| 1 | Earth work in all kinds of soil including rough dressing and levelling the bed. direction of Engg -in- charge |
| 2 | Dismantlling and removing cement concrete including stacking the useful materials for re-use and removing the debries within 50mtr lead. (Data for 1 Cum) |
| 3 | Conveying the excavated earth by mechanical means within 5 km lead with loading and unloading etc. complete. |
| 4 | Supplying of all materials , Labour & T&P for laying sub-base in layers not exceeding 100 mm. watering and compacting to required density in OMC with P.R.R. but excluding costs conveyance of sub-base materials. |
| 5 | Providing laying, spreading and compacting graded stone aggregate to \\"WET MIX MACADAM\\" specification including premixing the materials with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in sub-base / base course on well prepared surface and compacting with vibratory roller to achive the desired density as per Clause 406 of MoSRT&H specification for road and bridge works (4th Revision). |
| 6 | Providing and applying primer coat with bitumen emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.60Kg/M2 using mechanical means as per clause 502 of MoSRT&H specification for road & bridge work (4th revision) (Data for 3500M2) |
| 7 | Supplying all materials, labour, T&P and applying tack coat over granular surface treated with primer etc complete. |
| 8 | Providind and laying \\"BITUMINOUS MACADAM\\" with hot mix plant using crushed aggregates of specified grading premixed with Bituminous binder of 60/70 penetration grade of bitumen transportred to site laid over a previously prepared surface with a hydrostatic paver finisher with mechanical control to the required grade level and alignment and rolling with smooth wheeled vibrating and tandem rollers to achieve the desired compaction as per clause 504 of MoSRT&H specification for Road & Bridge works. Data for 205 Cum (450 Tonne) |
| 9 | Providing and laying semi dense bituminous concrete with batch type hot mix plant using crushed aggregates of specified grading premixed with bituminous binder of 60/70 penetration grade of bitumen transporting the hot mix to work site laying with a hydro static paver finisher with mechanical control to the required grade, level and alignment rolling with smooth wheeled vibratory and tendem rollers to achieve the desired compaction as per clause 508 of MoSRT&H specification for road & bridge work. (Data for 195 Cum (450T) |
| 10 | Providing and laying of hot applied thermoplastic compound 2.5mm thick including rafleat rising glass beads @ 250gms per sqmt area thickness of 2.5mm is exclusive of surface applied glass beads as per IRC-35. The finished surface to be level, uniform and free from streaks and holes etc complete. |
| 11 | Filling in road side berm with ordinary soil incl. watering & ramming as directed by the EIC (incl. carriage of excavated eart with in 5.00 KM lead) |
| 12 | Providing and Laying Factory made Chamfered edge Cement Concrete Paver Bliocks of required strength, thickness & size/shape made by table Vibratory method , to attain superior smoth finish using PU or Equivalent moulds ,Laid in required gray colour and Pattern over 50mm thick Compacted bed of coarse sand , copmacting and proper embedding / laying of interlocking Paver Blocks into the sand bedding layer through vibratory compaction by using plate vibrator, Filling joints with Fine sand and cutting of Paver blocks as per required size/Pattern, finishing and sweeping extra sand in footpath , parks, lawns, drive ways, or light traffic parking and Lanes/Road etc, all complete as Per Manufacturers Specifications and Driection of Engg -In -Charge. 80mmm thick C.C. Paver Blocks of M-35 grade With approved colour design Pattern etc. complete. |
| 13 | C:C: (1:2:4) using 12 mm. size H.G. stone chips including the cost of all materials labour T&P sundries etc complete. |
| 14 | MS Grill for Median etc.. Complete. |
| 15 | Tree With Tree Guard….etc. complete. |
| 16 | Display Board… etc. complete Please Enable Macros to View BoQ information |