection of 11 KV Line,Dss & LT Line due to widening of Road by R & B D ivision ,Nabarangpur for improvement of Dabugam Main Road to Angi River Bridge from Gandhi Park to Police Station under ESO Dabugam. |
| 114 | Estimate for Shifting and erection in Road Widening Work 1. LT Line using 3x95+1x70+1x16 Sqmm LT AB Cable through HT Cum LT Line arrangement = 0.25 Km .2. Dismentaling of existing LT line of 06 Nos Span . |
| 115 | S/F of Pole clamp for EYE hook for (XLPE Aerial bunched Cable) |
| 116 | S/F of Dead end clamp |
| 117 | S/F of EYE hook for (XLPE Aerial bunched Cable) for Dead End Clamp |
| 118 | S/F of Suspension Clamp with EYE hook for ABC |
| 119 | S/F of GI Bolt Nut& washer |
| 120 | S/F of 3x95+1x70+1x16 mm2 LT XLPE Aerial bunched Cable |
| 121 | Sundries & minor materials |
| 122 | CIVIL ITEMS |
| 123 | Survey of incremental/delta network and asset changes of LT network and updation in GESW databas |
| 124 | Dismantling of LT AB cable Please Enable Macros to View BoQ information |