|
| 1 | Labour for boring tube well of required dia. by water jet system through any type of soil strata including hire and labour charges for boring pipes,scaffolding, tools and plants as necessary and taking out them and lowering pipes, strainers, blind pipe etc. and fitting and fixing the samecomplete including bucket washing and other incidental works in the connection. The tube well should have a minimum 50 mm gap in between the outside of the tubewell pipe and the bore. (d) For depth upto 150 metre for 50 mm dia. tube well with top enlargement of 100 mm dia. (ii) 100 mm dia. boring etc. top enlargement |
| 2 | Supplying, fitting and fixing PVC pipes for underground work of approved make of Schedule 80 (medium duty) conforming to ASTMD - 1785 and threaded to match with GI Pipes as per IS : 1239 (Part - I). with all necessary accessories, specials viz. socket, bend, tee, union, cross, elbo, nipple, longscrew, reducing socket, reducing tee, short piece etc. fitted including cost of all materials ,jointing materials, cutting pipes, making threads ,cutting trenches upto 1.5 metre below surface in all sorts of soil and refilling the same as directed complete in all respect. (Payment will be made on the centre line measurement of the total pipe line including all specials No separate payment will be made for accessories, specials.) Supply of PVC pipes & fittings Schedule 80 (medium duty) conforming to ASTMD - 1785 and threaded to match with GI Pipes as per IS : 1239 (Part - I).i) 100 mm dia PVC (ASTMD) |
| 3 | Supplying, fitting and fixing PVC pipes for underground work of approved make of Schedule 80 (medium duty) conforming to ASTMD - 1785 and threaded to match with GI Pipes as per IS : 1239 (Part - I). with all necessary accessories, specials viz. socket, bend, tee, union, cross, elbo, nipple, longscrew, reducing socket, reducing tee, short piece etc. fitted including cost of all materials ,jointing materials, cutting pipes, making threads ,cutting trenches upto 1.5 metre below surface in all sorts of soil and refilling the same as directed complete in all respect. (Payment will be made on the centre line measurement of the total pipe line including all specials No separate payment will be made for accessories, specials.) Supply of PVC pipes & fittings Schedule 80 (medium duty) conforming to ASTMD - 1785 and threaded to match with GI Pipes as per IS : 1239ii) 32 mm dia PVC (ASTMD) |
| 4 | Supplying, fitting and fixing in position G.I. pipes of TATA make for underground works with all necessary cessories,specials viz.socket, bend, tee, union, cross, elbow, nipple, short piece etc.including cost of all materials,jointing materials ,cutting pipes,making threads,cutting trenches upto 1.5 metre below surface in all sorts of soil and refilling the same as directed with two coats of painting on G.I. pipes and specials with bituminous paint complete in all respect. (Payment will be made on the centre line measurement of the total pipe line including all specials No separate payment will be made for accessories, specials.Payment for painting will be made seperately)(iii) 25 mm dia. medium quality |
| 5 | Supplying PVC strainer of approved make with adapter conforming to I.S.12818 specifications. iv) 100 mm dia.i) 100 mm dia PVC Stainer |
| 6 | Supply , transport , installation and commissioning of Solar PV installation for water pumping system consisting of solar panels framed in anodized aluminium frame mounted on stable hot dipped galvanized ( min 80 micron thickness) mild steel structure of rectangular hollow sections, angles, heavy duty pipes (all materials duly IS marked ) for providing sufficient strength with dual axis manual tracking arrangement which can withstand load of modules and high wind velocities upto 150 Km/hr, having RCC foundation designed against all possible loads (Dead, Live and imposed load). Modules supplied with the SPV system should have certificate as per IEC 61215 specification or equivalent National or International standards and must be interconnected with 4/6 sq.mm cables routed in PVC conduits properly fitted along the G.I structure to provide a good aesthetic view. Modules must qualify to IEC 61730 part I and part II for safety qualification testing. The power output of individual PV modules used in the PV array, under STC, should be of 335 Watts peak, with adequate provision for measurement tolerances. Solar cells should be crystalline silicon cell with min. efficiency of 14% and fill factor more than 70%, should be laminated between sheet of -Ethylene Vinyl Acetate (EVA) and high transmissivity 3.2mm tempered glass including appropriate DC to AC inverter and power controlling unit (protected with IP65 class enclosure) with MPPT technology to run at low sunshine and minimum 7 hours a day run with all necessary accessories suitable for solar + grid operation and including all protections of AC induction motor pump. There should be a display of all measurable parameters including storing of data at a set interval and transfer it in a pendive thru USB port . There should also be provision of interfacing GPRS based data transmission. The rate is inclusive of manufacturer's warranty and comprehensive maintenance for 1st year and comprehensive maintenace for 4 years beyond Ist year ( structure and foundation drawing enclosed for reference) |
| 7 | Supplying P.V.C. water storage tank of approved quality with closed top with lid (Black) - Multilayer (d) 2000 litre capacity |
| 8 | Supply, Fitting and fixing in position at site including carriage, Iron Removal Filter, capacity 3000 Liter Per Hour, with ISI mark of TATA/APEX. |
| 9 | Supplying, fitting, fixing, Chain link fencing of approved quality with R.C.C posts wooden posts or iron posts by means of galvanised \\"C\\" clips to grid of horizontal strands of galvanised high tensile spring steel wire of 12 S.W.G which have to be tensioned and fixed to the vertical posts by means of galvanised special clips, bolts and nuts etc. |
| 10 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm. |
| 11 | (II) Cement concrete with 30 mm down graded shingles excluding shuttering. N.B. Variety. In ground floor (a) 1:3:6 proportion |
| 12 | 125 mm. thick brick work with 1st class bricks in cement mortar (1:4) in ground floor. |
| 13 | Brick work with 1st class bricks in cement mortar (1:6) (a) In foundation and plinth |
| 14 | Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes (ii ) River Bazree |
| 15 | Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction.(a) For works in foundation and upto roof of ground floor/upto 4 m II. Other than SAIL/ TATA/RINL |
| 16 | Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor) (f) 25 mm to 30 mm shuttering without staging in foundation |
| 17 | Motor:- Supply and installation of three phase electro motor pump-motor set suitable for solar operation covering 5 years warranty for the following conditions including loading, unloading, transportation etc.:-C) upto 3 Hp ISI mark three phase surface mounted monoblock pump motor having discharge at required head as belowIII) open well submerssible pump set ISI marked as per IS: 14220 for PDW with discharge of 6.50 to 7.14 Lps at 18 mts total head of required quantity of flexible delivery pipe (15mtr) clamps bent, foot vaves and all other accessories to complete connection of suction and delivery side. |
| 18 | Supplying, fitting-fixing of iron frame display board at working site including writing with carring all other charges completed. ( L.S.) |
| 19 | Add @ 18% GST |
| 20 | Add @ 1% L.CESS Please Enable Macros to View BoQ information |